Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S17-038
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S17-038
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
07/27/2017 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Steve Shields - Principal Planner
PDSD Zoning Review Section

PROJECT: Commercial Business Park, Lots 1-3 and Common Area "A" Trail Easement
Final Plat (1st Review)
S17-038

TRANSMITTAL DATE: August 1, 2017

DUE DATE: August 22, 2017

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).


2-07.3.0 SUBMITTAL TIMING
Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat.


5.1 General

2-07.5.1.A - A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:
2-07.5.1.A.1 - The project site approximately centered within a one square mile area;
2-07.5.1.A.2 - Label the section, township, and range; section corners; north arrow; and the scale;
2-07.5.1.A.3 - Subdivisions, arterial and collector streets, major watercourses, and railroads within the one-mile area; and,
2-07.5.1.A.4 - The City of Tucson jurisdictional limits, if within the mapped area.

1. COMMENT: Provide the location map in upper right corner of the cover sheet as noted by the standards above.


2-07.5.1.D Place the words "SEQ#________" in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder's Office at the time of recordation.

2. COMMENT: Place the words "SEQ. ____" as noted by the standard above. The words are to be placed outside the border in the lower right and upper right corners, see redlines.

2-07.5.1.E.1 Subdivision name; number of blocks, lots, and/or units; and common area;

3. COMMENT: In the title block, Common Area A has been listed along with a Trail Easement. Clarify if all of Common Area A is the trail easement. If not draw and label the trail easement in a surveyable manner on sheet 2.


2-07.5.1.H The S(Year)-___ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

4. COMMENT: This project has been assigned the PDSD Final Plat case number S17-038. List the case number in the lower right corner next to the title block of both sheets.


2-07.5.2 General Notes

2-07.5.2.D If the property is subject to conditions of rezoning, add the following note: "This plat is subject to the conditions of rezoning case number C9-__-__, unless superseded by a subsequent rezoning ordinance."

5. COMMENT: The rezoning case expired and is not applicable to this parcel. Remove the reference rezoning general note 6 from the cover sheet.


2-07.5.2.J If applicable, add the following note: "This subdivision is subject to Ordinance No. ____ which established zoning in the _____________________ Annexation Area."

6. COMMENT: List the above note filling in the blanks with the Ord. # "C9-93-01" and 22nd St. and Houghton Road" annexation area.

2-07.5.3 Standard Paragraphs
The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal.

2-07.5.4 Proposed Subdivision Information
Provide the following information on the plat:
2-07.5.4.A. Indicate the name and width of each street, alley, easement (type), and drainage way within the subdivision boundary being created by this plat. Label each as public or private, along with the appropriate dedication notation;

7. COMMENT: Draw and label the Trail Easement. See related comment 3.


2-07.5.4.H. Show no-vehicular access easements where applicable;

8. COMMENT: If applicable show No-vehicular easements on sheet 2.

2-07.5.4.I. Show detention/retention areas in a surveyable and readily retraceable manner;

9. COMMENT: If applicable draw and label the detention/retention areas as noted by the standard above.



2-07.5.4.L. Areas that include Protected Riparian Area shall be shown on the plat in a surveyable manner and designated as areas where no further development is permitted.

10. COMMENT: If applicable draw and label Protected Riparian Area as noted by the standard above.



If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
07/28/2017 KELLY LEE START PLANS SUBMITTED Completed
07/28/2017 KLEE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Passed Less than 6 lots and within Tucson Water Service Area.
08/03/2017 ALEXANDRA HINES PIMA COUNTY ADDRESSING Reqs Change *View 8/3/17 email from Robin Freiman for image of review comment.*

S17-038 Commercial Business Park / 1st Submittal is Conditionally Approved by Pima County Addressing with one request to add a Star to Lot 1 indicating the access to the corner lot. I have also included the addresses that will be assigned once the final plat records.

Please let me know if you have any questions or if I may assist you further.

Warm Regards,

Robin Freiman
Addressing Official
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
08/10/2017 KELLY LEE UTILITIES SOUTHWEST GAS Passed
08/17/2017 LOREN MAKUS ENGINEERING REVIEW Reqs Change S17-038
1. Add the note indicating a floodplain use permit may be required for development on lots 2 and 3.
2. Add dedication of the trail easement to the dedication paragraphs.
3. Provide drafts of cross access and joint maintenance agreements as applicable.
08/21/2017 MMORENO1 URBAN PLANNING REVIEW Approved
08/21/2017 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power has reviewed and approves the final plat submitted on July 28, 2017. Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument.

Please contact me at 520-917-8744 should you have any questions.

Thank you,

Mary Burke
Right of Way Agent III
Tucson Electric Power Co.
Land Resources – RC 131
3950 E. Irvington Road
Tucson, AZ 85714-2114
Office - 520-917-8744
Cell - 520-401-9895
mburke@tep.com
08/22/2017 ALEXANDRA HINES PIMA COUNTY WASTEWATER Reqs Change August 22, 2017

To: Geoff Brimhall
Daniel White
Physical Resource Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: _______________________________________________
Debbie Ketchem, Civil Engineer Assistant - Sr.
Development Liaison Unit
Subject: Review Letter - sewer elements only
Final Plat - 1st Submittal, P17WS00071 (S17-038)
Commercial Business Park, Lots 1-3 and Common Area "A"
_______________________________________________________________________

Pima County Regional Wastewater Reclamation Department (PCRWRD) received this Final Plat on August 22, 2017. The following revisions are requested:
1. Dedication, paragraph two (2), remove public sewer. Public sewer is located within the right-of-way.

2. Provide locator map on first page.

3. The plans should show the Engineer Firm (or others) that have prepared the plans.

The next submittal will be the 2nd submittal for this Final Plat. The RWRD review fee for the 2nd submittal will be $50.00 (Per PC Code, Title 13.20.030.A.2).

Do not hesitate to contact me if you have any questions at (520) 724-6481.

Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD
Francisco Galindo, P.E., RWRD
08/25/2017 ALEXANDRA HINES ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:
1) Two rolled sets of the plans
2) All approved documents submitted previously
3) A disk containing all items submitted
4) All items requested by review staff
5) All items needed to approve these plans
08/25/2017 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change Office of the Pima County Assessor
240 N STONE AVENUE
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR

TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)


FROM: Julieann Arechederra
GIS Cartographer
Pima County Assessor's Office


DATE: August 25, 2017

RE: Assessor's Review and Comments Regarding:

Commerical Business Park (Final plat) S17-038

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Plat meets Assessor's Office requirements.
___X___ Plat does not meet Assessor's Office requirements.

COMMENTS:


" THE LOCATION MAP MUST BE IN THE UPPER RIGHT HAND CORNER AND MUST HAVE THE SECTION, TOWNSHIP AND RANGE. THE PROJECT AREA SHOULD BE OUTLINED OR HAVE AN ARROW POINT TO IT.


" PLEASE ADD OWERSHIP. OUR RECORDS INDICATE STEWART TITLE & TRUST TR 3284 ATTENTION: SOUTHWEST VALUE PRTNRS HOLDINGS AS OWNERS OF THIS PROPERTY.

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.

Final Status

Task End Date Reviewer's Name Type of Review Description
08/28/2017 QJONES1 APPROVAL SHELF Completed
08/28/2017 QJONES1 REJECT SHELF Completed
08/28/2017 QJONES1 OUT TO CUSTOMER Completed