Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Plan Number - S18-098
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/27/2019 | SBEASLE1 | START | PLANS SUBMITTED | Completed | |
02/27/2019 | SBEASLE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Approved | February 27, 2019 Sharon Beasley Permit Technician City of Tucson Public Works Buildings - 201 North Stone Avenue Tucson, AZ. 85701 RE: S18-098 Tres Pueblos Este, Block 1 / 2nd Submittal, Received February 12, 2019 Dear Ms. Beasley, Thank you for the opportunity to comment on S18-098, Tres Pueblos Este, Block 1, 2nd Submittal, a development package application for a final plat for an approximately 36.6 acre site located on the northeast corner of the intersection of South Tucson Boulevard and East Bilby Road. The proposed land use is residential, established single family homes. The Tucson Airport Authority acknowledges that the development of a residential use is allowed on this project site since it is currently zoned as Low Density Residential (R-1) and is in compliance with the City of Tucson's Compatible Use Zone 2 (CUZ-2) overlay. The Tucson Airport Authority is satisfied with the 2nd submittal of the project and has no additional comments to submit. Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811. Respectfully, Scott Robidoux, Senior Airport Planner |
03/07/2019 | DAVID RIVERA | ZONING | REVIEW | Approved | |
03/14/2019 | ALEXANDRA HINES | PIMA COUNTY | WASTEWATER | Approved | Final Plat Approval Record Number: P18WS00095 Project Name: Tres Pueblos Este, Block 1, Lots 1-103 Approval issue date: 12/19/2018 Applicant: Rick Engineering Owner Name: D.R. Horton, Inc. Owner Address: 3580 East Ina Road, Suite 100, Tucson, AZ 85741 The Pima County Development Services Department has reviewed the above-referenced project and hereby approves the Final Plat, based upon PCRWRD Engineering Design Standards (EDS) 2016. Please note any changes and/or revisions to the approved plans shall require a re-submittal to the department for review and evaluation. |
03/14/2019 | SBEASLE1 | UTILITIES | TUCSON ELECTRIC POWER | Reqs Change | **The PDF attachment mentioned here can be viewed on PRO in the "Documents" section** Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on February 12, 2019 and is unable to approve the plat at this time. Easements for TEP facilities, as identified on the attached drawing must be added to the plat before TEP can approve. If there are any questions, please contact me at 520-917-8744. Thank you, Mary Burke, Senior Right of Way Agent Tucson Electric Power Co. Land Resources - RC 131 3950 E. Irvington Road Tucson, AZ 85714-2114 Office - 520-917-8744, Cell - 520-401-9895 mburke@tep.com |
03/14/2019 | ALEXANDRA HINES | PIMA COUNTY | ADDRESSING | Approved | S18-098 Tres Pueblos Este, Block 1 / 2nd Submittal is Approved by Pima County Addressing. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 4th Floor Tucson, AZ 85701 (520) 724-7570 |
03/20/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Approved | |
03/21/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | PLAN RETURNED FOR CORRECTIONS NOTICE The reviews have been completed and a resubmittal is required. Activity Number: S18-098 Project Description: E FINAL PLAT - TRES PUEBLOS ESTE, Block 1, Lots 1-103, an FLD subdivision and Lots 104-156 an R-1 subdivision, common areas "A-1" thru "A-4", and "B-1" thru "B-2". To view review comments, visit PRO at www.tucsonaz.gov/PRO, then search by Activity Number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.) After the necessary corrections have been made, name your documents accordingly - a 3rd submittal document would be titled: 3_Plan_Set. Submit the following items to the PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd. In the Project Description field, enter the Activity Number. 1) Comment Response Letter (lists changes to the Plan and which review comments are being addressed) 2) Corrected plan set with all documents (the full set) 3) Items requested by review staff After resubmittal, the plans will re-enter the standard 20-working-day review cycle. The fee balance is $0 (zero). Thank you. City of Tucson Planning and Development Services Attn: Sharon Beasley 201 N. Stone Avenue, First Floor Tucson, AZ 85701 |
03/21/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | March 27, 2019 James Gaulin D.R. Horton, INC 3850 W Ina Rd STE 100 Tucson AZ 85741 Subject: (S18-098) TRES PUEBLOS ESTE, Block 1, Lots 1-103 Final Plat Dear James, The above referenced project has been CONDITIONALLY APPROVED by the City Development Review Committee. Please make any necessary corrections and submit the following documents: 1 Executed Final Plat Double Matte Océ or Photo Mylar. 1 Title reports current within the last thirty (30) days or statement from title company certifying the title report previously submitted is still valid. 1 Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a flat $4.00 handling fee, along with Consent to Dedicate and CC&R fees if applicable. Consent to Dedicate and CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page. If the Consent to Dedicate is also a fixture filing, there is an additional $9.00 fee. If you are unsure of the fees, please call the County Recorders Office at 520-740-4350. Check must be dated within 45 days of the scheduled Mayor & Council meeting. 1 Original Set of Executed and notarized CC&R's document (if applicable) and Assurance Package (if applicable). 1 CD with PDF scan of signed Plat, CC&R's (if applicable) and Assurances (if applicable). 1 Provide the property owner(s) and engineering mailing address on a sheet of paper in the submittal to receive proper notification 1 week prior to the Mayor and Council Meeting (if no assurances). The Planning and Development Services Department makes sure the Assurances (if applicable) are reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CC&R's and assurances must be approved at the same Mayor and Council Meeting. Please expect 5 weeks from the date submitted to the date scheduled for Mayor and Council approval. Should you have any questions, please call me at (520) 837-6975. Sincerely, Alexandra Hines Lead Planner All comments for this case are available on our website at www.tucsonaz.gov/PRO. Via Permits Plus/E-mail |
03/21/2019 | SBEASLE1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | Plan Conditionally-Approved Notice: S18-098 Project Description: E FINAL PLAT - TRES PUEBLOS ESTE, Block 1, Lots 1-103 Attached is the conditional-approval letter outlining the next steps and items to submit at the permit counter (available M-F 8-2). Alexandra Hines, AICP Lead Planner at Planning and Development Services, City of Tucson 201 N Stone Ave 1st Floor, Tucson, AZ 85701 (520) 837-6975 - alexandra.hines@tucsonaz.gov |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
03/21/2019 | SBEASLE1 | OUT TO CUSTOMER | Completed |