Plan Number: S19-058
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S19-058
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/20/2019 SBEASLE1 START PLANS SUBMITTED Completed
08/20/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed No review required. This project involves less than six lots.
08/20/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
08/20/2019 SBEASLE1 PIMA COUNTY WASTEWATER Passed
08/20/2019 SBEASLE1 OTHER AGENCIES PIMA ASSN OF GOVTS Passed Review not required. This agency was notified for their information only.
08/20/2019 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed Review not required. This agency was notified for their information only.
08/21/2019 MASHFOR1 COT NON-DSD FIRE Completed
08/21/2019 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change FROM:
Suzanne Gilpin, GIS Cartographer
Pima County Assessor's Office, (520)724-4387
DATE: August 21, 2019
RE:
Assessor's Review and Comments Regarding Final Plat-
S19-058 PLACITA DEL RIO 1ST SUBMITTAL

__X___ Plat does not meet Assessor's Office requirements.

COMMENTS:
There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision.
09/04/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Iman Monshizadeh
PDSD Zoning Review Section

PROJECT: Placita Del Rio Lots 1,6,7,8
Final Plat (1st Review) 904 W IRVINGTON RD
S19-058 C-2 Zoning

TRANSMITTAL DATE: September 3rd, 2018

DUE DATE: September 18th, 2018

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


*** Please Address comments 1, 2, and 3 and resubmit plans for review.



2-07.5.1.D Place the words "SEQ#________" in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder's Office at the time of recordation.

1. COMMENT: Add sequence number along the upper right edge of both sheets. The Q in the lower sequence appears to be blocked out, correction is required.


2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

2. COMMENT: This project has been assigned case number S19-058, List the case number in the lower right corner of both sheets.

2-07.5.6 Protective Covenants

Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will:
2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and

3. COMMENT: List the cross access recording information from this plat to the parcels to the west.

If you have any questions about this transmittal, Contact Iman Monshizadeh at Iman.Monshizadeh@tucsonaz.gov or (520) 791-5550 or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
09/04/2019 DAVID RIVERA HC SITE REVIEW Passed
09/12/2019 SBEASLE1 PIMA COUNTY ADDRESSING Approved (The "attached PDF" mentioned here can be viewed on PRO in the "Documents" section)

S19-058 / Placita Del Rio / 1st submittal is Approved by Pima County Addressing.
Please see the attached pdf for information regarding existing addresses and the new addresses that will be issued when this plat is recorded.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701
(520) 724-7570
09/16/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
09/17/2019 SBEASLE1 COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this development.
Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation, (520) 837-8040
Howard.Dutt@tucsonaz.gov
09/17/2019 ZELIN CANCHOLA COT NON-DSD TRAFFIC Reqs Change September 17, 2019
ACTIVITY NUMBER: S19-058
PROJECT NAME: Placita Del Rio
PROJECT ADDRESS: 904 W Irvington Rd
PROJECT REVIEWER: Zelin Canchola TDOT

Resubmittal Required: The following items must be revised and added to the Final Plat

1. The frontage of the property has a No Access Easement noted. Identify the existing access to the property. Begining and end.


If you have any questions, I can be reached at 520 837 6659 or zelin.canchola@tucsonaz.gov
09/18/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
09/20/2019 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on August 20, 2019. Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve future development. If easements are required, they will be obtained by separate instrument.

Please contact me at 520-917-8744 should you have any questions.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com
09/24/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Ensure the description of the signator in the acknowledgement statement matches the description of the signator for the dedication statement.
2. Provide a tie to a section corner or quarter corned.
3. Clearly show the extent of the no access easement with dimensions.
09/25/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
- A resubmittal is required
Permit/Activity Number: S19-058
Project Description: FINAL PLAT/MINOR SUBD - Placita Del Rio, shopping ctr. and food service.
Fees Due: $2,719.73
Note: We require payment prior to accepting your resubmittal.
Please pay the total fees (or Review Fees at a minimum):
1. Online
2. In person at the permit counter (Mon-Fri, 8:00 AM to 2:00 PM)
3. By mail - a check payable to City of Tucson, address is shown below, include the Activity Number

Online Payments (Visa, MC, Discover, American Express)
https://www.tucsonaz.gov/pdsd/online-resources-fees-maps-records
1. Total fees due: Payment portal may take 1-2 days to update to the correct total
2. Not case-sensitive but a hyphen is needed, e.g.: dp19-0000
3. Enter your Permit Nbr. and click the “Continue” tab
4. If any issues, try using the browser Internet Explorer.

To view the review comments: www.tucsonaz.gov/PRO, enter Activity Number.
(If information isn't shown yet, check back later as data uploads to PRO periodically.)
Submit the following items to the PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (listing your response to reviewer's comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
4) Name your 2nd submittal documents accordingly, for example: 2_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
09/25/2019 SBEASLE1 OUT TO CUSTOMER Completed