Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S18-019
Parcel: Unknown

Address:
6133 S ANTRIM LP

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S18-019
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/09/2018 ALEXANDRA HINES START PLANS SUBMITTED Completed
03/09/2018 AHINES2 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved Ray Water Assurance Letter under documents table in PRO/SIRE for DP17-0102.
03/09/2018 ALEXANDRA HINES UTILITIES SOUTHWEST GAS Passed Agency notified for information only.
03/12/2018 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change Office of the Pima County Assessor
240 N STONE AVENUE
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson

FROM: Ada Griffin
GIS Cartographer
Pima County Assessor's Office


DATE: March 12, 2018


RE: Assessor's Review and Comments Regarding:

S18-019 1ST SUBMITTAL OF FINAL PLAT FOR DESERT POINT 2



* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Plat meets Assessor's Office requirements.
___X___ Plat does not meet Assessor's Office requirements.

COMMENTS:


" GENERAL NOTES MUST HAVE THE BASIS OF BEARING. INCLUDING THE BEARING REFERENCE.

" THERE MUST BE BEARINGS AND DIMENSIONS FOR THE PERIMETER AND ALL LOT LINES AND ALL COMMON AREAS.

" ALL ADJACENT SUBDIVISIONS SHOULD BE NAMED, WITH MAP AND PLAT IN THE APPROPRIATE AREAS AROUND THE SUBDIVISION.

" OWNERSHIP DOES NOT MATCH OUR RECORDS. OUR RECORDS INDICATE THE OWNERS AS:

TITLE SECURITY AGENCY LLC TR201805-S

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
03/26/2018 KELLY LEE OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approv-Cond March 22, 2018

Alexandra Hines
Lead Planner
City of Tucson
Public Works Buildings - 201 North Stone Avenue
Tucson, AZ. 85701

RE: S18-019 Desert Point 2 / 1st Submittal, Received March 9, 2018

Dear Ms. Hines,

Thank you for the opportunity to comment on S18-019, Desert Point 2; 1st Submittal, a final plat application for an approximately 8.37 acre site located east of South Alvernon Way, north of East Valencia Road, and south of East Benson Highway. This project site is specifically located north of the intersection of East Spring Water Drive and South Antrim Loop. The proposed land use is residential, establishing a single family residential use.

This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.

The Tucson Airport Authority has learned that the Avigation Easement document was recorded for this project on 12/21/2017, associated with a previous City of Tucson project submittal DP17-0102. The Tucson Airport Authority reviewed a Condition of Title Report, dated 2/8/2018, which was included with this project submittal and noticed that the Avigation Easement was not documented on the Condition of Title Report. The Tucson Airport Authority discovered that the first page of the recorded Avigation Easement document, from the Pima County Recorder's Office, indicated that this recordation was a courtesy recording with no title liability. The Avigation Easement document shall be re-recorded in a manner which documents the Avigation Easement as having title liability; all subsequent title searches on this property shall identify and document the recorded Avigation Easement.

The Tucson Airport Authority conditionally approves the subject request contingent upon the following condition of approval, as noted below. This condition should be identified in the general notes of the approved development plan.

Conditions of approval:

1. "According to the FAA Notice Criteria Tool, this project is located in proximity to a navigation facility and could impact navigation signal reception. The applicant shall file Form 7460 with the FAA at least 45 days before construction activities begin for the project. It is highly recommended that the applicant file earlier than 45 days to provide the applicant with sufficient time to respond to any concerns which are identified by the FAA. Any cranes used which are used must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp"

2. "That prior to the City's approval of any construction permit for a permanent building, the property owner shall record the Avigation Easement prior to the subdivision process which discloses the existence, and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The Avigation Easement shall be recorded in a manner with the Pima County recorder which shall document it as having title liability. The content of such documents shall be according to the form and instructions provided."

The current property owner or person authorized to sign on behalf of the current property owner shall complete, sign, and record the Avigation Easement. Please record the Avigation Easement with the Pima County Recorder's Office. The Avigation Easement document shall be re-recorded in a manner which documents the Avigation Easement as having title liability; all subsequent title searches on this property shall identify and document the recorded Avigation Easement. Once the Avigation Easement is recorded please send a complete copy of the recorded easement to Tucson Airport Authority by either email (send to srobidoux@flytucson.com) or to the mailing address provided below.

Scott Robidoux
Senior Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard
Suite 300
Tucson, AZ 85756

3. "The developer shall provide the Airport Disclosure Statement form, at time of sale, to the new property owners with new unit purchases. In the event the development of any residential uses does not involve the sale of new units, but is instead offering rental residential units to the public, the new tenant of the rental unit shall be provided a copy of the Airport Disclosure Statement form. The intent of the Airport Disclosure Statement form is to educate and notify the new residents that they are living near an airport. The content of such documents shall be according to the form and instructions provided."

The new property owner or new tenant shall forward a signed copy of the Airport Disclosure Statement form to the Tucson Airport Authority, using the mailing address provided below.

Scott Robidoux
Senior Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard
Suite 300
Tucson, AZ 85756

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.

Respectfully,


Scott Robidoux,
Senior Airport Planner

cc file
04/03/2018 ALEXANDRA HINES ZONING REVIEW Reqs Change ***The attachment can be viewed in documents table on PRO.***

S18-019 Desert Point 2 / 1st Submittal is being Returned for Corrections by Pima County Addressing.

The attached pdf contains Addressing’s comments. Please let me know if you have any questions.

Thank you,

Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
04/06/2018 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on March 9, 2018 and is unable to approve at this time. A preliminary electrical design must be completed and easements for TEP facilities shown on the plat for TEP approval.

In order for TEP to prepare an electrical design for this subdivision, please email a copy of the Approved Tentative Plat and water plans to mburke@tep.com.

If you have any questions, please contact me at 917-8744.

Thank you,

Mary Burke
Right of Way Agent III
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road
Tucson, AZ 85714-2114
Office - 520-917-8744
Cell - 520-401-9895
mburke@tep.com
04/06/2018 ALEXANDRA HINES PIMA COUNTY ADDRESSING Reqs Change ***Attachment can be viewed in documents table on PRO.***

S18-019 Desert Point 2 / 1st Submittal is being Returned for Corrections by Pima County Addressing.

The attached pdf contains Addressing’s comments. Please let me know if you have any questions.

Thank you,

Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
04/06/2018 ALEXANDRA HINES PIMA COUNTY WASTEWATER Approved P18WS00023
04/12/2018 LOREN MAKUS ENGINEERING REVIEW Reqs Change 1. The final plat cannot be approved until the tentative plat (DP17-102) has been approved.
2. Any changes to the tentative plat must be reflected on the final plat.
3. Add the complete subdivision case number to each page of the agreement to construct.
4. Revise general note 9 on sheet 1 of the plat.
5. Change the signature line for the City of Tucson PDSD Engineering Administrator to City of Tucson City Engineer.
6. When the Mylar is submitted, fill in the line for "was filed at the request of _____________"
7. Revise the notes on the plat and include the required notes for the third party land trust assurances.
8. The sight visibility triangle details should be removed from sheets 3 and 4. SVTs should be documented on the tentative plat.
9. Ensure the space for the sequence number is long enough for the number.
10. The title report lists two easements not shown on the plat. Please clarify the locations and status of these easements.
04/13/2018 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All items requested by review staff approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
05/02/2018 KLEE1 APPROVAL SHELF Completed
05/02/2018 KLEE1 REJECT SHELF Completed
05/02/2018 KLEE1 OUT TO CUSTOMER Completed