Plan Review Detail
Review Status: Completed
Review Details: LOT SPLIT REVIEW
Plan Number - S19-041
Review Name: LOT SPLIT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/18/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
06/19/2019 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | PLAN REVIEW COMMENTS Roof projections may not extend to a point closer than 2 feet from the property line. Provide a building permit application and plan showing compliance with R302.1 (City of Tucson Amended) by removing the roof overhang along the new property line, or provide one-hour fire-resistive construction on the underside. If you have any questions please contact: Ken Van Karsen (520) 837-4912 City of Tucson Residential Plan Review |
06/19/2019 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Independent water services and sewer connections are required for the two proposed lots. |
06/19/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | Tucson Water approves this lot split. Thank you, Ray Munoz |
06/19/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
07/01/2019 | SSHIELD1 | H/C SITE | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: 9234 E Calle Maria S19-041 Land Split (1st Review) TRANSMITTAL DATE: July 1, 2019 1. The land split plans and documents have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Based on the provided plan it does not appear that the existing structure will meet perimeter yard setback requirements. Per Unified Development Code (UDC) Table 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES the required perimeter yard setback is 6'-0" or 2/3 Height of the proposed exterior building wall. As no building elevations were provided Zoning cannot provide the required UDC comments for the Design Development Option (DDO). Provide building elevation with the next submittal. Until the DDO is submitted and approved the Land Split cannot be approved. 3. Based on the most current aerial photos of this site there are accessory structures located on the proposed southern lot. Per UDC Article 6.6.2.B accessory structures shall only be built on a lot occupied by a principal building. Review of our permitting system does not show that demolition permits have been issued. 4. Until all other review agencies have approved the land split zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
07/02/2019 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | PDSD TRANSMITTAL FROM: Steve Shields Section Manager PROJECT: 9234 E Calle Maria S19-041 Land Split (1st Review) TRANSMITTAL DATE: July 1, 2019 1. The land split plans and documents have been reviewed by Zoning Review Section but cannot approve the plan until all zoning comments or concerns have been addressed. 2. Based on the provided plan it does not appear that the existing structure will meet perimeter yard setback requirements. Per Unified Development Code (UDC) Table 6.3-2.A: DIMENSIONAL STANDARDS FOR THE R-1, R-2, R-3, MH-1, & MH-2 ZONES the required perimeter yard setback is 6'-0" or 2/3 Height of the proposed exterior building wall. As no building elevations were provided Zoning cannot provide the required UDC comments for the Design Development Option (DDO). Provide building elevation with the next submittal. Until the DDO is submitted and approved the Land Split cannot be approved. 3. Based on the most current aerial photos of this site there are accessory structures located on the proposed southern lot. Per UDC Article 6.6.2.B accessory structures shall only be built on a lot occupied by a principal building. Review of our permitting system does not show that demolition permits have been issued. 4. Until all other review agencies have approved the land split zoning cannot approve. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |
07/02/2019 | SBEASLE1 | ZONING-RECORDATION | REVIEW | Reqs Change | LAND SPLIT PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. Fee Balance: $99.00 (see the Balance column in the image below). Prior to the completion of the next review, we require payment of the total fees (or the Review fees at a minimum). You may pay in person at the City of Tucson permit counter (Mon-Fri, 8:00 AM to 2:00 PM) or mail a check payable to the City of Tucson (see address below). Please write your Activity Number on the check. Activity Number: S19-041 Project Description: LAND SPLIT / DDO - 9234 E. Calle Maria, resplit into two parcels. For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.) Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, please include the Activity Number. 1) Comment Response Letter (states how all reviewer comments were addressed) 2) Any other items requested by reviewers After resubmittal, the Plan will re-enter the 5-working-day Land Split review cycle. Thank you. Sharon Beasley, Permit Technician City of Tucson Planning and Development Services Attn: Permit Counter/Payments 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
07/02/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |