Plan Review Detail
Review Status: Completed
Review Details: SUBPLAT- OK TO SUBMIT
Plan Number - S19-027
Review Name: SUBPLAT- OK TO SUBMIT
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/22/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 04/22/2019 | ALEXANDRA HINES | ZONING | REVIEW | Denied | These are preliminary comments to obtain a complete submittal. This is not a substantial review. 1. Provide a new plat in conformance with UDC Administrative Manual 2-07. The 'submittal requirements' supplement next to development package application at https://www.tucsonaz.gov/pdsd/all-application-forms-submittal-requirements can be used as a reference. Alexandra Hines 837-6975 alexandra.hines@tucsonaz.gov |
| 04/23/2019 | SBEASLE1 | PIMA COUNTY - ADDRESSING | PIMA COUNTY - ADDRESSING | Needs Review | This project does require review by Pima County Addressing. Thank you Nicholas Jordan, Addressing Specialist Pima County Development Services Department 201 N Stone AV, Tucson, AZ 85701 (520) 724-9623 |
| 04/23/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Denied | Preliminary review for Ok to Submit 1) The plan submitted for review does not meet the minimum standards as outlined in the City of Tucson Administrative Manual (AM) section 2-07. Review AM Section 2-07 and submit a drawing that is in substantial compliance with the standards outlined. See the link below http://library.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/tucsonazunifieddevelopmentcode?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az 2) Note that when adding assurance 2-07.5.3.E "City of Tucson PDSD Engineering Administrator" needs to change to "City of Tucson City Engineer" John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
| 04/24/2019 | SBEASLE1 | WWM | REVIEW | Needs Review | The Applicant is responsible for obtaining review and approval for wastewater from Pima County (email: Sewer@Pima.gov) prior to Mayor & Council approval of the final plat. Please provide an approval document in the next resubmittal. |