Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S16-044
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 06/07/2016 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
| 06/08/2016 | AHINES2 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Passed | Project not inTucson International Airport Aviagation Easement and Disclosure Area |
| 06/08/2016 | AHINES2 | PIMA COUNTY | WASTEWATER | Reqs Change | June 7, 2016 To: Kenneth Perry Perry Engineering Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department From: _______________________________________________ Debbie Ketchem, Civil Engineer Assistant - Sr. Development Liaison Unit Subject: Review Letter - sewer elements only 1st Avenue Self Storage II Final Plat - 1st Submittal, P16WS00044 (S16-044) Pima County Regional Wastewater Reclamation Department (RWRD) received this Final Plat and RWRD is requesting additional information for the above referenced submittal received on June 6, 2016. The following revisions are requested: 1. The Preliminary Sewer Layout (PSL) must be approved before the Final Plat can be approved. 2. A Type II Capacity Letter must be issued before the Final Plat can be approved. 3. Page one: In the Dedication add a new paragraph referencing "easements". For example, "We hereby grant to Pima County and all utility companies all public easements as shown hereon for the purpose of access for installation and maintenance of public sewers and utilities and other uses as designated by this plat". Modify as appropriate. 4. Page two: Show boundary of Easement Keynote 8 located near the east lot line of lot 2. There is not a detail for this sewer access easement. If Keynote 8 is not applicable in this location please remove. Easements shown on the Final Plat and the PSL must match. 5. Page two: Keynote 7; Replace Pima County Regional Wastewater Reclamation Department with "Pima County". 6. Page two: Keynote 8; Replace the word additional as "new", sewer easement as "sewer access easement", and Pima County Regional Wastewater Reclamation Department as "Pima County". The next submittal will be the 2nd submittal for this Final Plat. The RWRD review fee for the 2nd submittal will be $100.00 (Per PC Code, Title 13.20.030.A.2). Do not submit the revised Final Plat until the PSL has been accepted. Do not hesitate to contact me if you have any questions at (520) 724-6481. Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD Francisco Galindo, P.E., RWRD |
| 06/09/2016 | PGEHLEN1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | Letter obtained with DevPack valid thru 8/11/2017 |
| 06/10/2016 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 240 N. Stone Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: City of Tucson City Development Review Committee Planning and Development Services FROM: Suzanne Gilpin GIS Cartographer Pima County Assessor's Office (520)724-4387 DATE: June 9, 2016 RE: Assessor's Review and Comments Regarding S16-044- 1st AVENUE SELF STORAGE II-FINAL PLAT * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor's Office requirements. ______ Plat does not meet Assessor's Office requirements. COMMENTS: NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
| 06/17/2016 | AHINES2 | UTILITIES | SOUTHWEST GAS | Approved | See SWG Contact Information and Excavators Responsibilities in Associated Documents folder. June 17, 2016 City of Tucson CDRC Attn: Patricia Gehlen, Manager 201 N. Stone Avenue Tucson, AZ 85701 RE: SWG Plan Review for 1st Avenue Self Storage II Final Plat Development Plan Review - CDRC No. S16-044 Dear Ms. Gehlen: Southwest Gas Corporation (SWG) has no objection to the development of the above-mentioned project. Existing natural gas facilities are located in adjacent rights-of-way to the area of development and may be affected by construction of this project; specifically, an existing 4" gas main is located within the right-of-way of 1st Ave. and may be impacted by pavement saw cutting along the east edge of 1st Ave, along with driveway grading into development. In addition, an existing 2" gas main is located in the right of way of Foothills Drive. Blue Stake and potholing are suggested for best accuracy when locating SWG facilities. Please be aware that SWG requires a minimum one-foot separation from distribution facilities and any proposed structures and two-foot separation from high pressure gas facilities. SWG requests the contractor use caution when working in the vicinity of gas facilities and protect and support gas facilities per Blue Stake requirements. SWG also requests that no trees be planted within close proximity to gas facilities due to root intrusion; therefore, SWG requires all tree placements have a minimum eight-foot clearance from the tree center line to existing or proposed gas facilities. Shrubs and bushes may be planted within the eight-foot clearance zone. All information is provided for reference use only. Please note that it is the responsibility of excavators or those developers planning excavation to verify actual field conditions in advance of construction so that requests for gas service or any potential issues can be addressed in a timely manner, including payment for conflict mitigation if applicable. Please include SWG in all future development plan submittals of this project. If you have any questions or require any additional information, please contact me at (520) 794-6049 or TUCSWGDevReview@swgas.com. Sincerely, Shawn Stoner Engineering Technician Southern Arizona Division Enc: SWG Contact Information and Excavators Responsibilities (pdf) |
| 06/24/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Principal Planner PROJECT: 1st Avenue Self Storage II Final Plat (1st Review) S16-044 TRANSMITTAL DATE: June 27, 2016 DUE DATE: July 06, 2016 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). 1. 2-07.5.1.H - Place the plat case number, S16-044, adjacent to the title block on all sheets. 2. 2-07.5.1.H - Place the tentative plat case number, DP15-0117, adjacent to the title block on all sheets. 3. 2-07.5.3.E Clarify what the two lines of text located in the lower left hand corner of the plat are for. 4. 2-07.5.4.H Provide the sequence number for no access easement called out under easement keynote 6. 5. Provide the recordation information for the easement called out under easement keynote 3. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 06/27/2016 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approved | S16-044 1st Avenue Self Storage II Final Plat - 1st submittal is Approved by Pima County Addressing. Thank you, Robin Freiman Addressing Specialist Pima County Development Services Department 201 N Stone AV – 1st Floor Tucson, AZ 85701 (520) 724-7570 |
| 06/30/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Reqs Change | S16-044 1. Since the easement indicated by keynotes 5 and 8 on sheet 2 are created by this plat, the applicable dedication statement must be added to the plat. No vehicle access easements may also be included on the plat so no separate recordation would be required. 2. The assurances statement must be included on the plat. If all assurable items are completed no additional assurances will be required. If assurances will be provided, provide applicable notes on the plan. The beneficiary statement is required if a third-party land trust is used for assurances. If a trust is not used, remove this section. 3. Change the signature line for the PDSD Engineering Administrator to City of Tucson City Engineer. This is a temporary measure while PDSD has no engineering administrator. 4. Show retention and detention basins in a surveyable manner. |
| 07/06/2016 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Two rolled sets of the plans 2) All items requested by review staff 3) All items needed to approve this plan. A seperate submittal is required to RWRD prior to approval of the final plat. |
| 07/06/2016 | PGEHLEN1 | UTILITIES | CENTURYLINK | Passed | |
| 07/06/2016 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: 1ST AVENUE SELF STORAGE II FINAL PLAT S16-044 Tucson Electric Power Co., (TEP) has reviewed and approves the final plat submitted on June 8, 2016. Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument. Please contact me at 520-917-8744 should you have any questions. Thank you, Mary Burke Right of Way Agent Tucson Electric Power Co. Mail Stop HQE613 PO Box 711, Tucson, AZ 85702 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 07/18/2016 | RBENT1 | OUT TO CUSTOMER | Completed |