Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S19-004
Parcel: Unknown

Address:
3402 N STONE AV

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S19-004
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/20/2019 SBEASLE1 START PLANS SUBMITTED Completed
09/23/2019 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change FROM: Ada Janson, GIS Cartographer
Pima County Assessor's Office, (520)724-4395
DATE: September 23, 2019
RE: Assessor's Review and Comments Regarding:
S19-004 - 2nd SUBMITTAL OF FINAL PLAT FOR MOHAVE STONE SUBDIVISION

___X___ Plat does not meet Assessor's Office requirements.

COMMENTS:

- THE TITLE BLOCK MUST BE IN THE LOWER RIGHT HAND CORNER. IT MUST HAVE THE NUMBER OF LOTS OR UNITS OR BLOCKS OR ANY COMBINATION OF THESE. IT MUST HAVE THE COMMON AREAS LISTED, IF THERE ARE ANY. IT MUST HAVE THE SECTION, TOWNSHIP AND RANGE AND IF IT IS A RESUBDIVISION, IT MUST MENTION THE PLAT NAME AND THE MAP AND PLAT.

- THE LOCATION MAP IN THE UPPER RIGHT HAND CORNER, THE PROJECT AREA SHOULD BE OUTLINED OR HAVE AN ARROW POINT TO IT. PLEASE REMOVE ALL THE SUROUNDING SUBDIVISION INFORMATION OUTLINED & ONLY REFERENCE THE CURRENT MAP LOCATION WITH THE 'FLAG'.

- THERE MUST BE A SECTION TIE, WITH A BEARING AND DIMENSION FROM THE SECTION CORNER OR QUARTER CORNER TO THE POINT OF TIE ON THE SUBDIVISION.

- THE PERIMETER LINE MUST BE SOLID AND HEAVIEST LINE WEIGHT ON THE PLAT. THE LOT LINES AND COMMON AREA LINES MUST BE SOLID AND THE NEXT HEAVIEST.

- THERE MUST BE BEARINGS AND DIMENSIONS FOR THE PERIMETER AND ALL LOT LINES AND ALL COMMON AREAS.

- ALL STREETS MUST BE NAMED IN THE FINAL PLAT, AND HAVE DIMENSIONS, BEARINGS AND CURVE DATA.

- ALL ADJACENT SUBDIVISIONS SHOULD BE NAMED, WITH MAP AND PLAT IN THE APPROPRIATE AREAS AROUND THE SUBDIVISION.

- PLEASE REPLACE "APN" NUMBERS WITH SUBDIVISION INFORMATION

- OUR RECORDS INDICATE OWNERSHIP AS WILLIAM TERRELL. PLEASE EITHER ADD A COMMA TO THE OWNER INFORMATION, OR SHOW FIRST NAME OF "WILLIAM", FIRST.
09/30/2019 MESCALA1 ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Martin Escalante
PDSD Zoning Review Section

PROJECT: Mohave Stone Subdivision Lots 1-3
Final Plat (2nd Review) 3402 N Stone Ave
S19-004 -Zoning R-3

TRANSMITTAL DATE: September 23, 2019

DUE DATE: October 18, 2019

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.


2-07.5.3 Standard Paragraphs
The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.


2-07.5.3.D Approval and Recording Data Blocks
The APPROVAL paragraph, where the City Clerk certifies that the plat has been approved by Mayor and Council, and the RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat adjacent to each other. The paragraphs are as follows.

APPROVAL

"I, (fill in name of current City Clerk), Clerk of the City of Tucson, Arizona, hereby certify that this plat was approved by the Mayor and Council of the City of Tucson, Arizona, on this ____ day of __________, 20__."

____________________________________________ ______________
Clerk, City of Tucson Date

Sequence________________
Fee_____________________
State of Arizona
County of Pima
I hereby certify that the instrument
was filed for record at the request
Of__________________________
Date________________________
Time_________________________
Witness my hand and Official Seal
Day and year above written.
F. ANN RODRIGUEZ, County Recorder
BY___________________________
Deputy


1. COMMENT: Provide full RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat.



If you have any questions about this transmittal, Contact Martin Escalante during the week at (520) 837-6971 or by email Martin.Escalante@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
10/15/2019 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on September 20, 2019. Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load to determine how TEP will serve this development. Easements for TEP facilities will be obtained by separate instrument.
Please contact me at 520-917-8744 should you have any questions.
Thank you,
Mary Burke, Senior Right of Way Agent
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road, Tucson, AZ 85714-2114
Office - 520-917-8744, Cell - 520-401-9895, mburke@tep.com
10/21/2019 ALEXANDRA HINES PIMA COUNTY WASTEWATER Reqs Change COMMENT below not addressed. Contact wastewater and provide their approval in the resubmittal.

Applicant is responsible for obtaining review and approval for wastewater from Pima County at sewer@pima.gov prior to Mayor & Council approval. Provide approval is resubmittal.
10/25/2019 LOREN MAKUS ENGINEERING REVIEW Reqs Change S19-004
1. The Plat cannot be approved until the Development Plan/Tentative Plat (DP19-0138) is approved.
2. Provide signature lines for the owner to dedicate the plat.
10/28/2019 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change PLAN RETURNED FOR CORRECTIONS NOTICE
- A resubmittal is required.
Permit/Activity Number: S19-004
Project Description: FINAL PLAT - Mohave Stone, Lots 4-A, 4-B, and 4-C. A resubdivision of Lot 4, Block 2 of Sawtelle Place.
Fee Balance: $0 (zero).
To view review comments: www.tucsonaz.gov/PRO, enter the Permit/ Activity Number.
(If information isn't shown yet, check back later as data uploads to PRO periodically.)
Submit the following items to the PDSD Filedrop: https://www.tucsonaz.gov/file-upload-pdsd.
Project Description field: Enter the Permit Number.
1) Comment Response Letter (your response to the reviewer's “Requires changes” comments)
2) Plan Set (all pages, full set)
3) Any other documents requested by review staff
4) Name your 3rd submittal documents accordingly, for example: 3_Plan_Set

Thank you.
Sharon Beasley, Permit Specialist

City of Tucson
Planning and Development Services
Attn: Permit Counter/Payments
201 N. Stone Avenue, First Floor
Tucson, AZ 85701
11/06/2019 SBEASLE1 PIMA COUNTY ADDRESSING Reqs Change S19-004 / 2nd submittal / Mohave Stone - Final Plat is Conditionally Approved by Pima County Addressing subject to the following corrections:
· Label N Stone Av and E Mohave Rd as PUBLIC
· On Location Map correct reference for Yavapai Condominiums to sequence 20071260839.

Addresses will be issued for the proposed lot when Final Plat records as follows:
Lot 1: 3402 N Stone Av
Lot 2: 45 E Mohave Rd
Lot 3: 55 E Mohave Rd

Please let me know if you have any questions.
Thank you,
Robin Freiman, Addressing Official
Pima County Development Services Department
201 N Stone AV – 4th Floor Tucson, AZ 85701, (520) 724-7570

Final Status

Task End Date Reviewer's Name Type of Review Description
10/28/2019 SBEASLE1 OUT TO CUSTOMER Completed