Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S17-032
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/29/2017 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
| 06/29/2017 | KELLY LEE | UTILITIES | SOUTHWEST GAS | Passed | Agency for Informational Purposes Only. |
| 06/29/2017 | KELLY LEE | OTHER AGENCIES | U. S. POST OFFICE | Passed | Agency for Information Purposes Only. |
| 06/29/2017 | KELLY LEE | OTHER AGENCIES | PIMA ASSN OF GOVTS | Passed | Agency for Informational Purposes only. |
| 06/30/2017 | DAVID RIVERA | ZONING HC | REVIEW | Approved | |
| 06/30/2017 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Principal Planner PROJECT: Bermuda Minor Subdivision - 3-Lot Residential Subdivision Final Plat (1st Review) S17-032 TRANSMITTAL DATE: June 30, 2017 DUE DATE: July 27, 2017 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). 2-07.5.1.A A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information: 1. COMMENT: List the correct range number under the location map. The Range is 14 East. 2-07.5.1.H The S(Year)-___ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 2. COMMENT: This Minor Subdivision has been assigned the PDSD Final Plat case number S17-032. List the case number next to the title block. 2-07.5.3.E Assurances The following ASSURANCE block must be placed on the plat's first sheet. ASSURANCES "This is to certify that all improvements, such as streets, sidewalks, sewers, water and utility installation, drainage and flood control facilities, and monuments, required by the City of Tucson have been completed or the future completion of such improvements has been assured by a land trust financial assurance agreement, the posting of performance bonds, an escrow account, letter of credit, or other security as the City of Tucson deems necessary and proper. In the event that any such assurance expires, lapses or is otherwise inadequate to assure the completion of assurable infrastructure, the city may suspend the issuance of building permits or certificates of occupancy." City of Tucson Planning and Development Services Department Director City of Tucson Engineer 3. COMMENT: Add the Assurance text block as noted by the standard above. 2-07.5.4.H. Show no-vehicular access easements where applicable; 4. COMMENT: If applicable show and label no vehicular access easements on the plat. 5. COMMENT: Include 2 full size copies of the supplemental site plan for lot 1 with the next submittal. Clarify what the new address for Lot 1 will be or will it remain as 3530 E Bermuda Street. The copy of the site plan for lot 1 will have to be provided to PDSD for records archiving and digital scanning. 6. COMMENT: Remove the zoning classifications from the final plat sheet. If you have any questions about this transmittal, Contact David Rivera on Tuesday or Wednesday at (520) 837-4957 or by email David.Rivera@tucsonaz.gov or contact Steve Shields any time during the week at (520) 837-4956 or email Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 07/03/2017 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | Office of the Pima County Assessor 240 N. Stone Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: City of Tucson Development Services FROM: Suzanne Gilpin GIS Cartographer Pima County Assessor's Office (520)724-4387 DATE: June 30, 2017 RE: Assessor's Review and Comments Regarding Final Plat- S17-032 / BERMUDA MINOR SUBDIVISION * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor's Office requirements. __X___ Plat does not meet Assessor's Office requirements. COMMENTS: " There must be a Section Tie, with a bearing and dimension from the Section corner or Quarter corner to the Point of Tie on the subdivision. " All hatching, stippling, striping etc., must be removed in the final plat, unless another agency requires it. If so all lettering must have the hatching, etc., cut away so they are legible. " Ownership is currently showing as 'Infinity Investments Arizona, LLC'. You are showing within the Dedication, 'Infinity Investments-Puget Sound, LLC.' If this is the intended ownership Deed must be recorded to read as the dedication ownership prior to recordation of the Plat. NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
| 07/10/2017 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | Tucson Electric Power Co., (TEP) has reviewed and approves the Bermuda Minor Subdivision final plat submitted on June 30, 2017. Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument. If you have any questions, please contact me at 520-917-8744. Thank you, Mary Burke Right of Way Agent III Tucson Electric Power Co. Mail Stop HQE613 PO Box 711, Tucson, AZ 85702 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
| 07/11/2017 | KELLY LEE | PIMA COUNTY | WASTEWATER | Reqs Change | July 11, 2017 To: Peter Salonga Oracle Engineering Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department From: _______________________________________________ Debbie Ketchem, Civil Engineer Assistant - Sr. Development Liaison Unit Subject: Review Letter - sewer elements only Final Plat - 1st Submittal, P17WS00058 (S17-032) Bermuda Minor Subdivision, Lots 1-3 _______________________________________________________________________ Pima County Regional Wastewater Reclamation Department (PCRWRD) received this Final Plat on July 10, 2017. The following revisions are requested: 1. A Capacity Type II availability letter or waiver letter must be issued for this project before the Final Plat can be approved. 2. In Title Block correct Glantland to "Grantland". 3. What are the plans for sewer service for all lots? Provide a site plan for the "proposed" sewer. The Dedication states it will be public sewer, is this correct? If not, the dedication will need to be revised appropriately. The next submittal will be the 2nd submittal for this Final Plat. The RWRD review fee for the 2nd submittal will be $0.00 (Per PC Code, Title 13.20.030.A.2). Do not hesitate to contact me if you have any questions at (520) 724-6481. Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD Francisco Galindo, P.E., RWRD |
| 07/12/2017 | KAY MARKS | PIMA COUNTY | ADDRESSING | Reqs Change | Good Morning, S17-032 BERMUDA MINOR SUBDIVISION / 1st Submittal is being Returned for Corrections by Pima County Addressing. The attached pdf contains Addressing’s comments. Please let me know if you have any questions. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 Description: Description: cid:image001.png@01CE70DF.60625CC0 |
| 07/13/2017 | ROBERT SHERRY | PLUMBING-RESIDENTIAL | REVIEW | Completed | |
| 07/24/2017 | PCDS | ENGINEERING | REVIEW | Approved | CDRC TRANSMITTAL TO: Planning and Development Services Department FROM: Laith Alshami, P.E., Site Project Manager PROJECT: S17-032, Bermuda Minor subdivision - Final Plat (1st Review) TRANSMITTAL DATE: 07/24/2017 DUE DATE: 07/26/2017 The Final Plat appears to be compliant and it is hereby recommended for approval pertaining to Engineering and Floodplain Review. If you have any questions about this transmittal, please contact Loren Makus, 520-837-4927 or loren.makus@tucsonaz.gov. |
| 07/24/2017 | PCDS | ENGINEERING | REVIEW | Approved | Please be aware of the following items following the recordation of the plat. It would be helpful to have your responses with the next submittal. Please be advised of the following observations: 1. The existing curb openings do not appear to align with the proposed access easements. Will the applicant be required to relocate the curb openings? 2. Will the existing residence, on Lot 1, be using a new curb opening for access or one of the proposed access easements? A right of way permit may be required for either options. |
| 07/26/2017 | JANE DUARTE | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are affected by this subdivision. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation (520) 837-8040 Howard.Dutt@tucsonaz.gov |
| 07/26/2017 | ANDREW CONNOR | LANDSCAPE | REVIEW | Approved | |
| 07/26/2017 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
| 07/27/2017 | KELLY LEE | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
| 07/27/2017 | MARTIN BROWN | COT NON-DSD | FIRE | Approved |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 08/04/2017 | KROBLES1 | OUT TO CUSTOMER | Completed |