Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S17-076
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/02/2018 | ALEXANDRA HINES | PIMA COUNTY | ADDRESSING | Reqs Change | ***Attachment can be viewed in Documents table on PRO.*** S17-076 Saguaro Trail Final Plat- Block 1/ 1st Submittal is being Returned for Corrections by Pima County Addressing. The attached pdf contains Addressing’s comments. Please let me know if you have any questions. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
01/09/2018 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | TO: Development Services Department Plans Coordination Office FROM: David Rivera for Steve Shields - Principal Planner PDSD Zoning Review Section PROJECT: Saguaro Trails - Block 1 Subdivision Final Plat (1st Review) S17-076 TRANSMITTAL DATE: January 9, 2017 DUE DATE: January 9, 2017 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. 1. COMMENT: As of this review of the Final Plat package the tentative plat has not been approved. Be aware that the final plat cannot be approved ahead of the tentative plat. 2-07.5.1.H The DP case number for assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 2. COMMENT: List the tentative plat / development package case number DP17-0216 in the lower right corner next to the title block of all final plat sheets. 2-07.5.3.B.3 Add the following hold-harmless statement: "(I/We), the undersigned, do hereby hold harmless the City of Tucson, its successors and assigns, their employees, officers, and agents from any and all claims for damages related to the use of the property depicted on this plat now and in the future by reason of flooding, flowage, erosion, or damage caused by water, whether surface flood or rainfall." 3. COMMENT: Revise the second paragraph under the dedication text block as noted by the standard above. The Harmless note includes Pima County, it should state City of Tucson etc. 2-07.5.4 Proposed Subdivision Information Provide the following information on the plat: 2-07.5.4.B. Identify each block or lot within the subdivision boundary by number, and include the square footage of each; 4. COMMENT: On sheet 5, Lot 37 has been labeled with the incorrect lot number, revise as required. 2-07.5.6 Protective Covenants Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will: 2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and 5. COMMENT: Submit a copy of the CC&R's with the next submittal of the final plat. 6. COMMENT: Under the assurances text block revise the title of City of Tucson PDSD Engineering Administrator to "City of Tucson Engineer". If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
01/16/2018 | ALEXANDRA HINES | PIMA COUNTY | WASTEWATER | Needs Review | Applicant is responsible for obtaining review and approval from Pima County at sewer@pima.gov prior to plat approval. |
01/19/2018 | KELLY LEE | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
01/19/2018 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
12/08/2017 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
12/14/2017 | KLEE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | August 14, 2017 EEC 555 E. River Rd. Ste #301 Tucson, AZ 85704 Attn: Ryan Stucki, P.E SUBJECT: Water Availability for project: 5700 S. Houghton Rd, APN: 14101006C, Case #: WA2264, T-15, R-15, SEC-02, Lots: 9999, Location Code: TUC, Total Area: 172.3ac Zoning: PAD-30 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designation from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Sincerely, Richard A. Sarti, P.E. Engineering Manager Tucson Water Department RS:ka CC:File |
12/21/2017 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Reqs Change | Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on December 14, 2017 and is unable to approve the plat. An electrical design must be completed and easements shown on the plat before we can approve. In addition, TEP requires a minimum of 10ft x 10ft easement for its pedestals and transformers. The 6ft Public Utility Easement (PUE) shown on the plat will not be adequate for TEP equipment. The standard 10ft PUE width will be required. If you have any questions, please contact me at 520-917-8744. Thank you, Mary Burke Right of Way Agent III Tucson Electric Power Co. Land Resources – RC 131 3950 E. Irvington Road Tucson, AZ 85714-2114 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
12/21/2017 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson FROM: Ada Griffin GIS Cartographer Pima County Assessor's Office DATE: December 21, 2017 RE: Assessor's Review and Comments Regarding: S17-076 1st Submittal Saguaro Trail Final Plat-Block 1 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor's Office requirements. ___X___ Plat does not meet Assessor's Office requirements. COMMENTS: " THE TITLE BOX IN THE LOWER RIGHT HAND CORNER IS MISSING A/THE SEQUENCE NUMBER? IT IS UNCLEAR WHAT THIS SEQUENCE NUMBER IS, SINCE IT DOESN'T APPEAR TO BE A RESUBDIVISION OF ANOTHER SUBDIVISION. PLEASE CLARIFY. " MISSING THE SOUTH LINE DESIGNATION OF THE PERIMETER. NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
12/21/2017 | ALEXANDRA HINES | UTILITIES | SOUTHWEST GAS | Passed | Agency notified for information only. |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
01/24/2018 | QJONES1 | APPROVAL SHELF | Completed |
01/24/2018 | QJONES1 | REJECT SHELF | Completed |
01/24/2018 | QJONES1 | OUT TO CUSTOMER | Completed |