Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - MINOR SUBD REVIEW
Plan Number - S18-067
Review Name: RESUBMITTAL - MINOR SUBD REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/06/2019 | QJONES1 | START | PLANS SUBMITTED | Completed | |
| 02/07/2019 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | DATE: February 7, 2019 FROM: Suzanne Gilpin, GIS Cartographer, Pima County Assessor's Office, (520)724-4387 RE: Assessor's Review and Comments Regarding Final Plat- S18-067 - 429 E LESTER (2ND Submittal-1ST Review) __X___ Plat does not meet Assessor's Office requirements. COMMENTS: 1. General notes must have the gross area of the subdivision, the number of lots, the number of miles of new road, public or private, even if the number is 0 and the Basic of Bearings. 2. There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision. 3. The perimeter line must be solid and the heaviest lineweight on the plat. The lot lines and common area lines must be solid and the next heaviest. Lines for erosion setbacks, floodplain lines etc. should be the lightest lineweight and be dashed or dot-dashed. 4. All hatching, stippling, striping, etc. must be removed in the final plat, unless another agency requires it. If so all lettering must have the hatching, etc. cut away so they are legible. |
| 03/06/2019 | ELISA HAMBLIN | ZONING | REVIEW | Reqs Change | CDRC Transmittal TO: Planning and Development Services Department Plans Coordination Office FROM: Elisa Hamblin, AICP Principal Planner PDSD Zoning Review Section PROJECT: Thorpe Acres Lots 1-A and 2-A, 429 E. Lester St. Minor Subdivision (2nd Review) S18-067 TRANSMITTAL DATE: March 6, 2019 DUE DATE: March 7, 2019 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). 1. 2-07.5.1.A. Per previous comments, the project location map must include a north arrow. The north arrow is missing on sheet 1. 2. 2-07.5.1.D. Per previous comments, Place the words "SEQ#________" in both the upper and lower right corners outside the margin line on both sheets. The blanks will be completed by the Pima County Recorder's Office at the time of recordation. The SEQ#________ is missing on sheet 2 upper right corner. 3. 2-07.5.1.E. - Per previous comments, ensure the title block on sheets 1 and 2 are exactly the same. Punctuation does not match. 4. 2-07.5.3.C - Remove the beneficiary title block, it is not necessary for this subdivision. 5. 2-07.5.3.E. - Revise the last signature line on the Assurances block to read "City of Tucson Engineer". Incorrect information was provided in the last comment letter. 6. 2-07.5.4.E. - Per previous comments, the height of the existing home must be shown to determine the 8' setback is sufficient on the east side of the property. The ramada, canopy and storage building can be demolished via a separate permit. However, this must be completed prior to approval of the minor subdivision. It is not permissible to approve a subdivision where a nonconforming situation is created (structures crossing property lines and an accessory structure on its own parcel). A demolition permit and documentation of the demolition will be required. 7. Once all comments have been addressed, an over-the-counter review can be scheduled for the next review of this subdivision. If you have any questions about this transmittal, please contact me at Elisa.Hamblin@tucsonaz.gov or (520) 837-4966. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 03/12/2019 | JOHN VAN WINKLE | ENGINEERING | REVIEW | Reqs Change | 1) Previous Comment 3. Per City of Tucson Administrative Manual (AM) section 2-07.5.5.A, provide, on final plat, at least one property corner tie to a section corner, quarter section corner, or an established city or county monument 2) sheet 1. Note 12, does not have a corresponding reference corner on sheet 2. Show on sheet 2 where note 12 applies John Van Winkle, P.E. John.VanWinkle@tucsonaz.gov 520-837-5007 |
| 03/14/2019 | ALEXANDRA HINES | ZONING-RECORDATION | REVIEW | Reqs Change | |
| 03/14/2019 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
| 03/14/2019 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | April 5, 2019 Susan Thorpe 429 E Lester St Tucson AZ 85705 Subject: (S18-067) Thorpe Acres Lots 1-A and Lot 2-A Final Plat Dear Susan, The above referenced project has been CONDITIONALLY APPROVED by the City Development Review Committee. Please make any necessary corrections and submit the following documents: 1 Address review comments from zoning, engineering, and assessor on executed final plat and provide comment response letter. 1 Executed Final Plat Double Matte Océ or Photo Mylar. 1 Title reports current within the last thirty (30) days or statement from Title Company certifying the title report previously submitted is still valid. 1 Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a flat $4.00 handling fee, along with Consent to Dedicate and CC&R fees if applicable. Consent to Dedicate and CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page. If the Consent to Dedicate is also a fixture filing, there is an additional $9.00 fee. If you are unsure of the fees, please call the County Recorders Office at 520-740-4350. Check must be dated within 45 days of the scheduled Mayor & Council meeting. 1 Original Set of Executed and notarized CC&R's document (if applicable) and Assurance Package (if applicable). 1 CD with PDF scan of signed Plat, CC&R's (if applicable) and Assurances (if applicable). 1 Provide the property owner(s) and engineering mailing address on a sheet of paper in the submittal to receive proper notification 1 week prior to the Mayor and Council Meeting (if no assurances). The Planning and Development Services Department makes sure the Assurances (if applicable) are reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CC&R's and assurances must be approved at the same Mayor and Council Meeting. Please expect 5 weeks from the date submitted to the date scheduled for Mayor and Council approval. Should you have any questions, please call me at (520) 837-6975. Sincerely, Alexandra Hines Lead Planner All comments for this case are available on our website at www.tucsonaz.gov/PRO. Via Permits Plus/E-mail |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 04/05/2019 | AHINES2 | OUT TO CUSTOMER | Completed |