Plan Number: S19-035
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S19-035
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/31/2019 SBEASLE1 START PLANS SUBMITTED Completed
05/31/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved 12/20/2017 Tucson Water approves capacity for 6 lots.
05/31/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed Review not required. This agency was notified for their information only.
06/07/2019 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change (The "attached PDF" mentioned here can be viewed on PRO in the "Documents" section)

S19-035 / 1st Submittal for review / Sueno Hermoso is being Returned for Corrections by Pima County Addressing.
The attached pdf contains Addressing’s comments.
Please let me know if you have any questions or if I may assist you further.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701
(520) 724-7570
06/24/2019 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on May 31, 2019, and is unable to approve the plat at this time. An electrical design must be completed and easements for TEP facilities shown on the plat before TEP can approve. In order for TEP to complete the electrical design, please approve the Equipment Placement that was provided to RMJR Engineering on January 16, 2018 by signing and returning the Equipment Placement letter that accompanied the drawing.
In addition, please add the following language to the final plat DEDICATIONS:
"AN EASEMENT IS GRANTED TO TUCSON ELECTRIC POWER FOR THE PURPOSE OF ACCESS, INSTALLATION AND MAINTENANCE OF ELECTRICAL METERS, CABLE AND CONDUITS THAT WILL BE GROUPED TOGETHER AND ATTACHED TO EXTERIOR WALLS."

If there are any questions, please contact met at 520-917-8744.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895
mburke@tep.com
06/27/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change S19-035
1. Label the section corner or quarter corner the subdivision boundaries are tied to.
2. This subdivision is creating more new private street than indicated. Please correct the applicable note.
3. Keynote 1 indicates a 7-foot easement. The easement dimensions vary. Change the description to match the plans. I recommend showing the dimensions on the plan and have the note indicate "Utility Easement - dimension as shown" or the equivalent.
07/02/2019 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: Sueno Hermoso Lots 1-6
Final Plat (1st Review)
S19-035

TRANSMITTAL DATE: July 2, 2019

DUE DATE: June 28,m 2019

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above

2-07.5.0 CONTENT REQUIREMENTS

5.1 General

2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:

2-07.5.1.A.2 Label the section, township, and range; section corners; north arrow; and the scale;

1. COMMENT: The section corners are not labeled correctly, northeast corner of section 7 is labeled 26, and along the southern section corners the sections should be labeled 13, 18, 17 left to right.

2-07.5.1.A.3 Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and,

2. COMMENT: Label all subdivisions within the square mile of the location map.

2-07.5.1.D Place the words "SEQ#________" in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder's Office at the time of recordation.

3. COMMENT: Provide the "SEQ#________" as required above.

2-07.5.1.E Provide a title block in the lower right corner of each sheet with the following information:

2-07.5.1.E.1 Subdivision name; number of blocks, lots, and/or units; and common area;

4. COMMENT: Common areas should list what the common area are such as "PRIVATE STREET" etc.

2-07.5.1.E.3 If the final plat is a resubdivision of a previously recorded plat, indicate the title and the book and page/sequence number reference of the existing subdivision.

5. COMMENT: The title block should include "A RESUBDIVISION OF LOS RANCHITOS NUMBER 6 LOT 246" etc.

2-07.5.1.H The S(Year)-___ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

6. COMMENT: Place the subdivision case number, S19-035, in the lower right corner of the plat next to the title block.

2-07.5.3 Standard Paragraphs
The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.


2-07.5.3.D Approval and Recording Data Blocks
The APPROVAL paragraph, where the City Clerk certifies that the plat has been approved by Mayor and Council, and the RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat adjacent to each other. The paragraphs are as follows.

7. COMMENT: The "APPROVAL" block should match what is shown in AM 2-07, "I ROGER W. RANDOLPH, CLERK OF THE CITY OF TUCSON, ARIZONA, HEREBY CERTIFY THAT THIS PLAT"

2-07.5.6 Protective Covenants

Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will:

8. COMMENT: As this is a new subdivision new CC&R's are required.

If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
07/03/2019 ALEXANDRA HINES PIMA COUNTY WASTEWATER Approved P19WC00079 and P18WS00005 has been issued and approved.
07/08/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
The fee balance is $0 (zero). Thank you for the payment.
Activity Number: S19-035
Project Description: FINAL PLAT - Sueno Hermoso, Lots 1-6 and common areas "A" and "B."
For review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number.
(If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.)
After all corrections are made, please name your 2nd submittal documents accordingly, for example: 2_Plan_Set.
Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd.
In the Project Description field, please include the Activity Number.
1) Comment Response Letter (listing how all comments were addressed)
2) Complete Plan Set (all pages, full set)
3) Any other items requested by review staff
After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The Project Manager can be contacted at: Alexandra.Hines@TucsonAz.gov, (520) 837-6975.
Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter
201 N. Stone Avenue, First Floor
Tucson, AZ 85701
07/08/2019 ED ABRIGO PIMA COUNTY ASSESSOR Approved FROM:
Julieann Arechederra, GIS Cartographer, Pima County Assessor's Office
DATE: July 8, 2019
RE: Assessor's Review and Comments Regarding:
SUENO HERMOSO S19-035
X Plat meets Assessor's Office requirements.
07/08/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change July 12, 2019
Solis Engineering Co
Attn: Rick Solis
5325 S Civano Bl
Tucson, AZ 85747

Subject: Final Plat for (S19-035) Sueno Hermoso, Lots 1-6 and Common Areas “A”
and “B”

The above referenced project has been conditionally approved by the City Development
Review Committee to prepare for Mayor & Council approval. Please submit five (5) weeks
in advance to the next available Mayor & Council meeting, September 4, 2019. Please take
the following actions and submit the following items at the permit counter:

1. Address Zoning, Engineering, Addressing, and TEP review comments along with
comment response letter.

2. Original set of executed and notarized (permanent, black ink only) Final Plat on
double matte océ or photo mylar.

3. Title report current within the last thirty (30) days or statement from Title Company
certifying the title report previously submitted is still valid.

4. Check or money order made payable to “Pima County Recorder” in the amount of:
$20.00 per plat page plus a flat $4.00 handling fee, along with flat $30.00 fee per
document for Consent to Dedicate and CC&R (if applicable). The City pays to record
the Assurance Agreement. If you are unsure of the fees, please call the County
Recorder’s Office at 520-740-4350. Check must be dated within 45 days of the
scheduled Mayor & Council meeting.

5. Original set of executed and notarized CC&R (if applicable).

6. Original set of executed and notarized Assurance Agreement (if applicable). For
Third Party Land Trust, provide original Agreement to Construct, original
Amendment to Trust, and copy of Trust Agreement.

7. Property owner(s) and consultant mailing addresses to receive notification one (1)
week prior to and following the Mayor & Council meeting.

8. Upload a PDF scan of executed Plat, CC&R (if applicable), Assurance Agreement (if
applicable), and title report to www.tucsonaz.gov/file-upload-pdsd.

The Final Plat, CC&R, and Assurance Agreement must be approved at the same Mayor &
Council meeting. Staff ensures the Assurance Agreement is reviewed by the City
Attorney’s Office prior to the Mayor & Council meeting. The recorded CC&R will be
mailed to the address on the cover sheet. The City Clerk’s Office keeps the recorded Final
Plat and Assurance Agreement. A copy of the recorded Final Plat and Assurance Agreement
will be available on www.tucsonaz.gov/pro.

Should you have any questions, please contact Lead Planner, Alexandra Hines, AICP, at
520-837-6975 or alexandra.hines@tucsonaz.gov.

Final Status

Task End Date Reviewer's Name Type of Review Description
07/08/2019 SBEASLE1 OUT TO CUSTOMER Completed