Plan Review Detail
Review Status: Completed
Review Details: RESUBMITTAL - MINOR SUBD REVIEW
Plan Number - S18-021
Review Name: RESUBMITTAL - MINOR SUBD REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/27/2018 | LPEREZ2 | START | PLANS SUBMITTED | Completed | |
| 05/02/2018 | KELLY LEE | UTILITIES | SOUTHWEST GAS | Passed | |
| 05/02/2018 | KELLY LEE | PIMA COUNTY | WASTEWATER | Passed | Good afternoon Diane, There is no requirement for Pima County Development Services to review this minor subdivision submittal since no new Public sewer infrastructure is proposed. The undeveloped parcel/lot #6A’s hcs connection will be reviewed during the building permit stage. Joseph Joseph Godoy Site Division Manager Pima County Development Services 201 N. Stone Ave Tucson, AZ 85701 joseph.godoy@pima.gov (520) 724-6756 |
| 05/08/2018 | EHAMBLI1 | ZONING | REVIEW | Approv-Cond | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Elisa Hamblin, AICP Lead Planner PDSD Zoning Review Section PROJECT: Minor Subdivision - 3 Lots Final Plat (Approved with conditions) S18-021 - 6208 E. Lee Street TRANSMITTAL DATE: May 8, 2018 DUE DATE: May 22, 2018 COMMENTS: Zoning has conditionally approved this minor subdivision plat subject to the comments being addressed on the Mylar submittal. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.5.0 CONTENT REQUIREMENTS 5.1 General 2-07.5.2 General Notes The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information. 2-07.5.2.J If applicable, add the following note: "This subdivision is subject to Ordinance No. ____ which established zoning in the _____________________ Annexation Area." 1. COMMENT: Correct the typos (capitalization of Roger and misspelling of Kolb) in the following general note: "This subdivision is subject to Ordinance No. 1895 which established zoning in the North To Roger Rd. And East To Kolb Rd. Annexation Area." 2-07.5.3 Standard Paragraphs The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal. 2-07.5.3.E Assurances The following ASSURANCE block must be placed on the plat's first sheet. ASSURANCES "This is to certify that all improvements, such as streets, sidewalks, sewers, water and utility installation, drainage and flood control facilities, and monuments, required by the City of Tucson have been completed or the future completion of such improvements has been assured by a land trust financial assurance agreement, the posting of performance bonds, an escrow account, letter of credit, or other security as the City of Tucson deems necessary and proper. In the event that any such assurance expires, lapses or is otherwise inadequate to assure the completion of assurable infrastructure, the city may suspend the issuance of building permits or certificates of occupancy." City of Tucson Planning and Development Services Department Director City of Tucson Engineer 2. COMMENT: Correct the assurance text block. The last two lines regarding the department director and engineer are missing. If you have any questions about this transmittal, contact Elisa Hamblin at (520) 837-4966 or Elisa.Hamblin@tucsonaz.gov or Steve Shields at (520) 837-4956 or Steve.Shields@tucsonaz.gov |
| 05/08/2018 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | Office of the Pima County Assessor 240 N. Stone Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: City of Tucson Development Services FROM: Suzanne Gilpin GIS Cartographer Pima County Assessor's Office (520)724-4387 DATE: May 8, 2018 RE: Assessor's Review and Comments Regarding Final Plat- S18-021/Minor Subdivision - 2nd Submittal * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor's Office requirements. __x___ Plat does not meet Assessor's Office requirements. COMMENTS: 1. There must be a section tie, with a bearing and dimension from the section corner or quarter corner to the point of tie on the subdivision. 2. All Adjacent subdivisions should be named, with map and plat in the appropriate areas around the subdivision. NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
| 05/15/2018 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) has reviewed and approves the Final Plat submitted on May 2, 2018. If you have any questions, please contact me at 520-917-8744. Thank you, Mary Burke Right of Way Agent III Tucson Electric Power Co. Land Resources – RC 131 3950 E. Irvington Road Tucson, AZ 85714-2114 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
| 05/16/2018 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 05/22/2018 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | Comment not addressed. Clarify the location of the existing water meter (keynote 14); Tucson Water records indicate that an existing 5/8" water meter is located in the northeast corner of lot 6A that is serving the existing structures. |
| 05/25/2018 | ALEXANDRA HINES | ZONING-RECORDATION | REVIEW | Passed | |
| 05/25/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | 1. Provide the required signature lines for the assurance statement. The two signature lines should be for the "City of Tucson Planning and Development Services Department Director" and the "City of Tucson City Engineer." 2. Provide the notary acknowledgment statement after the Dedication section: State of Arizona ) s.s.: Pima County ) On this ________ day of ________________, 20____, before me personally appeared __________________, who acknowledged to be the trust official of ___________________ and being authorized so to do, executed the foregoing instrument for the purpose therein. My commission expires: ____________ Notary Public |
| 05/25/2018 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 05/29/2018 | ARUIZ1 | OUT TO CUSTOMER | Completed |