Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S17-006
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/15/2017 | MMENDIB1 | START | PLANS SUBMITTED | Completed | |
03/16/2017 | KLEE1 | PIMA COUNTY | WASTEWATER | Reqs Change | March 15, 2017 To: Warren Thompson, P.E. Stantec Consulting Services Inc. Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department From: _______________________________________________ Debbie Ketchem, Civil Engineer Assistant - Sr. Development Liaison Unit Subject: Review Letter - sewer elements only Final Plat - 1st Submittal, P17WS00017 (S17-006) _______________________________________________________________________ Pima County Regional Wastewater Reclamation Department (PCRWRD) received this Final Plat on March 13, 2017. The following revisions are requested: 1. Verify all the lots that are being replatted. It appears lots 172, 173 & 174 are not within the boundaries of this project. 2. What is the correct name for the "Common Area"? The Title Block and Dedication identified it as "B". However, on page two (2) it is identified as "A". Correct appropriately. 3. Sheet two: There are five (5) labels that are not legible. Remove or lighten so the information is visible. The next submittal will be the 2nd submittal for this Final Plat. The RWRD review fee for the 2nd submittal will be $100.00 (Per PC Code, Title 13.20.030.A.2). Do not hesitate to contact me if you have any questions at (520) 724-6481. Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD Francisco Galindo, P.E., RWRD |
03/20/2017 | AHINES2 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | Letter provided in tentative plat reivew. |
03/20/2017 | AHINES2 | UTILITIES | SOUTHWEST GAS | Passed | Agency does not need to respond. For information only. |
03/21/2017 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Reqs Change | Good Morning, S17-006 Mountain Vail Estates Part B / 1st Submittal is being Returned for Corrections by Pima County Addressing. Please see the attached pdf for my comments. Thank you, Robin Freiman Addressing Official Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 Description: Description: cid:image001.png@01CE70DF.60625CC0 |
03/21/2017 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Reqs Change | Tucson Electric Power Co., (TEP) has reviewed the final plat submitted on March 20, 2017, and is unable to approve the plat at this time. An electrical design must be completed and TEP easements shown on the plat before TEP can approve. Please provide the signed letter approving the Equipment Placement that was emailed to Stantec on January 23, 2017, so that TEP may initiate the preliminary electrical design for the subdivision. If you have any questions, please feel free to contact me at 520-917-8744. Thanks, Mary Burke Right of Way Agent III Tucson Electric Power Co. Mail Stop HQE613 PO Box 711, Tucson, AZ 85702 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
03/22/2017 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Janice Wagner GIS Cartographer Pima County Assessor's Office DATE: March 22, 2017 RE: Assessor's Review and Comments Regarding: MOUNTAIN VAIL ESTATES PART B /S17-006 1ST SUBMITTAL FINAL PLAT _ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor's Office requirements. _______ Plat does not meet Assessor's Office requirements. NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
03/29/2017 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Principal Planner PROJECT: Mountain Vail Estates - Part B Final Plat (1st Review) S17-006 TRANSMITTAL DATE: March 29, 2017 DUE DATE: April 13, 2017 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above SECTION 2-07.0.0: FINAL PLAT, BLOCK PLAT, MINOR SUBDIVISION, AND CONDOMINIUM PLAT APPLICATIONS 1. 2-07.5.1.H Provide the final plat case number, S17-006, adjacent to the title block on all sheets. 1. 2-07.5.2.D General note 5 remove the reference to "C15-88-15" from the note as it is an annexation not a rezoning. 2. 2-07.5.2.J Provide a general note on the plan stating: "This subdivision is subject to Ordinance No.7106 which established zoning in the Arizona State Land No 2 area. 3. Until development package DP16-0220 is approved the final plat cannot be approved. Once the above comments are addressed Zoning is willing to provide an over the counter review. Call or email to schedule an appointment for this review. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
04/07/2017 | PAUL BAUGHMAN | ENGINEERING | REVIEW | Reqs Change | DATE: April 7, 2017 DUE DATE: April 13, 2017 SUBJECT: Final Plat TO: Warren Thompson, PE LOCATION: Mountain Vail Estates - Part B REVIEWERS: Paul Baughman, PE, CFM ACTIVITY: S17-006 SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed: 1) Per AM 2-07.5.4A, AM 2-07.5.4D and AM 2-07.5.5 please dimension the minimum radii in feet per figure 21 of TSM 10-01.9.0 such that it satisfies the minimum requirement of 50 foot radii. Please see previous comment 31 from last review of DP16-0220. 2) The Plat map has call outs for CA "A" where the title block and assurance forms list Common Area "B". Please be consistent. 3) Per AM 2-07.5.1H please list the assigned subdivision number for this subdivision S17-006 . If you have any comments, questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov. |
04/10/2017 | ALEXANDRA HINES | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All approved documents submitted previously 3) A disk containing all items submitted 4) All items requested by review staff 5) All items needed to approve these plans |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
04/17/2017 | MMENDIB1 | OUT TO CUSTOMER | Completed |