Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S19-022
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/15/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
04/15/2019 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | A review is not required. This agency was notified for their information only. |
04/15/2019 | SBEASLE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | A review is not required. This agency was notified for their information only. |
04/15/2019 | SBEASLE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | A review is not required. This agency was notified for their information only. |
04/18/2019 | JIM EGAN | COT NON-DSD | FIRE | Completed | |
04/18/2019 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | FROM: Suzanne Gilpin, GIS Cartographer, Pima County Assessor's Office, (520)724-4387 DATE: April 17, 2019 RE: Assessor's Review and Comments Regarding Final Plat- S19-022 / ROLLINGS BARRIO 1ST SUBMITTAL __X___ Plat does not meet Assessor's Office requirements. COMMENTS: There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision. |
04/29/2019 | ROBERT SHERRY | PLUMBING-RESIDENTIAL | REVIEW | Completed | |
05/06/2019 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
05/06/2019 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
05/07/2019 | KAY MARKS | PIMA COUNTY | ADDRESSING | Reqs Change | (The PDF attachment mentioned here can be viewed on PRO in the "Documents" section) The Addressing review of S19-022, Rollings Bario Lots 1-7, 1st submittal, is being Returned for Corrections by Pima County Addressing. The attached pdf contains Addressing’s comments. Please let me know if you have any questions. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 4th Floor Tucson, AZ 85701 (520) 724-7570 |
05/07/2019 | JANE DUARTE | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are affected by this Minor Subdivision. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation (520) 837-8040 Howard.Dutt@tucsonaz.gov |
05/10/2019 | DAVID RIVERA | ZONING HC | REVIEW | Approved | |
05/10/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Rollings Barrio - Lots 1 through 7 Final Plat (1st Review) 501 S. Meyer Avenue S19-022 - HO-3 and HC-3 TRANSMITTAL DATE: May 10, 2019 DUE DATE: May 13, 2019 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. 2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information: 2-07.5.1.A.3 Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and, 1. COMMENT: Label 6th Avenue, Main Street, Granada Avenue. 2-07.5.1.E Provide a title block in the lower right corner of each sheet with the following information: 2-07.5.2.D If the property is subject to conditions of rezoning, add the following note: "This plat is subject to the conditions of rezoning case number C9-__-__, unless superseded by a subsequent rezoning ordinance." 2. COMMENT: List as reference the rezoning case number C9-74-20 next to the title block of all sheets. 2-07.5.4.H. Show no-vehicular access easements where applicable; 3. COMMENT: If applicable show the locations of any no-vehicular access easements. 2-07.5.6 Protective Covenants Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will: 2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and 4. COMMENT: Are CC&R's proposed for this development, if so include a copy with the next submittal of the final plat. 5. COMMENT: Consult with the Building plans reviewer regarding fire code for the building on Lot 4. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
05/13/2019 | ALEXANDRA HINES | PIMA COUNTY | WASTEWATER | Reqs Change | Applicant is responsible for obtianing review and approval for wastewater from Pima County at sewer@pima.gov prior to Mayor & Council approval. Provide approval letter in resubmittal. |
05/15/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | S19-022 1) Provide a tie by course and distance to a section corner, quarter section corner, or an established city or county survey monument per City of Tucson (COT) Administrative Manual (AM) section 2-07.5.5 2) Add S19-022 to all sheets John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
05/16/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. Activity Number: S19-022 Project Description: MINOR SUBD - Rollings Barrio, Lots 1-7. To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If information isn't shown yet, check back later as data flows to PRO periodically throughout the day.) After all corrections are made, please name your 2nd submittal documents accordingly, for example: 2_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, include the Activity Number. 1) Comment Response Letter (lists changes made to the Plan and which reviewer comments you are responding to) 2) Corrected Plan Set (all pages, full set) 3) Any other items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero). The Project Manager can be reached via email or phone: Loren.Makus@TucsonAz.gov, (520) 837-4927 Thank you. Sharon Beasley City of Tucson Planning and Development Services Attn: Permit Counter 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
05/16/2019 | SBEASLE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | approval letter - This was processed on 4/16 and letter mailed to applicant (Lisa Bowers at Metro) via application process. Kellie Anderson, Administrative Assistant Tucson Water-New DevelopmentPh: (520) 837-2165 |
05/16/2019 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on April 15, 2019. If TEP easements are required due to new development or relocation of existing electrical services, easements will be obtained by separate instrument. If there are any questions, please contact me at 520-917-8744. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Land Resources – RC 131 3950 E. Irvington Road Tucson, AZ 85714-2114 Office - 520-917-8744, Cell - 520-401-9895 mburke@tep.com |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
05/16/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |