Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S19-047
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/10/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
07/10/2019 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | Review not required. This agency was notified for their information only. |
07/10/2019 | SBEASLE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | Review not required. This agency was notified for their information only. |
07/10/2019 | SBEASLE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | Review not required. This agency was notified for their information only. |
07/11/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | February 20, 2019 Brixmor Property Group 1525 Faraday Ave., Ste 350 Carlsbad, CA 92008 Attn: Kyle Godat SUBJECT: Water Availability for Project: 65 W. River Rd , APN: 10509547A, Case #: WA2733 , T-13 R-13 S-13 , Lots: 2 , Location Code: TUC , Total Area: 4.71 , Zoning: C-2 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designated from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Sincerely, Michael Mourreale, P.E. Engineering Manager Tucson Water Department MM:ka CC:10509547A.docx |
07/11/2019 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | FROM: Janice Wagner, GIS Cartographer, Pima County Assessor's Office DATE:July 11, 2019 RE: Assessor's Review and Comments Regarding: MINOR SUBDIVISION NORTHMALL CENTER STARBUCKS LOTS 1& 2 / S19-047 ___X____ Plat does not meet Assessor's Office requirements. COMMENTS: ALL LOTS MUST BE NUMBERED AND HAVE SQUARE FOOTAGE. IF THE AREA IS TOO SMALL, THEY CAN HAVE A TABLE TO THE SIDE FOR THE SQUARE FOOTAGE. |
07/23/2019 | ROBERT SHERRY | PLUMBING-RESIDENTIAL | REVIEW | Completed | |
07/25/2019 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
07/25/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
07/30/2019 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) has reviewed and approves the minor subdivision for Northmall Center Starbucks Lots 1 and 2. If there are any questions, please contact me at 520-917-8744. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Land Resources – RC 131 3950 E. Irvington Road, Tucson, AZ 85714-2114 Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com |
07/31/2019 | JANE DUARTE | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are affected by this minor subdivision. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation, (520) 837-8040 Howard.Dutt@tucsonaz.gov |
08/01/2019 | PCAMARE1 | ZONING HC | REVIEW | Approved | |
08/01/2019 | PCAMARE1 | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Paul Camarena PDSD Zoning Review Section PROJECT: Minor Subdivision for Northmall Center Starbucks Lots 1 and 2 Final Plat (1st Review) - Related to DP18-0124 S19-047 - 65 W River Road C-2 Zoning TRANSMITTAL DATE: July 31, 2019 DUE DATE: August 7, 2019 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. 2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information: 2-07.5.1.A.1 The project site approximately centered within a one square mile area; 1. COMMENT: It appears that site map is not drawn to scale 3inch equal a 1 mile. Please revise site map. 2-07.5.1.A.2 Label the section, township, and range; section corners; north arrow; and the scale; 2. COMMENT: Provide all four corners with sections labeled. 2-07.5.1.A.3 Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and, 3. COMMENT: Please address the following; Label the arterial street 1st avenue on the location map, label the plat number of the subdivisions within the one-mile area of the location map. 2-07.5.1.A.4 The city's jurisdictional limits, if within the mapped area. 4. COMMENT: Provide the Jurisdictional limits for both the City of Tucson and Pima County. 2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 5. COMMENT: Provide the Subdivision case number S19-047, also rezoning case number and DP case number that was assigned. This must be placed in the lower right corner of the plat next to the title block. 2-07.5.2.D If the property is subject to conditions of rezoning, add the following note: "This plat is subject to the conditions of rezoning case number C9-__-__, unless superseded by a subsequent rezoning ordinance." 6. COMMENT: Provide rezoning case number C9-88-02 in the lower right corner of both sheets. 2-07.5.2.G If a Board of Adjustment variance is granted, provide the following note: "This plat is subject to Board of Adjustment variance C10-__-__, unless expired or superseded by a subsequent application." 7. COMMENT: Provide the Board of Adjustment variance case number C10-18-15. 2-07.5.2.I If the subdivision was the result of a rezoning case and did not require submittal and review of a tentative plat, add the following note: "Any relocation, modification, etc., of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the public." 8. COMMENT: Any relocation, modification, etc., of existing utilities and/or public improvements necessitated by the proposed development will be at no expense to the public 2-07.5.3.D Approval and Recording Data Blocks The APPROVAL paragraph, where the City Clerk certifies that the plat has been approved by Mayor and Council, and the RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat adjacent to each other. The paragraphs are as follows. APPROVAL "I, (fill in name of current City Clerk), Clerk of the City of Tucson, Arizona, hereby certify that this plat was approved by the Mayor and Council of the City of Tucson, Arizona, on this ____ day of __________, 20__." ____________________________________________ ______________ Clerk, City of Tucson Date Sequence________________ Fee_____________________ State of Arizona County of Pima I hereby certify that the instrument was filed for record at the request Of__________________________ Date________________________ Time_________________________ Witness my hand and Official Seal day and year above written. F. ANN RODRIGUEZ, County Recorder BY___________________________ Deputy 9. COMMENT: Move the recording text block section under the city clerk approval text block 2-07.5.3.E Assurances The following ASSURANCE block must be placed on the plat's first sheet. ASSURANCES "This is to certify that all improvements, such as streets, sidewalks, sewers, water and utility installation, drainage and flood control facilities, and monuments, required by the City of Tucson have been completed or the future completion of such improvements has been assured by a land trust financial assurance agreement, the posting of performance bonds, an escrow account, letter of credit, or other security as the City of Tucson deems necessary and proper. In the event that any such assurance expires, lapses or is otherwise inadequate to assure the completion of assurable infrastructure, the city may suspend the issuance of building permits or certificates of occupancy." City of Tucson Planning and Development Services Department Director City of Tucson Engineer 10. COMMENT: Revise the Assurance City of Tucson PDSD Engineering Administrator designation to "City of Tucson Engineer". 2-07.5.4.B. Identify each block or lot within the subdivision boundary by number, and include the square footage of each; 11. COMMENT: Provide the square footage of each lot. Provide legal descriptions for each new lot. If you have any questions about this transmittal, Contact Paul Camarena any time during the week at (520) 791-5550 or by email Paul.Camarena@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
08/05/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
08/06/2019 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | S19-047 / Northmall-Starbucks / 1st submittal is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 4th Floor Tucson, AZ 85701 (520) 724-7570 |
08/12/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Revise the second signature line for the Assurances section. The line should be labelled: "City of Tucson City Engineer." 2. Provide a tie from the proposed subdivision to a section corner or quarter corner. |
08/13/2019 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | |
08/13/2019 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Passed | Reviewed and approved in DP18-0124. |
08/13/2019 | ALEXANDRA HINES | PIMA COUNTY | WASTEWATER | Approved | P19WX01315 |
08/14/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
08/14/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |