Plan Number: S19-042
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S19-042
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/25/2019 SBEASLE1 START PLANS SUBMITTED Completed
06/25/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed Less than six lots, no review needed.
06/25/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
06/26/2019 ED ABRIGO PIMA COUNTY ASSESSOR Approved FROM: Janice Wagner, GIS Cartographer, Pima County Assessor's Office
DATE: June 26, 2019
RE: Assessor's Review and Comments Regarding:
PEARSON ESTATES LOTS-4 / S19-042 FIRST FINAL REVIEW
X Plat meets Assessor's Office requirements.

COMMENTS: NONE
07/16/2019 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on June 25, 2019, and is unable to approve the plat at this time.
Please increase the Public Utility Easement on Lot 4 from 10 feet in width to 16 feet in width to accommodate TEP equipment for maintenance and repair of the overhead facilities that serve the property.
If there are any questions, please contact me at 520-917-8744.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co., Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com
07/22/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Paul Camarena
PDSD Zoning Review Section

PROJECT: Pearson Estates, Lots 1-4 Residential Use Group / SFR Development
Final Plat (1st Review) - 9161 E. MAGDALENA ROAD
S19-042 - Current Zoning SR - Proposed Zoning is RX-1 per Rezoning Case number C9-18-07

TRANSMITTAL DATE: July 22, 2019

DUE DATE: July 23, 2019

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.


2-07.5.1.D Place the words "SEQ#________" in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder's Office at the time of recordation.

1. COMMENT: Place the "SEQ" as per standard above.



2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

2. COMMENT: Provide the subdivision case number, S19-042 in the right hand corner of the plat next to the title block.
3. COMMENT: Final Plat approval pending Rezoning approval.

4. COMMENT: Addressing block is not required for final plat.

If you have any questions about this transmittal, Contact Paul Camarena any time during the week at (520) 791-5550 or by email Paul.Camarena@Tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
07/23/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Provide the subdivision case number.
2. Provide a tie to a section corner or quarter corner.
07/24/2019 ALEXANDRA HINES PIMA COUNTY WASTEWATER Reqs Change The applicant is responsible for obtaining review and approval for wastewater from Pima County at sewer@pima.gov prior to Mayor & council approval. Please provide Pima County approval in resubmittal.
07/29/2019 SBEASLE1 PIMA COUNTY ADDRESSING Approved S19-042 / 1st subm. for review / Pearson Estates - Final Plat is Approved by Pima County Addressing.
Upon recording the following addresses will be issued:
Lot 1: 9131 E Magdalena Rd, Lot 2: 9141 E Magdalena Rd
Lot 3: 9151 E Magdalena Rd
Lot 4: 9161 E Magdalena Rd (existing address for SFR on parcel 134020070)
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701
(520) 724-7570
08/02/2019 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Approv-Cond August 2, 2019
Oracle Engineering Group, Inc.
Attn: Peter Salonga
3544 N Romero Rd, Suite 100
Tucson, AZ 85705

Subject: Final Plat for (S19-042) Pearson Estates, Lots 1-4

The above referenced project has been conditionally approved by the City Development
Review Committee to prepare for Mayor & Council approval. Please submit five (5) weeks
in advance to the Mayor & Council meeting. The final plat can only be approved by Mayor
& Council following the 30-day appeal period after the rezoning ordinance approved by
Mayor & Council. Please take the following actions and submit the following items at the
permit counter:

1. Address Zoning, Engineering, Wastewater, TEP review comments along with
comment response letter.

2. Original set of executed and notarized (permanent, black ink only) Final Plat on
double matte océ or photo mylar.

3. Title report current within the last thirty (30) days or statement from Title Company
certifying the title report previously submitted is still valid.

4. Check or money order made payable to “Pima County Recorder” in the amount of:
$20.00 per plat page plus a flat $4.00 handling fee, along with flat $30.00 fee per
document for Consent to Dedicate and CC&R (if applicable). The City pays to record
the Assurance Agreement. If you are unsure of the fees, please call the County
Recorder’s Office at 520-740-4350. Check must be dated within 45 days of the
scheduled Mayor & Council meeting.

5. Original set of executed and notarized CC&R (if applicable).

6. Original set of executed and notarized Assurance Agreement (if applicable). For
Third Party Land Trust, provide original Agreement to Construct, original
Amendment to Trust, and copy of Trust Agreement.

7. Property owner(s) and consultant mailing addresses to receive notification one (1)
week prior to and following the Mayor & Council meeting.

8. Upload a PDF scan of executed Plat, CC&R (if applicable), Assurance Agreement (if
applicable), and title report to www.tucsonaz.gov/file-upload-pdsd.

The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor &
Council meeting. The City Development Review Committee ensures the Assurance
Agreement is reviewed by the City Attorney’s Office prior to the Mayor & Council
meeting. The recorded CC&R will be mailed to the address on the cover sheet. The City
Clerk’s Office keeps the recorded Final Plat and Assurance Agreement. A copy of the
recorded Final Plat and Assurance Agreement will be available on www.tucsonaz.gov/pro.

Should you have any questions, please contact Alexandra Hines at 520-837-6975 or
alexandra.hines@tucsonaz.gov.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/02/2019 AHINES2 OUT TO CUSTOMER Completed