Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S18-077
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/04/2018 | QJONES1 | START | PLANS SUBMITTED | Completed | |
| 09/04/2018 | AHINES2 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Passed | Water availability for lots less than 6. |
| 09/04/2018 | ALEXANDRA HINES | PIMA COUNTY | WASTEWATER | Needs Review | Applicant is responsible for obtaining review and approval for wastewater from Pima County at sewer@pima.gov. Please provide approval in submittal prior to agendize for Mayor & Council meeting. |
| 09/04/2018 | ALEXANDRA HINES | OTHER AGENCIES | U. S. POST OFFICE | Passed | Agency notified for information only. |
| 09/04/2018 | ALEXANDRA HINES | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | Agency notified for information only. |
| 09/06/2018 | ALEXANDRA HINES | UTILITIES | SOUTHWEST GAS | Approved | Agency notified for information only. |
| 09/06/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera PDSD Zoning Review Section PROJECT: Bellevue Commons Lots 1 - 4 - 5221 E. Bellevue Street Final Plat (1st Review) - Minor Subdivision S18-077 - R-2 Zoning TRANSMITTAL DATE: September 6, 2018 DUE DATE: September 21, 2018 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. 2-07.5.1.A - A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information: 2-07.5.1.A.1 - The project site approximately centered within a one square mile area; 1. COMMENT: The location map shown shall be drawn within the one square mile block. Redraw the location map as required. 2-07.5.1.A.2 - Label the section, township, and range; section corners; north arrow; and the scale; 2. COMMENT: Label the section number 2 on 4 corners within the location map, see redlines. 2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 3. COMMENT: List the subdivision case number S18-077 next to the title block. 2-07.5.2.J - If applicable, add the following note: "This subdivision is subject to Ordinance No. ____, which established zoning in the _____________________ Annexation Area." 4. COMMENT: Add the note as listed above and fill in the blanks as follows, "1634" in the ordinance blank and "Pima to 22nd Street, City Limits Out to Craycroft Road" in the annexation name blank. 2-07.5.3 Standard Paragraphs The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal. 2-07.5.6 Protective Covenants Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will: 2-07.5.6.A - Provide for maintenance of and liability for any proposed commonly-owned areas; and 5. COMMENT: Clarify if this minor subdivision will be recorded with CC&R's? 6. COMMENT: Include with the next submittal of the final plat as reference, an overall supplemental site plan that illustrates how the lots will be developed and meet the development criteria for the proposed uses. Be aware that additional comments may be forthcoming on the supplemental site plan. Also include a note on the final plat that a separate plot plan will be submitted for the development of each lot under separate permit. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 09/06/2018 | ALEXANDRA HINES | UTILITIES | SOUTHWEST GAS | Approved | September 6, 2018 City of Tucson CDRC Attn: Patricia Gehlen, Manager 201 N. Stone Avenue Tucson, AZ 85701 RE: S18-077 Bellevue Commons, Lots 1-4 / 1st Submittal Dear Ms. Gehlen: Southwest Gas Corporation (SWG) has no objection to the development of the above- mentioned project. Existing natural gas facilities are located in adjacent rights-of-way to the area of development and may be affected by construction of this project; specifically, an existing 2" gas main is located within the Right of Way of Willard Street and Bellevue Street and may be impacted by pavement saw cutting along the South edge of Willard Street and Bellevue Street, along with driveway grading into development. Blue Stake and potholing are suggested for best accuracy when locating SWG facilities. Please be aware that SWG requires a minimum one-foot separation from distribution facilities and any proposed structures and two-foot separation from high pressure gas facilities. SWG requests the contractor use caution when working in the vicinity of gas facilities and protect and support gas facilities per Blue Stake requirements. SWG also requests that no trees be planted within close proximity to gas facilities due to root intrusion; therefore, SWG requires all tree placements have a minimum eight-foot clearance from the tree center line to existing or proposed gas facilities. Shrubs and bushes may be planted within the eight-foot clearance zone. All information is provided for reference use only. Please note that it is the responsibility of excavators or those developers planning excavation to verify actual field conditions in advance of construction so that requests for gas service or any potential issues can be addressed in a timely manner, including payment for conflict mitigation if applicable. 3401 East Gas Road / Tucson, Arizona 85714-1994 P.O. Box 26500 / Tucson, Arizona 85726-6500 / (877) 860-6020 www.swgas.com September 6, 2018 Page 2 of 2 Please include SWG in all future development plan submittals of this project. If you have any questions or require any additional information, please contact me at (520) 794-6049 or TUCSWGDevReview@swgas.com. Sincerely, Shawn Stoner Engineering Technician Southern Arizona Division Enc: SWG Contact Information and Excavators Responsibilities (pdf) |
| 09/06/2018 | DAVID RIVERA | ZONING HC | REVIEW | Approved | |
| 09/10/2018 | JANE DUARTE | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are affected by this Minor Subdivision Plat. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation (520) 837-8040 Howard.Dutt@tucsonaz.gov |
| 09/14/2018 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | S18-077 Bellevue Commons, Lots 1-4 / 1st Submittal is Approved by Pima County Addressing. When this plat is recorded the addresses will be issued as shown on the attached plan. Let me know if you have any questions or if I may assist you further. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
| 09/17/2018 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
| 09/18/2018 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 09/19/2018 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
| 09/20/2018 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Reqs Change | Tucson Electric Power Co. (TEP) has reviewed the final plat submitted on 9-4-18, and is unable to approve at this time. There is a TEP easement along the west property boundary that must be shown on the plat. The easement is recorded in Book 2343, Page 87. If there are any questions, please contact me at 520-917-8744. Thank you, Mary Burke Right of Way Agent III Tucson Electric Power Co. Land Resources – RC 131 3950 E. Irvington Road Tucson, AZ 85714-2114 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
| 09/24/2018 | ROBERT SHERRY | PLUMBING-RESIDENTIAL | REVIEW | Completed | |
| 09/26/2018 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | S18-077 1) Remove "Willard Street" from the plat. The drive aisle to the north of the parcels is designated as an alley 2) The 1' wide no access easement cannot be contained within the 10' wide ingress/egress easement. Adjust as needed so that the no access easements are not within the access easements. Suggest providing one 10' wide access easement to access lots 3 and 4 with two 1' wide no access easements on either side John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
| 09/27/2018 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | Office of the Pima County Assessor 240 N STONE AVENUE Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson FROM: Ada Griffin GIS Cartographer Pima County Assessor's Office DATE: September 27, 2018 RE: Assessor's Review and Comments Regarding: S18-077 FINAL PLAT FOR BELLEVUE COMMON * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor's Office requirements. ___X___ Plat does not meet Assessor's Office requirements. COMMENTS: " ALL ADJACENT SUBDIVISIONS SHOULD BE NAMED, WITH MAP AND PLAT IN THE APPROPRIATE AREAS AROUND THE SUBDIVISION. NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
| 09/28/2018 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following: 1) Two rolled sets of the plans 2) A CD containing all items submitted 3) All items requested by review staff 4) All approved documents submitted previously 5) All items needed to approve these plans |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/01/2018 | QJONES1 | APPROVAL SHELF | Completed |
| 10/01/2018 | QJONES1 | REJECT SHELF | Completed |
| 10/01/2018 | QJONES1 | OUT TO CUSTOMER | Completed |