Plan Number: S19-039
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S19-039
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/12/2019 SBEASLE1 START PLANS SUBMITTED Completed
06/12/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved See water letter in documents table on PRO.
06/12/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
06/14/2019 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The "attached PDF" mentioned here can be viewed on PRO in the "Documents" section)

S19-039 / 1st subm. for review / Bella Tierra (Wingate) - Final Plat is being Returned for Corrections by Pima County Addressing.
The attached pdf contains Addressing’s comments.
Please let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701
(520) 724-7570
06/25/2019 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Reqs Change June 25, 2019
Sharon Beasley, Permit Technician
City of Tucson
201 North Stone Avenue, First Floor
Tucson, AZ. 85701
RE: S19-039 Bella Tierra (Wingate) / 1st Submittal, Received June 12, 2019
Dear Ms. Beasley,
Thank you for the opportunity to comment on S19-039, Bella Tierra (Wingate); 1st Submittal, a development package application of a final plat for an approximately 48.68 acre site, located northeast of the intersection of East Irvington Road and South Camino Seco. The property is zoned Residence Zone 1 (R-1), with the proposed development being a single family home residential development.
This site is within FAA Part 77 airspace.
The Tucson Airport Authority conditionally approves the subject request contingent upon the following conditions of approval, as noted below. This condition shall be identified in the general notes of the revised development plan.
Conditions of approval:
1. "According to the Federal Aviation Administration (FAA) Notice Criteria Tool, this project area is located in proximity to a navigation facility and could impact navigation signal reception. The project applicant shall file FAA Form 7460 with the FAA at least 45 days before construction activities begin unless FAA staff, with the Obstruction Evaluation / Airport Airspace Analysis (OE/AAA), provides the project applicant with written communication that filing FAA Form 7460 is not required. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp"

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,
Scott Robidoux, Senior Airport Planner
07/02/2019 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on June 12, 2019, and is unable to approve at this time. TEP was notified on June 28, 2019 that lot revisions have been made and as a result, a revision to our initial equipment placement is required. Once the electrical design is completed and easements for TEP facilities can be shown on the final plat , please resubmit for approval.

If there are any questions, please contact me at 520-917-8744.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co., Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895
mburke@tep.com
07/10/2019 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Bella Terra 1A and 1B, Lots 1-227 and Common Areas A and B - FLD Subdivision
Final Plat (1st Review) - 8903 E. Linderbrook Drive
S19-039 - R-1 Zoning (FLD Residential Development)

TRANSMITTAL DATE: July 10, 2019

DUE DATE: July 11, 2019

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)

2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.


2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

1. COMMENT: List the PDSD assigned subdivision case number S19-039 in the lower right corner of al final plat sheets.


2-07.5.4.B. Identify each block or lot within the subdivision boundary by number, and include the square footage of each;

2. COMMENT: Clarify if the C5 curve data for the radius at the corner of the northwest corner common area along the northwest corner of lot 227 includes the information between the two points just south of the C5 curve data designation.

The distance and bearing for the short line along the south side of common area next to lot 137 has not been labeled. Add the information as required.


2-07.5.4.H. Show no-vehicular access easements where applicable;

3. COMMENT: If applicable indicate the locations proposed with one-foot no access easements.


2-07.5.4.K. If the plat represents one phase of a multiphased project and access is provided through this phase to the future phases, indicate the access easements or public streets on this plat that will guarantee the access; and,

4. COMMENT: Per the tentative plat, this project was to be phased, clarify if this is still a phased development?

If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
07/15/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change CC&Rs
1. Revise section 4.6 to remove the extraneous letters.
2. Change the reference in section 7.9.1 to the City instead of the County. Change references to the County to City throughout the document, as applicable. Provide a definition of City in the definition section.
07/17/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required
Fee Balance: $6,833.76.
NOTE: We now have an online payment option – it’s available for some permits (but not all). Below is the link. If unable to use this option, you may pay in person or mail a payment.

IMPORTANT: If making payment via online, send a PDF of your payment receipt with your next upload. City staff doesn’t have direct access to view your online payments.

Link to Online Payments, City of Tucson:
https://www.tucsonaz.gov/pdsd/online-resources-fees-maps-records
Not case-sensitive but a hyphen is needed, e.g.: dp19-0000
Simply type in your Permit Nbr. and press enter on your keyboard.

Please pay the total fees, or Review Fees at a minimum, at the permit counter (Mon-Fri, 8:00 AM to 2:00 PM) or mail a check (payable to City of Tucson – address is shown below) prior to the completion of the first review. Include the Activity Number on your check.
Activity/Permit Number: S19-039
Project Description: FINAL PLAT - Bella Tierra, 1A and 1B, an FLD, lots 1-227, common area "A" (functional open space, landsc, drainage, public & priv utilities), "B" (drainage, landsc, public & priv utilities). A resubdivision of part of Wingate, lot 3.
Project Manager: John.VanWinkle@TucsonAz.gov, (520) 837-5007
For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number.
(If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
Please name your 2nd submittal documents accordingly, for example: 2_Final Plat.
Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (listing your response to reviewer's comments)
2) Complete Plan Set (all pages, full set)
3) Any other items requested by review staff
Upon resubmittal, the plans will re-enter the standard 20-working-day review cycle.
Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701
07/17/2019 ED ABRIGO PIMA COUNTY ASSESSOR Approved FROM:
Julieann Arechederra, GIS Cartographer
Pima County Assessor's Office
DATE: July 16, 2019
RE: Assessor's Review and Comments Regarding:
BELLA TIERRA 1A AND 1B FINAL PLAT S19-039 2ND SUB

X Plat meets Assessor's Office requirements.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/17/2019 SBEASLE1 OUT TO CUSTOMER Completed