Plan Number: S16-040
Parcel: Unknown

Address:
415 S 6TH AV

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S16-040
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/02/2016 PGEHLEN1 START PLANS SUBMITTED Completed
08/05/2016 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change Office of the Pima County Assessor
240 N. Stone Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR

TO: City of Tucson-Development Services

FROM: Suzanne Gilpin
GIS Cartographer
Pima County Assessor's Office
(520)724-4387


DATE: August 5, 2016

RE: Assessor's Review and Comments Regarding S16-040-
GRADE SCHOOL (FINAL PLAT)


* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Plat meets Assessor's Office requirements.
__X___ Plat does not meet Assessor's Office requirements.


COMMENTS:

" There must be a Section Tie, with a bearing and dimension from the Section corner or Quarter corner to the Point of Tie on the subdivision.


" All adjacent subdivision should be named, with map and plat in the appropriate areas around the subdivision.

" Ownership must match plat prior to recording of the plat map.

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
08/08/2016 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approv-Cond Regional Traffic Engineering has one comment on this submittal; is 15th Street on the south boundary of the subdivision and not 5th Street as shown?

Beyond the comment above Regional Traffic has no other comments on this submittal and supports its acceptance, it will have no impact to any ADOT facilities. Thank you.
08/10/2016 ROBERT SHERRY PLUMBING-RESIDENTIAL REVIEW Completed
08/15/2016 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power (TEP) approves the 1st submittal of the final plat for S16-040 Grade School, Lots 1-7 submitted August 4, 2016.

If you have any questions, please contact me at 917-8745.

Liza Castillo
Right-of-Way Agent II,
Land Resources
Tucson Electric Power
& UNS Energy Corp.
520/917-8745 (o)
520/904-2668 (m)
lcastillo@tep.com
08/15/2016 JANE DUARTE COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are affected by this Final Plat.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation
(520) 837-8040
Howard.Dutt@tucsonaz.gov
08/15/2016 KAY MARKS PIMA COUNTY ADDRESSING Reqs Change See letter in Documents folder in Associated Documents and Folder button in PRO.

S16-040 Grade School, Lots 1-7 Final Plat / 1st Submittal is being Returned for Corrections by Pima County Addressing.

Please see the sticky notes in the attached pdf of the Final Plat.
I have also attached a Comment Summary for your use.

Please let me know if you have any questions.

Thank you,

Robin Freiman
Addressing Specialist
Pima County Development Services Department
201 N Stone AV – 1st Floor
Tucson, AZ 85701
(520) 724-7570
08/15/2016 AHINES2 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved August 15, 2016

JAS Engineering
PO Box 1888
Tucson, AZ 85702

Attn: Jeffrey A. Stanley

SUBJECT: Water Availability for project: 415 S. 6th Ave, APN: 117070360,
Case #: WA2030, T-14, R-13, SEC-13, Lots: 2, Location Code: TUC, Total Area: 1.4ac Zoning: HC-3

WATER SUPPLY
Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designation from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project.

WATER SERVICE
The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas.

Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs.

This letter shall be null and void two years from the date of issuance.

Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development.

If you have any questions, please call New Development at 791-4718.

Sincerely,

Richard A. Sarti, P.E.
Engineering Manager
Tucson Water Department

RS:ka
CC:File
08/16/2016 AHINES2 UTILITIES SOUTHWEST GAS Approved See letter in PRO.

August 16, 2016

City of Tucson CDRC
Attn: Patricia Gehlen, Manager
201 N. Stone Avenue
Tucson, AZ 85701


RE: SWG Plan Review for S16-040 Grade School, Lots 1-7 Final Plat / 1st Submittal


Dear Ms. Gehlen:

Southwest Gas Corporation (SWG) has no objection to the development of the above-mentioned project. Existing natural gas facilities are located in adjacent rights-of-way to the area of development and may be affected by construction of this project; specifically, an existing 2" gas main is located within the right-of-way of 6th Street, Arizona Ave, and 15th Street and may be impacted by pavement saw cutting and driveway grading into the development.

Blue Stake and potholing are suggested for best accuracy when locating SWG facilities. Please be aware that SWG requires a minimum one-foot separation from distribution facilities and any proposed structures and two-foot separation from high pressure gas facilities. SWG requests the contractor use caution when working in the vicinity of gas facilities and protect and support gas facilities per Blue Stake requirements.

SWG also requests that no trees be planted within close proximity to gas facilities due to root intrusion; therefore, SWG requires all tree placements have a minimum eight-foot clearance from the tree center line to existing or proposed gas facilities. Shrubs and bushes may be planted within the eight-foot clearance zone.

All information is provided for reference use only. Please note that it is the responsibility of excavators or those developers planning excavation to verify actual field conditions in advance of construction so that requests for gas service or any potential issues can be addressed in a timely manner, including payment for conflict mitigation if applicable.

Please include SWG in all future development plan submittals of this project. If you have any questions or require any additional information, please contact me at (520) 794-6409 or TUCSWGDevReview@swgas.com.

Sincerely,

Shawn Stoner
Engineering Technician
Southern Arizona Division

Enc: SWG Contact Information and Excavators Responsibilities (pdf)
08/16/2016 AHINES2 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Approv-Cond August 16, 2016

Dear Ms. Hines,

Thank you for the opportunity to comment on S16-040, Grade School, Lots 1-7; a final plat application for an approximately 1.38 acre site located on the southeast corner of East 14th Street and South 6th Avenue. The proposed land use is residential.

This site is within the Tucson International Airport avigation easement requirements and public disclosure area, FAA traffic pattern airspace, and FAA Part 77 airspace.

The applicant shall file Form 7460 with the FAA. Any cranes used for the project must also be identified with Form 7460. Please file Form 7460 at https://oeaaa.faa.gov/oeaaa/external/portal.jsp.

The Tucson Airport Authority conditionally approves the subject request contingent upon the following condition of approval, as noted below. This condition should be identified in the general notes of the approved development plan.

Conditions of approval:

"That prior to the City's approval of any construction permit for a permanent building, the property owner shall record the Avigation Easement prior to the subdivision process which discloses the existence, and operational characteristics of the Tucson International Airport to future owners or tenants of the property and further conveys the right to the public to lawfully use the airspace above the property. The content of such documents shall be according to the form and instructions provided."

"The developer shall provide the Airport Disclosure Statement form, at time of sale, to new property owners with new home purchases. The developer and the new home purchasers shall not record the Airport Disclosure Statement form. New home purchasers shall sign the Airport Disclosure Statement form and return a signed copy to Tucson Airport Authority. The content of such documents shall be according to the form and instructions provided."

The applicant shall forward a copy of the recorded Avigation Easement to:

Scott Robidoux
Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard
Suite 300
Tucson, AZ 85756

Once the proposed residential development is completed the developer shall provide the Airport Disclosure Statement form, at time of sale, to the new property owners with new home purchases. Non-residential uses do not need to be provided an Airport Disclosure Statement form. The new property owner shall forward a signed copy of the Airport Disclosure Statement form to:

Scott Robidoux
Airport Planner
Tucson Airport Authority
7250 South Tucson Boulevard
Suite 300
Tucson, AZ 85756

Please do not hesitate to contact me if you have any questions or concerns regarding this comment letter. I can be reached by email at srobidoux@flytucson.com or by telephone at 520-573-4811.

Respectfully,

Scott Robidoux,
Airport Planner

cc file
08/17/2016 AHINES2 ENV SVCS REVIEW Approved The City of Tucson - Environmental Services Department (ES) has completed our review of Project No. S16-040, Grade School, Lots 1-7. This project consists of a 7 lot single family residential subdivision.

APCs will be used to store refuse and recycle materials at each residence and will be rolled out to the curb on the day of servicing. The APCs will be screened from public view and adjacent developments while being stored at each residence.

Review of 6th Avenue, 14th Street and Arizona Avenue adjacent to the Grade School development shows that sufficient roadway width is provided to allow for refuse truck access to the APC locations. There are no unusual designs of the roadways, such as dead end streets or hammerhead street alignments, that would impede the maneuverability of the refuse trucks to service the APCs. The Grade School development is within the service area of ES in the City of Tucson.

In summary, the proposed Grade School residential subdivision plans are approved by ES from a solid waste standpoint.

Please contact me if there are any questions concerning this review.

Tom Ryan
City of Tucson - Environmental Services Department
08/17/2016 DAVID RIVERA ZONING HC REVIEW Approved
08/17/2016 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Steve Shields - Principal Planner
PDSD Zoning Review Section

PROJECT: Grade School - Lots 1-7
Final Plat (1st Review) 415 S. 6th Avenue - Zoning HC-3
S16-040

TRANSMITTAL DATE: August 17, 2016

DUE DATE: August 30, 2016

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program.


2-07.5.1.E.3 If the final plat is a resubdivision of a previously recorded plat, indicate the title and the book and page/sequence number reference of the existing subdivision.

1. COMMENT: Add the Word "Tucson" to the description in the title block. It should read "Tucson Lots…"


2-07.5.1.H The S(Year)-___ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

2. COMMENT: Add as reference the rezoning case number C9-74-19 next to the title block.


2-07.5.4.H. Show no-vehicular access easements where applicable;

3. COMMENT: If applicable, indicate on the plat where no-vehicular access easement are proposed.


2-07.5.6 Protective Covenants

Protective covenants or Covenants, Conditions, and Restrictions (CC&Rs) establishing responsibility for construction, maintenance, and ownership of any proposed common area, open space, private street, or similar joint use, when needed, will:
2-07.5.6.A. Provide for maintenance of and liability for any proposed commonly-owned areas; and

4. COMMENT: If applicable to this subdivision, provide copies of the CC&R's with the next submittal.

2-07.5.6.B. Include the various conditions of rezoning or other special situations requiring permanent administration by an owners' association. (Am. Admin. Directive, 5/14/2013)

5. COMMENT: If CC&R's are proposed for this subdivision, include language about the Historic Review that is required for any type of new construction, exterior remodeling of existing buildings, etc.

6. COMMENT: include with the next submittal a supplemental site plan with the zoning information related to the existing use(s), buildings and on-site parking depicted, dimension as required. Zoning requirements based on the current uses and building setbacks to the new property lines where applicable must meet current code requirements or DDO's or variances may be required.


7 Be aware that Additional zoning comments may be forthcoming based on the revisions, supplemental site plan, and responses to the zoning comments.


If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
08/17/2016 AHINES2 OTHER AGENCIES PIMA ASSN OF GOVTS Approved See letters in Document folder in Associated Document and Plans buttom in PRO

No objections/adverse comments.

Eric W. Kramer, Ph.D., AICP
Senior Land-Use Modeler

1 E. Broadway Blvd, Ste. 401
Tucson, AZ 85701
(520) 495-1455 (tel)
(520) 620-6981 (fax)
www.pagregion.com
ekramer@pagregion.com
08/23/2016 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: August 23, 2016
DUE DATE: August 30, 2016
SUBJECT: Minor Subdivision
TO: Jeff Stanley, PE
LOCATION: 415 S 6th Ave
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: S16-040
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) The legend shows a (C) for Calculated and (M) for measured dimension. Per AM 2-07.5.5C5 all distances and bearings between all monuments need to be indicated whether they are measured or calculated. Please update line work on the west side of lots 5 to 7 accordingly.
2) Per AM 2-07.5H please add the S16-040 to the title block areas on each sheet and to the Assurance documents.
3) Per AM 2-07.5.5C4b please show property pins to be set at the intersection of the property lines and the public street (ie. All property corners).
4) Per UDC Section 8.4.3 a grading plan is required to show where sidewalk, curb and other improvements related to improvements required to be constructed along South Arizona Avenue. Per TSM 10-01.6.1F please note that this is a named alley and as such is subject to the same requirements as a public street. Please contact TDOT by email to determine if any additional improvements are required along South Arizona Avenue with the 3 new proposed lots fronting this alley. Provide a copy of their response in the next submittal.
5) Per AM 2-07.5.1E2 please update the Range to read 13East instead of 14East.
If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov.
08/23/2016 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Completed PLANNING AND DEVELOPMENT SERVICES DEPARTMENT
COMMENTS

Regarding

SUBJECT: Community Design Review Committee Application

CASE NUMBER: CASE NAME: DATE SENT
S16-040 Grade School, Lots 1-7 08/23/2016

(X) Final Plat
(X) Development Plan
() Landscape Plan
() Revised Plan/Plat
() Board of Adjustment
() Other - Elevations



SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS:
() Approval
(X) Completed/Approval
(X) No Rezoning history on site - No Resubmittal Required:
() Tentative Plat
(X) Development Plan
() Landscape Plan
() Other














REVIEWER: MM DATE: 08/23/2016
COMMENTS
Plan Tucson on the Future Growth Scenario Map identifies the project site as existing neighborhoods. Existing neighborhoods are primarily developed and largely built-out residential neighborhoods and commercial districts in which minimal new development and redevelopment is expected in the next several decades. The goal is to maintain the character of these neighborhoods, while accommodating some new development and redevelopment and encouraging reinvestment and new services and amenities that contribute further to neighborhood stability. Site is addressed 415 S. 6th Avenue, and currently being reviewed for S16-040 Grade School, Lots 1-7 Final Plat. Site has no rezoning history or annexation conditions to monitor per Development Package Checklist, dated 05/27/2016, which indicates rezoning and/or annexation conditions do not apply. This is Historic Armory Park and has contributing structures on site. Any alterations to an existing building and new construction should come thru the HPZ design review process. Site is zoned HC-3.Site is in compliance with Plan Tucson.
08/24/2016 JIM EGAN COT NON-DSD FIRE Approved
08/29/2016 AHINES2 UTILITIES CENTURYLINK Passed
08/29/2016 ROBERT YOUNG PIMA COUNTY PIMA CTY - DEV REVIEW Passed
08/29/2016 AHINES2 UTILITIES EL PASO NATURAL GAS Passed
08/29/2016 AHINES2 OTHER AGENCIES U. S. POST OFFICE Passed
08/30/2016 AHINES2 PIMA COUNTY WASTEWATER Reqs Change August 30, 2016


To: Jeff Stanley, P.E.
JAS Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: _______________________________________________
Debbie Ketchem, Civil Engineer Assistant - Sr.
Development Liaison Unit
Subject: Review Letter - sewer elements only
Final Plat - 1st Submittal, P16WS00071 (S16-040)
Grade School, Lots 1-7

Pima County Regional Wastewater Reclamation Department (PCRWRD) received this Final Plat on August 19, 2016. The following revisions are requested:
1. Correct 5th Street to 15th Street.
2. RWRD's Type II Capacity Letter must be issued before the Final Plat can be approved.
3. This project requires a new public manhole to be built. A Sewer Improvement Plan (SIP) will need to be submitted and the appropriate fees paid for the review.

The next submittal will be the 2nd submittal for this Final Plat. The RWRD review fee for the 2nd submittal will be $0.00 (Per PC Code, Title 13.20.030.A.2). It is acceptable to send your corrected plans electronically to RWRDFP@pima.gov or Debbie.Ketchem@pima.gov.
Do not hesitate to contact me if you have any questions at (520) 724-6481.


Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD
Francisco Galindo, P.E., RWRD
08/31/2016 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change Ensure that all Zoning and Engineering comments and concerns are addressed prior to landscape approval of Final Plat.
08/31/2016 AHINES2 COT NON-DSD TUCSON POLICE DEPARTMENT Approved I have no issues.

Thank you,

Kara Curtis
Community Service Officer
Tucson Police Department
Operations Division Midtown
1100 S. Alvernon
Tucson, AZ 85711
kara.curtis@tucsonaz.gov
(520) 837-7428
09/01/2016 AHINES2 ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) A disk containing all items submitted
3) All items requested by review staff
4) All items needed to approve these plans
09/01/2016 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved

Final Status

Task End Date Reviewer's Name Type of Review Description
09/01/2016 RBENT2 OUT TO CUSTOMER Completed