Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Plan Number - S19-021
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/08/2020 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) has reviewed and approves the 2nd submittal of the final plat received on December 11, 2019. If additional TEP easements are required for new development, they will be obtained by separate instrument. If there are any questions, please feel free to contact me at 520-917-8744. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co., Land Resources - RC 131 3950 E. Irvington Road, Tucson, AZ 85714-2114 Office - 520-917-8744, Cell - 520-401-9895 mburke@tep.com |
01/09/2020 | DAVID RIVERA | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: House Mother Condominiums - Residential Use - Condos (4 Units) Final Plat (2nd Review) - 503 E. University Boulevard S19-021 - HR-3 Zoning (Per C9-83-49) TRANSMITTAL DATE: January 9, 2020 DUE DATE: January 9, 2020 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.5.6 Protective Covenants Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will: 2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and 1. COMMENT: Revise the following in the CC&R's Document; on sheet one, the year shall be revised to 2020, on sheet 9 under section 28.b revise the year to 2020, on sheet 10 the year shall be revised to 2020. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised CC&R's |
01/14/2020 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
01/16/2020 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plan Conditionally-Approved Notice: S19-021 Project Description: FINAL PLAT/CONDO - House Mother Condominiums, Units 1-4, C.E. "A" L.E. "B" and "C" Attached is the CDRC approval letter outlining the next steps and items to submit at the permit counter (available M-F 8-2) and upload online. Alexandra Hines, AICP | City of Tucson Planning and Development Services - Lead Planner | 201 N Stone Ave 1st Floor, Tucson, AZ 85701 | (520) 837-6975 - alexandra.hines@tucsonaz.gov |
12/11/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
12/17/2019 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | FROM: Suzanne Gilpin, GIS Cartographer, Pima County Assessor's Office, (520)724-4387 DATE: December 17, 2019 RE: Assessor's Review and Comments Regarding Final Plat- S19-021 - HOUSE MOTHER CONDOMINIUMS 2ND SUBMITTAL X Plat meets Assessor's Office requirements. |
12/23/2019 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | The Addressing review of S19-021 House Mother Condos, 2ND Submittal, is Approved by Pima County Addressing. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701, (520) 724-7570 |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/16/2020 | AHINES2 | OUT TO CUSTOMER | Completed |