Plan Number: S19-051
Parcel: Unknown

Review Status: Completed

Review Details: LOT SPLIT REVIEW

Plan Number - S19-051
Review Name: LOT SPLIT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
10/24/2019 SBEASLE1 START PLANS SUBMITTED Completed
10/25/2019 DAVID RIVERA ZONING REVIEW Reqs Change PDSD TRANSMITTAL

FROM: David Rivera for Steve Shields
Zoning Review Section

PROJECT: 2433 E Cameron Vista - R-2 zone
S19-051
Land Split (2nd view)

TRANSMITTAL DATE: October 25, 2019

1. The land split plans and documents have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed.

2. The survey drawing that was uploaded to the drop box is not legible and appears to have been scanned and the actual size of the drawing is not the 24 x 36. Include in the next submittal a corrected version of the drawing and assure that the size is correct as produced by the surveyor. (It is recommended that applicant request a PDF version of the drawing correctly oriented in the landscape direction.)

3. The application must include a separate site plan drawing of each new lot with the lot coverage calculations listed or the survey drawing shall include the calculations for each lot. Lot coverage includes the building and vehicular use square footage, and the vehicular use area defined for each lot.

4. This land split review cannot be approved on this review. Zoning will review the next submittal.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956
11/01/2019 LOREN MAKUS ENGINEERING REVIEW Approved
11/05/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Reqs Change Show how the current buildings are connected to the public sewer. If they are all connected to a common sewer connection, provide a joint sewer use agreement. If the lots are to have independent sewer connections, show how lot 2 will be able to install an independent connection to the public sewer.
11/06/2019 SBEASLE1 ZONING-RECORDATION REVIEW Reqs Change LAND SPLIT PLAN RETURNED FOR CORRECTIONS NOTICE
- A resubmittal is required
Permit/Activity Number: S19-051 Please include this number on all future correspondence.
Project Description: LAND SPLIT - 2433 E. Cameron Vista.
Fee Balance: $0 (zero). Thank you for the payment.
View the documents and the reviewer's comments: www.tucsonaz.gov/pro
(If information is not available, check back later as data transfers to PRO periodically.)
- Home page, left side, “Activity Search”, enter the Activity Number
- “Permits” section, click on blue tab
- “Documents” section, click on blue icon to the right of each document
- "Reviews" section, click on "Review Details"

Submit the following items to the Filedrop. In the Project Description field, enter the Activity Number.
PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd
1) Comment Response Letter (your response to the reviewer's “Requires changes” comments)
2) Any other items requested by reviewers

After resubmittal, the Plan will enter a new 5-working-day Land Split review cycle.
Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
11/06/2019 SBEASLE1 OUT TO CUSTOMER Completed