Plan Number: S18-019
Parcel: Unknown

Address:
6133 S ANTRIM LP

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S18-019
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
11/23/2018 SBEASLE1 START PLANS SUBMITTED Completed
12/13/2018 SBEASLE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approved December 13, 2018

Alexandra Hines
Lead Planner
City of Tucson
Public Works Buildings - 201 North Stone Avenue
Tucson, AZ. 85701

RE: S18-019 Desert Point 2 / 3rd Submittal, Received November 23, 2018

Dear Ms. Hines,
Thank you for the opportunity to comment on S18-019, Desert Point 2; 3rd Submittal, a final plat application for an approximately 8.37 acre site located east of South Alvernon Way, north of East Valencia Road, and south of East Benson Highway. This project site is specifically located north of the intersection of East Spring Water Drive and South Antrim Loop. The proposed land use is residential, establishing a single family residential use.
This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.
The Tucson Airport Authority is satisfied with the 3rd submittal of this project and has no additional comments to submit.
Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.
Respectfully,

Scott Robidoux, Senior Airport Planner
cc file
12/19/2018 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
PDSD Zoning Review Section

PROJECT: Desert Point 2 - Lots 1 - 41 and Common Areas "A" and "B" FLD
Final Plat (1st Review) 6133 S. Antrim Loop
S18-0019 - Related to DP17-0102

TRANSMITTAL DATE: December 19, 2018

DUE DATE: December 19, 2018

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013)


2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.

2-07.5.1.H - The Subdivision Case number assigned to the final plat and the DP case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

1. COMMENT: The rezoning case was not listed on sheets 2 -4. List the case number as requested per the previous comment.

The Development Package case number DP17-0102 was not listed on sheets 2 -4. List the case number as requested per the previous comment.

2-07.5.6 Protective Covenants
Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will:
2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and

2. COMMENT: It appears that the article numbers do not match what is listed on the CC&R pages. Review the table of contents article number and compare to te4h numbers listed on the pages. Revise the CC&Rs as required.

The information in the title sheet of the CC&R's shall match the information in the title block of the DP verbatim. (It shall also include that this is a FLD development.)


3. COMMENT: The Development package was approved and signed November 30, 2018 and has yet to be picked up. In order for the DP to get by PDSD staff the DP must be pulled and any remaining fees paid, if any.


4. COMMENT: The information in the title block of the Final Plat shall match the information listed on the DP title block, Verbatim. Revise the title block as required.


If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
12/19/2018 LOREN MAKUS ENGINEERING REVIEW Reqs Change Provide the changes requested by the Zoning reviewer.
Include a copy of the CC&Rs with the submittal.
12/27/2018 SBEASLE1 UTILITIES TUCSON ELECTRIC POWER Approved 12/27/18 email:
Tucson Electric Power Co., (TEP) approves the final plat.
If there are any questions, please contact me at 520-917-8744. Thank you,

Mary Burke
Right of Way Agent
Tucson Electric Power Co.
Office - 520-917-8744
Cell - 520-401-9895
12/27/2018 SBEASLE1 ZONING-DECISION LETTER REVIEW Reqs Change Plans Returned for Corrections (RFC) Notice: S18-019
Project Description: E FINAL PLAT - DESERT POINT 2

The review has been completed and a resubmittal is required.
To see review comments, visit PRO at www.tucsonaz.gov/PRO, then search by activity number. (If new comments aren't shown yet, check back later as data flows to PRO periodically throughout the day.)
Prepare a Comment Response Letter detailing changes to the plan and which review comments are being addressed. After the necessary corrections have been made to the plans, type the activity number in the Project Description and name the files as described on the PDSD Filedrop web page, for example, second (4th) submittal: “4_Plan_Set.pdf”. ­
Submit the following items to PDSD Filedrop at www.tucsonaz.gov/file-upload-pdsd. The plans will then re-enter a 20-working-day review cycle.­
1) Comment Response Letter
2) Corrected plan set with all documents
3) Items requested by review staff
The current fee balance is $0 (zero).
Thank you.
Sharon Beasley
City of Tucson
Planning and Development Svcs. Dept.
201 N. Stone Avenue, First Floor
Tucson, AZ 85701

Final Status

Task End Date Reviewer's Name Type of Review Description
12/27/2018 SBEASLE1 OUT TO CUSTOMER Completed