Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Plan Number - S19-012
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/09/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
05/31/2019 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Reqs Change | ("Sheet 3" mentioned here can be viewed on PRO in the "Documents" section) The Addressing review of S19-012 La Estancia De Tucson Block 26 Final Plat, 2nd Submittal, is Approved by Pima County Addressing. However, there is one correction that needs to be made before the final mylar submittal. The prefix on Sheet 3 needs to be updated to Vuelta. Thank you, Robin Freiman, Addressing Official Pima County Development Services Department 201 N Stone AV – 4th Floor, Tucson, AZ 85701 (520) 724-7570 |
06/05/2019 | ALEXANDRA HINES | PIMA COUNTY | WASTEWATER | Approved | P19WC00074 issued |
06/06/2019 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: La Estancia De Tucson Block 26 Lots 1-47 and Common Areas A, B and C Final Plat (2nd Review) S19-012 TRANSMITTAL DATE: June 6, 2019 DUE DATE: June 5, 2019 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. 2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 1. COMMENT: List the Subdivision case number in the lower right corner of all Final Plat sheets. List as reference the rezoning case number C9-99-SP7 next to the title block of all plan sheets. 2-07.5.2.C Provide the following notes: "Total miles of new public streets are ____. "Total miles of new private streets are ____." 2. COMMENT: Per the final Plat there are .28 miles of Public Streets in this new development. Per the approved tentative plat the Public Miles is listed as .32. Which is correct? Revise as required or revise the TP for consistency. 2-07.5.4.A. Indicate the name and width of each street, alley, easement (type), and drainage way within the subdivision boundary being created by this plat. Label each as public or private, along with the appropriate dedication notation 3. COMMENT: Label the width of the "Vuelta Aguarachay" public street. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
06/07/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
06/11/2019 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) is requesting to rescind our denial of the La Estancia Block 26 Final Plat sent on May 30, 2019, and instead approves the final plat that was distributed on May 9, 2019, copy attached. If there are any questions, please contact me at 917-8744. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Land Resources – RC 131 3950 E. Irvington Road, Tucson, AZ 85714-2114 Office - 520-917-8744, Cell - 520-401-9895 mburke@tep.com |
06/14/2019 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | FROM: Ada Janson, GIS Cartographer, Pima County Assessor's Office DATE: May 15, 2019 RE: Assessor's Review and Comments Regarding: S19-012 - 2ND SUBMITTAL - LA ESTANCIA DE TUCSON BLOCK 26 X Plat meets Assessor's Office requirements. COMMENTS: THANK YOU FOR YOUR SUBMITTAL |
06/18/2019 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Approv-Cond | Plan Conditionally-Approved Notice: S19-012 Project Description: FINAL PLAT - La Estancia de Tucson, Block 26, Lots 1-47 and common area "A" (park/open space) and common area "B" (drainage/utilities). Attached is the conditional-approval letter outlining the next steps and items to submit at the permit counter (available M-F 8-2). Please integrate the files uploaded today into the final plat submittal. We will recycle the upload today knowing that the comment response letter and edits will be on the signed and notarized final plat submittal. Alexandra Hines, AICP | City of Tucson Planning and Development Services - Lead Planner | 201 N Stone Ave 1st Floor, Tucson, AZ 85701 | (520) 837-6975 - alexandra.hines@tucsonaz.gov |
06/18/2019 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Approv-Cond | CITY DEVELOPMENT REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES June 18, 2019 WLB Group Attn: Linda Thompson 4444 E Broadway Bl Tucson, AZ 85711 Subject: (S19-012) La Estancia de Tucson, Block 26, Lots 1-47 and common area "A" (park/open space) and common area "B" (drainage/utilities) Final Plat Dear Linda, The above referenced project has been CONDITIONALLY APPROVED by the City Development Review Committee. Please make any necessary corrections and submit the following documents: 1 Address review comments from zoning and addressing on executed final plat. Provide comment response letter. 1 Original set of executed and notarized Final Plat on Double Matte Océ or Photo Mylar. 1 Title reports current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid. 1 Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a flat $4.00 handling fee, along with Consent to Dedicate and CC&R fees if applicable. Consent to Dedicate and CC&R fees are $30.00 flat fee per document. If you are unsure of the fees, please call the County Recorders Office at 520-740-4350. Check must be dated within 45 days of the scheduled Mayor & Council meeting. 1 Original set of executed and notarized CC&R (if applicable). 1 Original set of executed and notarized Assurance Agreement (if applicable). 1 Provide the property owner(s) and engineering mailing addresses on a sheet of paper in the submittal to receive proper notification 1 week prior to the Mayor & Council Meeting (if no assurances). 1 Upload a PDF scan of executed Plat, CC&R (if applicable), Assurance Agreement (if applicable), title report, and mailing address to https://www.tucsonaz.gov/file-upload-pdsd. The Planning and Development Services Department makes sure the Assurances (if applicable) are reviewed by the City Attorney's Office prior to being presented to the Mayor & Council. Plats, CC&R's and assurances must be approved at the same Mayor & Council Meeting. Please expect 5 weeks from the date submitted to the date scheduled for Mayor & Council approval. Should you have any questions, please call me at (520) 837-6975. Sincerely, Alexandra Hines Lead Planner All comments for this case are available on our website at www.tucsonaz.gov/PRO. Via Permits Plus/E-mail |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
06/18/2019 | AHINES2 | OUT TO CUSTOMER | Completed |