Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S16-027
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S16-027
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/18/2016 ARUIZ1 START PLANS SUBMITTED Completed
05/24/2016 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved S16-027 / P16AD00130 Final Plat for Tucson Market Place Phase V/2nd review is APPROVED by Pima County Addressing in the format attached which included revisions to sheets 2, 3, 7, and 8.



Please find the attached Approved Project Notification form. To ensure timely addressing of this project, please submit the completed, attached, form and the Approved or Recorded plans to addressing@pima.gov. Addresses will be available on our website, http://web1.pima.gov/WebSearch?search=address, within approximately 5 business days after receipt of the required documentation. Please note, some subdivisions might appear on multiple days. Please email any questions to addressing@pima.gov.



Thank you,

Robin Freiman

Addressing Specialist

Pima County Development Services Department

201 N Stone AV – 1st Floor
Tucson, AZ 85701

(520) 724-7570

Description: Description: cid:image001.png@01CE70DF.60625CC0

Click here to search for Projects and Permits or to make a Payment

Click here to search for Septic Records
05/24/2016 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: TUCSON MARKETPLACE PHASE V

S16-027



Tucson Electric Power Co., has reviewed and approves the final plat for Tucson Marketplace Phase V submitted to TEP on 5-18-16, showing a requested label revision for TEP Easement Seq. No. 20131300082. A copy of the revised Sheet 3 is attached.



If you have any questions, please feel free to contact met at 520-917-8744.



Thank you,

Mary Burke

Right of Way Agent

Tucson Electric Power Co.

Mail Stop HQE613

PO Box 711, Tucson, AZ 85702

Office - 520-917-8744

Cell - 520-401-9895

mburke@tep.com
05/24/2016 DAVID RIVERA ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera for Steve Shields
PDSD Zoning Review

PROJECT: Tucson Marketplace - Phase 5
Final Plat (2nd Review)
S16-027

TRANSMITTAL DATE: May 23, 2016

DUE DATE: June 10, 2016

COMMENTS: Conditional Approval - Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

Additional plan review was done due to the addition of sheets four through eight.

2-07.5.4.B. Identify each block or lot within the subdivision boundary by number, and include the square footage of each;

1. COMMENT: Label the lot number "Lot 3" on sheet 4.


2-07.5.5.B. Indicate tract boundary lines; right-of-way and centerlines of streets, easements, and other rights-of-way; and property lines of residential lots and other sites, with accurate dimensions, bearings, or deflection angles and radii, arcs, and central angles of all curves.

2. COMMENT: List L3 info in the line table on sheet 4.
List the C16 curve data in the curve table on sheet 4.
List L21 info in the line table on sheet 6.
Curve C16 could not be verified on sheet 7. Curve C16 is on sheet four, add C16 to sheet four.





If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
05/27/2016 PAUL BAUGHMAN ENGINEERING REVIEW Approv-Cond The approval line on sheet 1 where it lists who filed the request to record this instrument, it should not say the "City of Tucson." This is where the applicant, the engineer, the developer or property owner's name or company name should go.

The signature line under assurances where it says "City of Tucson Planning and Development Services Department City Engineer" should be updated to simply say "City Engineer" The City Engineer does not work in Planning and Development Services. He is part of TDOT.
06/01/2016 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change Engineer will do electronic review for conditions of approval.

Final Status

Task End Date Reviewer's Name Type of Review Description
06/01/2016 PGEHLEN1 OUT TO CUSTOMER Passed