Plan Number: S18-031
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S18-031
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/06/2018 ALEXANDRA HINES START PLANS SUBMITTED Completed
04/06/2018 AHINES2 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed Proposal under six lots.
05/02/2018 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Steve Shields - Principal Planner
PDSD Zoning Review Section

PROJECT: ABC Broadway Center
Final Plat (1st Review)
S18-031

TRANSMITTAL DATE: May 3, 2018

DUE DATE: May 4, 2018

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.


2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:

2-07.5.1.A.3 Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and,

1. COMMENT: Label the subdivisions within the 1 square mile location map.


2-07.5.2 General Notes
The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information.

2-07.5.2.J If applicable, add the following note: "This subdivision is subject to Ordinance No. ____ which established zoning in the _____________________ Annexation Area."

2. COMMENT: Add above note on the cover sheet of the final plat. The ordinance number is "2724" and the annexation area is called "Pantano Area"


2-07.5.3 Standard Paragraphs
The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.




2-07.5.4 Proposed Subdivision Information
Provide the following information on the plat:


2-07.5.6 Protective Covenants

Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will:
2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and

3. COMMENT: Clarify what type of document is to be provided that grants cross access and possibly cross parking? If there an existing document that provides for the cross access and cross parking, how will it be amended to include the newly created lots? Submit a copy of the document(s).


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
05/03/2018 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change Tucson Electric Power Co., (TEP) has reviewed the Final Plat submitted on April 6, 2018 and is unable to approve at this time. TEP easement recorded in Book 6458 Pg 809 has not been fully identified on the plat. Please depict the easement in its entirety and re-submit for TEP approval.



If you have any questions, please contact me at 520-917-8744.



Thank you,

Mary Burke

Right of Way Agent III

Tucson Electric Power Co.

Land Resources – RC 131

3950 E. Irvington Road

Tucson, AZ 85714-2114

Office - 520-917-8744

Cell - 520-401-9895

mburke@tep.com
05/07/2018 JOHN VAN WINKLE ENGINEERING REVIEW Approv-Cond S18-031

1) Change the project number which currently reads as "S2018-_____" to S18-031
2) Above comment can be reviewed upon final submission. Ensure that all comments from other departments are addressed

John Van Winkle, P.E.
John.VanWinkle@tucsonaz.gov
520-837-5007
05/07/2018 KELLY LEE UTILITIES SOUTHWEST GAS Passed
05/08/2018 KELLY LEE ZONING-DECISION LETTER REVIEW Reqs Change Plan Returned for Corrections Notice: S18-031

This review has been completed and resubmittal is required. Please resubmit the following items to PDSD Filedrop https://www.tucsonaz.gov/file-upload-pdsd:
1) Revised Plan Set
2) All approved documents submitted previously
4) All items requested by review staff
5) All items needed to approve these plans

Please remember to name your files appropriately, for example:


Example 2 (second submittal):
2_plan_set.pdf
2_soils_report.pdf
05/08/2018 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change

Final Status

Task End Date Reviewer's Name Type of Review Description
05/08/2018 KLEE1 OUT TO CUSTOMER Completed