Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S19-006
Parcel: Unknown

Address:
1014 N 7TH AV

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S19-006
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
02/04/2019 SBEASLE1 START PLANS SUBMITTED Completed
02/04/2019 SBEASLE1 UTILITIES SOUTHWEST GAS Passed This agency was notified for their information only. A response/review was not required.
02/04/2019 KAY MARKS PIMA COUNTY ADDRESSING Passed See OK to Submit comments.
02/04/2019 SBEASLE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed This agency was notified for their information only. A response/review was not required.
02/04/2019 SBEASLE1 OTHER AGENCIES U. S. POST OFFICE Passed This agency was notified for their information only. A response/review was not required.
02/04/2019 SBEASLE1 PIMA COUNTY PAG - PIMA ASSN OF GOVTS Passed This agency was notified for their information only. A response/review was not required.
02/05/2019 JIM EGAN COT NON-DSD FIRE Approved
02/06/2019 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change DATE: February 6, 2019
FROM: Suzanne Gilpin, GIS Cartographer, Pima County Assessor's Office, (520)724-4387
RE: Assessor's Review and Comments Regarding Final Plat - S19-006-1014 N. 7TH AVENUE

__X___ Plat does not meet Assessor's Office requirements.

COMMENTS:
1. There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision.
2. Ownership doesn't match what we have. Our records show West University Townhomes II, LLC and not West University Associates L.L.C. Ownership must match our records prior to recording plat map.
02/19/2019 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on February 4, 2019. Should TEP easements be required for future development, they will be obtained by separate instrument. If there are any questions, please contact me at 520-917-8744. Thank you,

Mary Burke, Right of Way Agent III
Tucson Electric Power Co.
Land Resources - RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com
02/25/2019 ANDREW CONNOR LANDSCAPE REVIEW Approved
02/27/2019 JANE DUARTE COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this Block Plat.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation
(520) 837-8040
Howard.Dutt@tucsonaz.gov
02/27/2019 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved 02/26/19
Regional Traffic Engineering has no comments on this submittal and supports its acceptance. The project's location will have no impacts to any ADOT facilities. Thank you.
Tom Martinez
ADOT
TMartinez@azdot.gov
03/04/2019 SSHIELD1 ZONING HC REVIEW Passed
03/04/2019 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Completed
03/04/2019 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
03/04/2019 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Section Manager

PROJECT: 1014 N 7th Avenue
Block Plat (1st Review)
S19-006

TRANSMITTAL DATE: March 4, 2019

DUE DATE: March 5, 2019

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed.

SECTION 2-07.0.0: FINAL PLAT, BLOCK PLAT, MINOR SUBDIVISION, AND CONDOMINIUM PLAT APPLICATIONS

Section
2-07.1.0 APPLICABILITY
2-07.2.0 APPLICATION SUBMITTAL REQUIREMENTS
2-07.3.0 SUBMITTAL TIMING
2-07.4.0 FORMAT REQUIREMENTS
2-07.5.0 CONTENT REQUIREMENTS
2-07.6.0 APPROVAL DOCUMENTS AND PROCEDURE

2-07.1.0 APPLICABILITY

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)

2-07.5.0 CONTENT REQUIREMENTS

5.1 General

2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:

1. COMMENT: Relocate the project-location map to the upper right corner of the plan.

2-07.5.1.A.3 Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and,

2. COMMENT: Label all subdivisions located within the project-location map.

2-07.5.1.D Place the words "SEQ#________" in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder's Office at the time of recordation.

3. COMMENT: Place the words "SEQ#________" in both the upper and lower right corners outside the margin line.

2-07.5.1.H The S(Year)-___ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

4. COMMENT: Provide the subdivision case number S19-006 and rezoning case number C9-83-49, in the lower right corner of the plat next to the title block.

2-07.5.2 General Notes
The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information.

2-07.5.2.D If the property is subject to conditions of rezoning, add the following note: "This plat is subject to the conditions of rezoning case number C9-__-__, unless superseded by a subsequent rezoning ordinance."

5. COMMENT: Add the following general note: "This plat is subject to the conditions of rezoning case number C9-83-49, unless superseded by a subsequent rezoning ordinance."

2-07.5.2.H Add the following note on all plats. The purpose of this note is solely for review for compliance with local and state laws governing subdivision and land splits. "There will be no further division of lots without the expressed approval of the City of Tucson."

6. COMMENT: Revise General Note 4 to read "THERE WILL BE NO FURTHER DIVISION OF LOTS WITHOUT THE EXPRESSED APPROVAL OF THE CITY OF TUCSON."

2-07.5.3 Standard Paragraphs
The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.

2-07.5.3.D Approval and Recording Data Blocks
The APPROVAL paragraph, where the City Clerk certifies that the plat has been approved by Mayor and Council, and the RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat adjacent to each other. The paragraphs are as follows.

7. COMMENT: The approval block should match the following:

APPROVAL

"I, (fill in name of current City Clerk), Clerk of the City of Tucson, Arizona, hereby certify that this plat was approved by the Mayor and Council of the City of Tucson, Arizona, on this ____ day of __________, 20__."

____________________________________________ ______________
Clerk, City of Tucson Date

Sequence________________
Fee_____________________
State of Arizona
County of Pima
I hereby certify that the instrument
was filed for record at the request
Of__________________________
Date________________________
Time_________________________
Witness my hand and Official Seal
day and year above written.
F. ANN RODRIGUEZ, County Recorder
BY___________________________
Deputy



If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
03/08/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. Add case number (S19-006) near the title block.
2. Change the signature line for the engineering administrator to "City of Tucson Engineer."
3. Provide a tie to a section corner or quarter corner.
03/11/2019 ALEXANDRA HINES PIMA COUNTY WASTEWATER Reqs Change Applicant is responsible for obtaining review and approval for wastewater from Pima County at sewer@pima.gov prior to Mayor & Council approval. Please provide approval letter in resubmittal.
03/11/2019 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Passed
03/12/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
The reviews have been completed and a resubmittal is required.
Activity Number: S19-006
Project Description: BLOCK PLAT - West University Townhomes. Remove condo plat, new legal descr, and consolidate into one tax code.
To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. Name your documents in the following manner - a 2nd submittal document would be titled: 2_Plan_Set.
After the necessary corrections have been made, submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd
In the Project Description field, enter the Activity Number.
After submittal, the plans will then re-enter a 20-working-day review cycle.
1) Comment Response Letter
2) Corrected plan set with all documents
3) Items requested by review staff
The fee balance is $0 (zero). Thank you.

City of Tucson
Planning and Development Services
Attn: Sharon Beasley
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
03/12/2019 SBEASLE1 OUT TO CUSTOMER Completed