Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - PACKAGE
Plan Number - S19-035
Review Name: FINAL PLAT - PACKAGE
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/01/2019 | PMARTIN1 | START | FINAL PLAT PACKAGE | Completed | |
| 10/02/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Sueño Hermoso, Lots 1-6 and Common Areas A and B Final Plat (1st Review) - 5931 S. Randall Boulevard S19-035 - R-2 Zoning / Related to DP17-0297 TRANSMITTAL DATE: October 2, 2019 DUE DATE: October 15, 2019 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. 2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 1. COMMENT: 2-07.5.1.H - List the DP case number DP17-0297 next to the title block of both sheets. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 10/11/2019 | SBEASLE1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Approved | S19-035 / 2nd Submittal for review / Sueno Hermoso is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 4th Floor Tucson, AZ 85701 (520) 724-7570 |
| 10/11/2019 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. The CC&Rs must be revised to provide for basin and drainage facility inspection and maintenance as required by the drainage manual section 14.3. 2. Since the subdivision has been placed into a trust, the beneficiary of the trust must be listed on the plat. (AM 2-07.5.3.C) 3. In the approval section, provide the name of the person or company requesting recordation. 4. The change in ownership and assurances from the first submittal to this submittal has created confusion. Since the ownership is now in the trust, all ownership references should be to the trust. 5. Ensure all signature lines for declaration are completed. 6. A copy of the trust agreement must be included in the submittal. 7. The originals of the assurances documents must be submitted. 8. The check for recordation must be $74. |
| 10/15/2019 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on October 3, 2019. Electrical service will be provided to this subdivision in accordance with the rules and regulations approved by the Arizona Corporation Commission. If there are any questions, please contact me at 520-917-8744. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Land Resources – RC 131 3950 E. Irvington Road, Tucson, AZ 85714-2114 Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com |
| 10/15/2019 | SBEASLE1 | CDRC STAFF | CITY AGENDA OFFICE | Completed | |
| 10/15/2019 | SBEASLE1 | CDRC STAFF | CITY CLERK'S OFFICE | Completed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/15/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |