Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Plan Number: S16-027
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S16-027
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/14/2016 PGEHLEN1 START PLANS SUBMITTED Completed
03/15/2016 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved Approval letter issued for tentative plat still valid.
03/16/2016 ED ABRIGO PIMA COUNTY ASSESSOR Approved Please see attached for First Final Review Letter.

Thank you,
Janice Wagner

Office of the Pima County Assessor
240 N STONE AVENUE
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)



FROM: Janice Wagner
GIS Cartographer
Pima County Assessor's Office


DATE: March 15,2015


RE: Assessor's Review and Comments Regarding:
TUCSON MARKETPLACE-PHASE 5 1ST REVIEW OF FINAL PLAT/
S16-027


* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor's Office requirements.
_______ Plat does not meet Assessor's Office requirements.

COMMENTS:

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
03/16/2016 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Reqs Change Comments in PRO/SIRE
S16-027/Final Plat for Tucson Market Place Phase V/1st review returned for corrections, see attached sticky notes.
Thank you,


Mary Wright


Pima County Development Services
Building and Site Development
201 N Stone Av, 1st Floor
Tucson, Arizona 85701
(520) 724-6490


www.pima.gov/developmentservices
03/17/2016 ARUIZ1 PIMA COUNTY WASTEWATER Approved March 16, 2016

To: Benedict Bautista, RLS
Optimus Civil Design Group
c/o Lisa Bowers
Lisa@metroted.com

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department
From: _______________________________________________
Debbie Ketchem, Civil Engineer Assistant – Sr.
Development Liaison Unit
Subject: Approval Letter – sewer elements only
Final Plat – 1st Submittal, P16WS00024 (S16-027)


Pima County Regional Wastewater Reclamation Department (PCRWRD) hereby “Approves” Tucson Marketplace – Phase 5, Lots 9-11 as submitted on March 14, 2016. This approval is for elements related to the sewer system only.
Approval of the above referenced submittal does not authorize the construction of public or private sewer systems. Prior to the construction of such features, a Construction Authorization needs to be obtained from PDEQ.

Approval will need to be reobtained if the scope of the project changes that may impact the sewer. This also could include the language in the Dedication as well as easements for utilities/sewers. We request the applicant to contact RWRD-DLU to discuss what action if any shall be required. If the jurisdiction requires RWRD signature on the Mylar and there has been changes without communication it could delay the obtaining of RWRD’s signature.

Do not hesitate to contact me if you have any questions at (520) 724-6481.

Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD
Francisco Galindo, P.E., RWRD
03/21/2016 ARUIZ1 UTILITIES SOUTHWEST GAS Approved LETTERS IN SIRE/PRO
04/04/2016 PAUL BAUGHMAN ENGINEERING REVIEW Reqs Change DATE: April 4, 2016
DUE DATE: April 12, 2016
SUBJECT: Final Plat
TO: Benedict J. Bautista, RLS
LOCATION: 1500 E Tucson Market Place
REVIEWERS: Paul Baughman, PE, CFM
ACTIVITY: S16-027
SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed the proposed Development Plan Package. The following items need to be addressed:
1) Please update the Assurance signature line from "Planning and Development Services Engineering Administrator" to "City Engineer".
2) Per Section C.1.5 of the Bridges PAD (page 43), UDC 8.4.5A2, AM 2-07.6.1B and AM 2-09.3 please provide Assurances as required to assure completion of work described in AM 2-09.3.7B. Improvements of interest are related to infrastructure that adjacent parcels may intend to tie into, such as vehicular access, storm drainage and utilities.
3) Per AM 2-07.5.1H please add the relevant case number (S16-027) adjacent to the title block on each sheet.
4) Per AM 2-07.5.1A3 show line work for and label the railroad as part of the project location map.
5) Per AM 2-07.5.1A4 show the city's jurisdictional limits, if within the mapped area.
6) Per AM 2-07.5.1F the north arrow and scale should both be located in the upper right corner of each sheet.
7) Sheet 2 has sheet numbers called out that are not a part of this replat. Please remove sheet numbers for sheets not included in this replat.
8) Please fill in the recording data as to who is requesting the instrument to be filed for record.
9) Per AM 2-07.6.1E please submit two copies of an updated title report (current within 30 days). The easements shown on the title report should be reflected on the plat. Please modify general note 12 accordingly.
If you have any comments questions or wish to discuss new information, please call or email me at 520-837-5007 or paul.baughman@tucsonaz.gov
04/07/2016 STEVE SHIELDS ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Principal Planner

PROJECT: Tucson Marketplace - Phase 5
Final Plat (1st Review)
S16-027

TRANSMITTAL DATE: April 7, 2016

DUE DATE: April 12, 2016

COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed.

This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az

This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above


1. 2-07.5.1.H Provide the S16-027 subdivision case number in the lower right corner of the plat next to the title block.


2. 2-07.5.3.D The approval block should match the following, see AM 2-07.5.3.
D.

APPROVAL

"I, (fill in name of current City Clerk), Clerk of the City of Tucson, Arizona, hereby certify that this plat was approved by the Mayor and Council of the City of Tucson, Arizona, on this ____ day of __________, 20__."

____________________________________________ ______________
Clerk, City of Tucson Date

Sequence________________
Fee_____________________
State of Arizona
County of Pima
I hereby certify that the instrument
was filed for record at the request
Of__________________________
Date________________________
Time_________________________
Witness my hand and Official Seal
day and year above written.
F. ANN RODRIGUEZ, County Recorder
BY___________________________
Deputy




If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
04/11/2016 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change SEE SIRE/PRO FOR MENTIONED ATTACHMENTS.

SUBJECT: TUCSON MARKET PLACE PHASE V FINAL PLAT S16-027

Tucson Electric Power Co. (TEP) has reviewed the Final Plat for Tucson Market Place Phase V, submitted on March 29, 2016. TEP is unable to approve the plat at this time as there are additional TEP easements within the project area that must be shown on the plat. Please see the attached easement documents for inclusion in the plat. Also please review attached copy of the final plat showing additional TEP easement labeling.

Should there be any questions regarding this request for revisions, please contact me at 520-917-8744.

Thank you,

Mary Burke
Right of Way Agent
Tucson Electric Power Co.
Mail Stop HQE613
PO Box 711, Tucson, AZ 85702
Office - 520-917-8744
Cell - 520-401-9895
mburke@tep.com
04/12/2016 PGEHLEN1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Passed
04/12/2016 PGEHLEN1 UTILITIES CENTURYLINK Passed
04/12/2016 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Four rolled sets of the plans
2) A disk containing all items submitted
3) All items requested by review staff
4) All items needed to approve these plans

Final Status

Task End Date Reviewer's Name Type of Review Description
05/12/2016 ARUIZ1 OUT TO CUSTOMER Completed