Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S16-006
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/13/2016 | KROBLES1 | START | PLANS SUBMITTED | Completed | |
01/19/2016 | BVIESTE1 | PIMA COUNTY | WASTEWATER | Reqs Change | REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (520) 724-6500 DIRECTOR FAX: (520) 724-9365 January 19, 2016 To: Jeff Hunt, P.E. Cypress Civil Development Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department From: ________________________________________________ Debbie Ketchem, Civil Engineer Assistant - Sr. Development Liaison Unit Subject: Broadway Festival, Lots 1-3 Final Plat - 1st Submittal, P16WS00004 (S16-006) Response Letter Pima County Regional Wastewater Reclamation Department (RWRD) received this Final Plat and RWRD is requesting additional information for the above referenced submittal received on January 13, 2016. The following revisions are requested: 1. Tentative Plat must be approved before the Final Plat can be approved. If a Tentative Plat is not required by the City of Tucson provide the approved Development Plan demonstrating sewer service to each lot. 2. Final Plat must be signed by engineer of record and registered land surveyor before the Final Plat can be approved. 3. The Dedication states that Common Areas will be granted as easements to the public for installation of public sewer. The complete review of the Dedication shall be done on your next submittal after we have received the Tentative Plat / Development Plan. 4. Provide the sequence number for the existing 10' public utility easement. The next submittal will be the second submittal for this Final Plat. The RWRD review fee for the second submittal will be $50.00 (Per PC Code, Title 13.20.030.A.2). Do not hesitate to contact me if you have any questions at (520) 724-6481. Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD Francisco Galindo, P.E., RWRD |
01/19/2016 | BVIESTE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | April 28, 2014 Ina Road Group, LLC 5633 E. Grant Rd. Tucson, AZ 85712 Attn: Steve Shenitzer SUBJECT: Water Availability for project: Broadway Fesitval-5601 E Broadway, DP14-0064, C9-14-03 APN: 127121200, Case #: WA1566, T-14, R-14, SEC-12, Lots: 40, Location Code: TUC, Total Area: 1.9ac Zoning: C-1,R-3 WATER SUPPLY Tucson Water will provide water service to this project based on the subject zoning of the above parcels. Tucson Water has an assured water supply (AWS) designation from the State of Arizona Department of Water Resources (ADWR). An AWS designation means Tucson Water has met the criteria established by ADWR for demonstration of a 100-year water supply - it does not mean that water service is currently available to the subject project. WATER SERVICE The approval of water meter applications is subject to the current availability of water service at the time an application is received. The developer shall be required to submit a water master plan identifying, but not limited to: 1) Water Use; 2) Fire Flow Requirements; 3) Offsite/Onsite Water Facilities; 4) Loops and Proposed Connection Points to Existing Water System; and 5) Easements/Common Areas. Any specific area plan fees, protected main/facility fees and/or other needed facilities' cost, are to be paid by the developer. If the existing water system is not capable of meeting the requirements of the proposed development, the developer shall be financially responsible for modifying or enhancing the existing water system to meet those needs. This letter shall be null and void two years from the date of issuance. Issuance of this letter is not to be construed as agency approval of a water plan or as containing construction review comments relative to conflicts with existing water lines and the proposed development. If you have any questions, please call New Development at 791-4718. Sincerely, Scott Schladweiler, P.E. Engineering Manager Tucson Water Department SS:ka CC:File |
01/19/2016 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Janice Wagner GIS Cartographer Pima County Assessor's Office DATE: January 19, 2016 RE: Assessor's Review and Comments Regarding: FINAL PLAT FOR BROADWAY FESTIVAL LOTS 1 THROUGH 3 S16-006 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor's Office requirements. _______ Plat does not meet Assessor's Office requirements. COMMENTS: NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
01/19/2016 | KAY MARKS | PIMA COUNTY | ADDRESSING | Approved | The above plat has been Approved by Pima County Addressing on 01/19/16. (Label Project # S16-006 on plan) |
01/22/2016 | BVIESTE1 | UTILITIES | SOUTHWEST GAS | Approved | See additional comments in PRO. |
01/22/2016 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Approved | Regional Traffic Engineering has no comments on this submittal and supports its acceptance since it will not affect and ADOT facilities. Thank you. |
01/28/2016 | JOE LINVILLE | LANDSCAPE | REVIEW | Reqs Change | The following is applicable to the proposed lots subject to the plans approved as part of Case DP14-0064: 7.6.8. MAINTENANCE All required landscaping, irrigation systems, walls, screening devices, curbing, and detention basin landscape improvements on the site or within the abutting right-of-way shall be maintained as shown on the approved plans. The property owner is responsible for proper maintenance to achieve permanent, safe, and successful landscaping as required by this section. Failure to maintain the improvements or landscaping required by this section constitutes a violation of the UDC. UDC 7.12. Easements shall be provided for utilities, vehicular and pedestrian access, drainage, and other purposes as required by the appropriate utility agency, review agency, or City department. In order to install and maintain the landscape, irrigation, and screening elements as shown on the approved plans and the rezoning case, a landscape easement across the lots should be provided. |
01/28/2016 | ROBERT SHERRY | PLUMBING-RESIDENTIAL | REVIEW | Passed | |
02/02/2016 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
02/08/2016 | STEVE SHIELDS | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Broadway Festival Final Plat (1st Review) S16-006 TRANSMITTAL DATE: February 8, 2016 DUE DATE: February 11, 2016 COMMENTS: Please resubmit revised drawings along a detailed response letter, which states how all Zoning Review Section comments were addressed. This plan has been reviewed for compliance with the Unified Development Code (UDC) Administrative Manual (AM) Section 2-07. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC) and the UDC Technical Standards Manual (TSM). The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. If you need to review the sections listed below click on the link or copy it in the address bar of your internet program. http://www.amlegal.com/nxt/gateway.dll/Arizona/tucson_az_udc/administrativemanual?f=templates$fn=default.htm$3.0$vid=amlegal:tucson_udc_az This link will take you directly to the section used for the standards review. The UDC & TSM requirements are in the Unified Development Code and can be viewed at the same web link as above SECTION 2-07.0.0: FINAL PLAT, BLOCK PLAT, MINOR SUBDIVISION, AND CONDOMINIUM PLAT APPLICATIONS Section 2-07.1.0 APPLICABILITY 2-07.2.0 APPLICATION SUBMITTAL REQUIREMENTS 2-07.3.0 SUBMITTAL TIMING 2-07.4.0 FORMAT REQUIREMENTS 2-07.5.0 CONTENT REQUIREMENTS 2-07.6.0 APPROVAL DOCUMENTS AND PROCEDURE 2-07.1.0 APPLICABILITY Final plats, block plats, minor subdivisions, and condominium plats shall be prepared according to the requirements provided below. Hereafter referred to as "plat" or "plats." A final plat serves as a survey document suitable for recordation of all or part of an approved tentative plat, if applicable. The final plat must conform to the approved tentative plat or site plan in lot configuration, design, and required conditions of development. The final plat, once approved, is recorded in the Pima County Recorder's Office. The final plat is kept on file and becomes part of the permanent record for the subject site. (Am. Admin. Directive, 5/14/2013) 2-07.2.0 APPLICATION SUBMITTAL REQUIREMENTS Plat application packets are available from the PDSD Department. Completed applications and accompanying materials are submitted to the PDSD. Incomplete or inaccurate applications will not be accepted, nor will any application in which the pre-application conference or neighborhood meeting requirements have not been met. Should an incomplete submittal be accepted for review, the applicant should be aware that, because of a lack of information, the review will take longer since comments cannot be finalized until after the resubmittal when the required information is provided. The types of documents and the specific number of copies required of each of the documents are on the PDSD website or may be obtained from the CDRC office. The following documents and information shall be submitted upon application: 2.1 Application Form A completed application signed by the property owner or authorized designee; 2.2 Plat A plat must be prepared to the format and content requirements described herein; and, 2.3 Fees Fees in accordance with Section 4-01.0.0, Development Review Fee Schedule. 2-07.3.0 SUBMITTAL TIMING Review of final plats is normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat. 2-07.5.0 CONTENT REQUIREMENTS 5.1 General 2-07.5.1.H The S(Year)-___ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 1. COMMENT: Provide the plat case number, S16-006, adjacent to the title block on each sheet. 2-07.5.2 General Notes The plat must include the following general notes. Additional notes specific to each project are required when pertinent. Fill in the blanks with the project-specific information. 2-07.5.2.D If the property is subject to conditions of rezoning, add the following note: "This plat is subject to the conditions of rezoning case number C9-__-__, unless superseded by a subsequent rezoning ordinance." 2. COMMENT: Provide a general note stating, "THIS PLAT IS SUBJECT TO THE CONDITIONS OF REZONING CASE NUMBER C9-14-03 UNLESS SUPERSEDED BY A SUBSEQUENT REZONING ORDINANCE". 2-07.5.3 Standard Paragraphs The plat must include the following statements, as applicable. All signatures must be in permanent, black, India ink and be accompanied by a notary signature and seal. 2-07.5.4 Proposed Subdivision Information Provide the following information on the plat: 2-07.5.4.A. Indicate the name and width of each street, alley, easement (type), and drainage way within the subdivision boundary being created by this plat. Label each as public or private, along with the appropriate dedication notation; 3. COMMENT: There is an "EXISTING 10' PUBLIC UTILITY EASEMENT PER SEQ. _______ & A EXISTING 15' X 15' TRANSFORMER EASEMENT PER SEQ. _______" shown on the plat. If these are existing easements provide the recordation information on the plan. Additional Comments 4. COMMENT: A cross access/parking agreement is required for the proposed plat. Provide a copy of the recorded document with your next submittal. If you have any questions about this transmittal, please Steve Shields, (520) 837-4956 or Steve.Shields@tucsonaz.gov RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & recorded cross access/parking agreement. |
02/08/2016 | ZELIN CANCHOLA | COT NON-DSD | TUCSON POLICE DEPARTMENT | Approved | I have no issues. Kara Curtis Community Service Officer Tucson Police Department Operations Division Midtown 1100 S. Alvernon Tucson, AZ 85711 kara.curtis@tucsonaz.gov (520) 837-7428 >>> DSD_CDRC 1/15/2016 2:42 PM >>> Dear Reviewers: This is an electronic distribution for a CDRC Final Plat (Minor Subdivisoin) review. If you normally receive paper copies of the review documents, you will receive them soon. The applicable case numbers are: CDRC Development Plan: S16-006Existing and Proposed Zoning: C-1 & R-3 - rezoning to C-1 |
02/08/2016 | SSHIELD1 | ZONING HC | REVIEW | Passed | |
02/09/2016 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Reqs Change | SUBJECT: BROADWAY FESTIVAL S16-006 Tucson Electric Power Co., (TEP) has reviewed the final plat for Broadway Festival submitted January 15, 2016, and is unable to approve at this time. Please add the Sequence Number to the existing Public Utility Easement that is shown on the plat. If you have any questions, please contact me at 520-917-8744. Thank you, Mary Burke Right of Way Agent Tucson Electric Power Co. Mail Stop HQE613 PO Box 711, Tucson, AZ 85702 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
02/09/2016 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
02/09/2016 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
02/11/2016 | ARUIZ1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | |
02/11/2016 | ARUIZ1 | UTILITIES | EL PASO NATURAL GAS | Passed | |
02/11/2016 | JANE DUARTE | COT NON-DSD | PARKS & RECREATION | Approved | mailto:Howard.Dutt@tucsonaz.gov |
02/11/2016 | ARUIZ1 | UTILITIES | CENTURYLINK | Passed | |
02/11/2016 | ROBERT YOUNG | PIMA COUNTY | PIMA CTY - DEV REVIEW | Passed | |
02/11/2016 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Approved | PLANNING AND DEVELOPMENT SERVICES DEPARTMENT COMMENTS Regarding SUBJECT: Community Design Review Committee Application CASE NUMBER: CASE NAME: DATE SENT S16-006 Broadway Festival - Minor Subdivision 02/11/16 (X) Minor Subdivision () Development Plan () Landscape Plan () Revised Plan/Plat () Board of Adjustment () Other - Elevations SUBJECT DEVELOPMENT PLAN/PLAT HAS BEEN REVIEWED BY COMMUNITY PLANNING AND PRESERVATION, AND STAFF SUBMITS THE FOLLOWING COMMENTS: (X) Approval (X) No Resubmittal Required: () Tentative Plat () Development Plan () Landscape Plan () Other REVIEWER: msp DATE: 02/11/16 COMMENTS Plan Tucson on the Future Growth Scenario Map identifies the project site as Mixed-Use Corridor. Mixed-Use Corridors provide a higher - intensity mix of jobs, services, and housing along major streets. The businesses and residence within these corridors will be served by a mix of high - frequency transit options, as well as pedestrian and bicycle facilities. Site in compliance with Plan Tucson, as outlined below: Site was rezoned, C9-14-03, Broadway Festival - Lenora Avenue, from R-3 and C-1 to C-1, as approved by Mayor and Council on June 9, 2015, adopted by Ordinance 11274 on June 9, 2015. |
02/11/2016 | ARUIZ1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Passed | |
02/12/2016 | PGEHLEN1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Approved | No objections/adverse comments. -------------------------------------------------------------------------------- Disclaimer: This report and/or data was funded in part through grant[s] from the Federal Highway Administration and/or Federal Transit Administration, U.S. Department of Transportation. The contents of this report and/or data reflect the views and opinions of the author(s) who is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily state or reflect the official views or policies of the U.S. Department of Transportation, the Arizona Department of Transportation, or any other State or Federal Agency. This report and/or data does not constitute a standard, specification or regulation. The information in this publication is provided on an “as is” basis, and there are no warranties, express or implied, including, but not limited to, any warranties of merchantability or fitness for a particular purpose. In no event shall PAG be liable for any damages resulting from the use of the information. PAG provides the information in good faith and has endeavored to create and maintain accurate data. The users of this report and/or data are advised to use the information with caution and to independently verify accuracy. ____________________________ Eric W. Kramer, Ph.D., AICP Senior Land-Use Modeler 1 E. Broadway Blvd, Ste. 401 Tucson, AZ 85701 (520) 495-1455 (tel) (520) 620-6981 (fax) www.pagregion.com ekramer@pagregion.com |
02/16/2016 | ARUIZ1 | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 4 rolled sets of the plans All items requested by staff All items needed to approve the plans |
02/16/2016 | ARUIZ1 | ENV SVCS | REVIEW | Approved | Patricia, The City of Tucson - Environmental Services Department (ES) has completed our initial review of the Development Package Application materials for the proposed retail complex facility to be located at 5601 E. Broadway Boulevard in Tucson. The subject parcel consists of 1.9 acres of land and will be rezoned to C-1. The proposed retail complex will consist of two retail stores. The applicant for this site is Metro Tucson Expediting & Development. The proposed site will be served by ES which will provide refuse and recycling containers and collection of solid waste from this parcel. Access to the subject site for solid waste collection can be provided from Broadway Boulevard on the south, Leonora Avenue on the east and from 10th Street on the north side of the subject parcel. ES does not anticipate any issues with accessing the 5601 E. Broadway Boulevard parcel for collection of solid waste. Conventional waste containers for refuse and recycling materials can be properly located on the subject parcel. There are no issues associated with waste container use or storage on the subject site. Based on this analysis, ES approves the Development Package Application materials for the proposed retail development at 5601 E. Broadway Boulevard, Tucson, Arizona from a solid waste storage and collection standpoint. Please contact me if there are any questions concerning this review. Thomas G. Ryan, P. E. City of Tucson - Environmental Services Department |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
02/26/2016 | KROBLES1 | OUT TO CUSTOMER | Completed |