Plan Number: S18-070
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S18-070
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/03/2018 ALEXANDRA HINES START PLANS SUBMITTED Completed
08/07/2018 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change Office of the Pima County Assessor
240 N. Stone Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: City of Tucson Development Services


FROM: Suzanne Gilpin
GIS Cartographer
Pima County Assessor's Office
(520)724-4387


DATE: August 7, 2018


RE: Assessor's Review and Comments Regarding Final Plat-
S18-070 WARRIOR VILLAGE/1ST SUBMITTAL


* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Plat meets Assessor's Office requirements.
__X___ Plat does not meet Assessor's Office requirements.

COMMENTS:


" Ownership doesn't match that of record. Plat reads Fidelity National Title Trust 80,378 however, public records show Fidelity National Title Trust 60,378. I am not sure if this is a typographical error or not. If Trust 80,378 is to hold title, Deed must record prior to recordation of the plat.





NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
08/23/2018 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Warrior Village - Lots 1 - 8 and Common Areas A, B, C, D
Final Plat (1st Review) - Minor Subdivision
S18-070 - Related to DP18-0186

TRANSMITTAL DATE: August 23, 2018

DUE DATE: August 31, 2018

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.


2-07.5.0 CONTENT REQUIREMENTS

5.1 General

2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:

2-07.5.1.A.3 - Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and,

1. COMMENT: Label Pima Street and Rosemont Boulevard on the location map.

List the subdivisions within the one mile location map by book and page.

2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

2. COMMENT: List the assigned subdivision case number S18-070 in the lower right corner next to the title block of the sheets.


2-07.5.2.J If applicable, add the following note: "This subdivision is subject to Ordinance No. ____ which established zoning in the _____________________ Annexation Area."

3. COMMENT: Add the above statement as a general note on the cover sheet; fill in the blanks with "1634" for the ordinance number and "Pima To 22nd. Street, City Limits Out to Craycroft Road" in the blank for the annexation area.


2-07.5.3 Standard Paragraphs
The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.


2-07.5.3.D Approval and Recording Data Blocks
The APPROVAL paragraph, where the City Clerk certifies that the plat has been approved by Mayor and Council, and the RECORDING DATA paragraph, which provides space for the recording information, must be placed on the first sheet of the plat adjacent to each other. The paragraphs are as follows.

APPROVAL

"I, (fill in name of current City Clerk), Clerk of the City of Tucson, Arizona, hereby certify that this plat was approved by the Mayor and Council of the City of Tucson, Arizona, on this ____ day of __________, 20__."

____________________________________________ ______________
Clerk, City of Tucson Date

Sequence________________
Fee_____________________
State of Arizona
County of Pima
I hereby certify that the instrument
was filed for record at the request
Of__________________________
Date________________________
Time_________________________
Witness my hand and Official Seal
day and year above written.
F. ANN RODRIGUEZ, County Recorder
BY___________________________
Deputy


4. COMMENT: Include under the Approval text block on the cover sheet the information that is noted in the above box just under the city clerk text.


2-07.5.4 Proposed Subdivision Information
Provide the following information on the plat:

2-07.5.4.G. Corner lots may be designated with a star symbol indicating which street will be used for access. Use of this designation may limit design options for access. In instances where the city, for safety reasons, limits accessibility, a one-foot no-access easement will be required;

5. COMMENT: If applicable add the star symbol.


2-07.5.6 Protective Covenants

Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will:
2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and

6. COMMENT: Provides copies of the CC&R's for this development with the final plat submittal.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
08/28/2018 JOHN VAN WINKLE ENGINEERING REVIEW Reqs Change S18-070

1) Sheet 1 under Dedication. Replace I/WE with either I or WE
2) Sheet 1 under ASSURANCES. Provide additional writing/signature space for the PDSD Director
3) Sheet 1 under GENERAL NOTES. Note 13, correct "NOTHING SET THIS PLAT" to NOTHING SET BY THIS PLAT"
4) Provide one 15' wide Public Water easement for each lot
5) Change project description from "Minor Subdivision" to FINAL PLAT

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
08/29/2018 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on August 3, 2018, and is unable to approve at this time. An electrical design must be completed and easements for TEP facilities shown on the plat in order for TEP to approve.



If you have any questions, please contact me at 520-917-8744.



Thank you,



Mary Burke

Right of Way Agent III

Tucson Electric Power Co.

Land Resources – RC 131

3950 E. Irvington Road

Tucson, AZ 85714-2114

Office - 520-917-8744

Cell - 520-401-9895

mburke@tep.com
08/29/2018 ALEXANDRA HINES UTILITIES SOUTHWEST GAS Passed Agency notified for information only.
08/31/2018 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change Plan Returned for Corrections Notice: S18-070Project Description: E FINAL PLAT - WARRIOR VILLAGE
This review has been completed and resubmittal is required.
To see reviewer's comments about your plans, please visit https://www.tucsonaz.gov/pro/pdsd/activity_search.You will need to enter the activity number shown above to see comments about the plan.
Prepare a Comment Response Letter which tells the reviewers what changes have been made to the plan and what comments are addressed. When you have made the necessary corrections to the plans, please resubmit the following items to PDSD Filedrop at https://www.tucsonaz.gov/file-upload-pdsd and the plans will re-enter the 20 working day review cycle:1) Corrected plan set2) Items requested by review staff
Please remember to name your files appropriately, for example: second (2nd) submittal,2_plan_set.pdf2_response_letter.pdf
Alexandra Hines, AICP
Lead Planner at Planning and Development Services, City of Tucson
201 N Stone Ave 1st Floor, Tucson, AZ 85701
(520) 837-6975 - alexandra.hines@tucsonaz.gov
08/31/2018 ALEXANDRA HINES PIMA COUNTY ADDRESSING Reqs Change ***See attachment in documents folder on PRO.***

S18-070 Warrior Village / 1st Submittal is being Returned for Corrections by Pima County Addressing.

Please see the attached pdf with Addressing’s comments.

Let me know if you have any questions.

Thank you,

Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
08/31/2018 AHINES2 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved May 7, 2014

Apex Development Consultants, P.C.
2141 N Alvernon Way, Suite C
Tucson, AZ 85712

Attn: Derek M. Roberts, P.E

SUBJECT: Water Availability for project: Riverfront Estates, APN: Multiple Parcels, Case #: WA1570, T-14, R-14, SEC-02, Lots: 1-5,7-12, Location Code: TUC, Total Area: 2.06ac Zoning: R-2

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designation from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs.

This letter shall be null and void two years from the date of issuance.

Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development.

If you have any questions, please call New Development at 791-4718.

Sincerely,


Scott Schladweiler, P.E.
Engineering Manager
Tucson Water Department

SS:ka
CC:File
08/31/2018 ALEXANDRA HINES PIMA COUNTY WASTEWATER Reqs Change Applicant is responsible for obtaining reivew and approval of subdivision from Pima County at sewer@pima.gov.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/31/2018 AHINES2 OUT TO CUSTOMER Completed