Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S18-101
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/02/2019 | NICHOLAS ROSS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Nick Ross PDSD Zoning Review Section PROJECT: Esperanza en Escalante Veterans Housing Lots 1 and 3 Final Plat (1st Review) S18-101 TRANSMITTAL DATE: January 2, 2019 DUE DATE: January 2, 2019 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. 2-07.5.0 CONTENT REQUIREMENTS 2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 1. COMMENT: The Subdivision Case number is S18-101. 2-07.5.2.J If applicable, add the following note: "This subdivision is subject to Ordinance No. ____ which established zoning in the Annexation Area." 2. COMMENT: See Ordinance here: https://www.tucsonaz.gov/sirepub/cache/2/j2fjlovzxlnpaxva4cvvziia/238243501022019031200965.PDF 2-07.5.4.K. If the plat represents one phase of a multiphased project and access is provided through this phase to the future phases, indicate the access easements or public streets on this plat that will guarantee the access. 3. COMMENT: Indicate access easement for all lots. If you have any questions about this transmittal, Contact Nick Ross at (520) 837-4029 or by email Nicholas.Ross@tucsonaz.gov. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 01/04/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | S18-101 1) Change "City of Tucson PDSD Engineering Administrator" to "City of Tucson City Engineer" 2) Plat property lines do not match the proposed property lines in DP18-0277. For example L13 in the plat is shown as 75', DP shows 65'. L11 shows 88.03', DP shows 98.03'. Update either the Plat or DP as needed to ensure that all proposed property lines are consistent. Check western most property line John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
| 01/04/2019 | AHINES2 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Passed | Number of lots is less than 6. Okay to pass since water is available for property in City of Tucson. |
| 01/09/2019 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) approves the final plat submitted on December 3, 2018. If you have any questions, please contact me at 520-917-8744. Thank you, Mary Burke Right of Way Agent III Tucson Electric Power Co. Land Resources - RC 131 3950 E. Irvington Road Tucson, AZ 85714-2114 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
| 01/11/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plans Returned for Corrections (RFC) Notice: S18-101 Project Description: E FINAL PLAT/ESPERANZA EN ESCALANTE VETERANS HOUSING LOTS 1 AND 3 PHASE II The review has been completed and a resubmittal is required. To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made to the plans, go to the PDSD Filedrop web page. Please enter the Activity Number in the “Project Description” field and name the files as directed, for example, second (2nd) submittal: 2_Plan_Set.pdf. Submit the following items to the PDSD Filedrop at www.tucsonaz.gov/file-upload-pdsd. The plans will then re-enter a 20-working-day review cycle. 1) Comment Response Letter 2) Corrected plan set with all documents 3) Items requested by review staff The current fee balance is $ 0 (zero). Nicholas Ross, copied, is the Project Manager to contact with any questions, email: Nicholas.Ross@TucsonAz.gov or phone (520) 837-4029. Thank you. Sharon Beasley City of Tucson Planning and Development Services 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
| 01/11/2019 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 240 N STONE AVENUE Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson FROM: Julieann Arechederra GIS Cartographer Pima County Assessor's Office DATE: January 11, 2019 RE: Assessor's Review and Comments Regarding: ESPERANZA EN ESCALANTE VETERANS HOUSING S18-101 X Plat meets Assessor's Office requirements. |
| 12/03/2018 | SBEASLE1 | UTILITIES | SOUTHWEST GAS | Passed | SW Gas notified for information only. |
| 12/03/2018 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
| 12/24/2018 | SBEASLE1 | PIMA COUNTY | ADDRESSING | Approved | S18-101 / ESPERANZA EN ESCALANTE / Final Plat Review is Approved by Pima County Addressing. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV 4th Floor Tucson, AZ 85701 (520) 724-7570 |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/11/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |