Plan Number: S15-038
Parcel: Unknown

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S15-038
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
08/05/2015 AROMERO4 START PLANS SUBMITTED Completed
08/10/2015 PGEHLEN1 PIMA COUNTY WASTEWATER Approved REGIONAL WASTEWATER RECLAMATION DEPARTMENT
201 NORTH STONE AVENUE
TUCSON, ARIZONA 85701-1207
JACKSON JENKINS PH: (520) 724-6500
DIRECTOR FAX: (520) 724-9365


August 6, 2015


To: Chuck Martin
Rick Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department
From: Francisco Galindo, P.E., Civil Engineer
RWRD, Development Liaison Unit
Subject: 2699 E. Valencia Road, Lots A & B
Final Plat - 1st Submittal, P15WS00006 (S15-038), Approval Letter



Pima County Regional Wastewater Reclamation Department (PCRWRD) hereby "Approves" the above referenced submittal of the Final Plat received on August 5, 2015.
Do not hesitate to contact me if you have any questions at (520) 724-6733.




Francisco Galindo, P.E. Civil Engineer
Development Liaison Unit


Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD
Debbie Ketchem, RWRD
Project file
08/10/2015 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved Regional Traffic Engineering has no comment on the final plat submittal and supports its acceptance. Thank you.


--------------------------------------------------------------------------------
08/12/2015 PGEHLEN1 UTILITIES SOUTHWEST GAS Approved See additional documents in PRO

August 12, 2015


City of Tucson CDRC
Attn: Patricia Gehlen, Manager
201 N. Stone Avenue
Tucson, AZ 85701

RE: SWG Plan Review for 2699 E. Valencia Rd - Final Plat
CDRC No. S15-038

Dear Ms. Gehlen:

Southwest Gas Corporation (SWG) has no objection to the development of the above-mentioned project. Existing natural gas facilities are located within the area of development and may be affected by construction of this project; specifically, existing 1" gas services are located within Lot "B" of the proposed development. In addition, an existing 2" gas main is located in the right-of-way of Valencia Road for future extension into the proposed development.

Blue Stake and potholing are suggested for best accuracy when locating SWG facilities. Please be aware that SWG requires a minimum one-foot separation from distribution facilities and any proposed structures and two-foot separation from high pressure gas facilities. SWG requests the contractor use caution when working in the vicinity of gas facilities and protect and support gas facilities per Blue Stake requirements.

SWG also requests that no trees be planted within close proximity to gas facilities due to root intrusion; therefore, SWG requires all tree placements have a minimum eight-foot clearance from the tree center line to existing or proposed gas facilities. Shrubs and bushes may be planted within the eight-foot clearance zone.

All information is provided for reference use only. Please note that it is the responsibility of excavators or those developers planning excavation to verify actual field conditions in advance of construction so that requests for gas service or any potential issues can be addressed in a timely manner.

Please include SWG in all future plat and development plan submittals of this project. If you have any questions or require any additional information, please contact me at (520) 794-6218 or TUCSWGDevReview@swgas.com.

Sincerely,



Arthur Lason
Engineering Technician
Southern Arizona Division


Enc: SWG Contact Information (pdf)
08/12/2015 ED ABRIGO PIMA COUNTY ASSESSOR Reqs Change Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)



FROM: Ada Griffin
GIS Cartographer
Pima County Assessor's Office


DATE: August 10, 2015


RE: Assessor's Review and Comments Regarding:

S15-038 2699 E VALENCIA RD FINAL PLAT

_

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Plat meets Assessor's Office requirements.
___X___ Plat does not meet Assessor's Office requirements.

COMMENTS:



" THE PERIMETER LINE MUST BE SOLID AND HEAVIEST LINE WEIGHT ON THE PLAT. THE LOT LINES AND COMMON AREA LINES MUST BE SOLID AND THE NEXT HEAVIEST.


" ALL ADJACENT SUBDIVISIONS SHOULD BE NAMED, WITH MAP AND PLAT IN THE APPROPRIATE AREAS AROUND THE SUBDIVISION.



NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
08/12/2015 KAY MARKS PIMA COUNTY ADDRESSING Reqs Change MICHELENE NOWAKADDRESSING REVIEW
PH #: 724-9512


TO:
CITY PLANNING
FROM:
MICHELENE NOWAK, ADDRESSING REVIEW

SUBJECT:
S15-038 2699 E VALENCIA ROAD/TENTATIVE PLAT-1ST REVIEW

DATE:
August 12, 2015








The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:


1.Label Project# S15-038 on all Sheets2.On all Sheets (Title Block and Plat Plan) correct the Lots to numbers—Lot A correct to Lot 1; Lot B correct to Lot 23.On Sheet 2, correct references on notes for 5’ easement to Lot 1 and 20’ easement to Lot 2
08/14/2015 DAVID RIVERA ZONING REVIEW Reqs Change CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: David Rivera
Principal Planner

PROJECT: S15-038
2699 E Valencia Road
Final Plat - Lots A and B

TRANSMITTAL DATE: August 17, 2015

DUE DATE: September 1, 2015

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Unified Development Code and Development Standards were addressed.

This plan has been reviewed for compliance with the Administrative Manual Standards listed in section 2-07 of the City of Tucson Administrative Manual. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC).

The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed.

Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site Final Plat that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A Final Plat application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 3, 2016

2-07.5.1.A - A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information:

2-07.5.1.A.4 - The city's jurisdictional limits, if within the mapped area.

01. COMMENT: Draw and label the jurisdictional limits.

2-07.5.1.E - Provide a title block in the lower right corner of each sheet with the following information:

2-07.5.1.E.1 - Subdivision name; number of blocks, lots, and/or units; and common area;

02. COMMENT: Add the name of the subdivision in the title Block of final plat sheets.

2-07.5.1.H - The S(Year)-___ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.

03. COMMENT: This project has been assigned the PDSD Final plat case number S15-038. List the case number in the lower right corner of both plan sheets.


If you have any questions about this transmittal, please call David Rivera, (520) 791-5608.
08/17/2015 PGEHLEN1 COT NON-DSD TUCSON POLICE DEPARTMENT Approved I have no issues with this proposal.


CSO Becky Noel #37968
Tucson Police Dept.
1100 S. Alvernon
Tucson, AZ 85711
520-837-7428

>>> DSD_CDRC 8/5/2015 11:35 AM >>>

Dear Reviewers: This is an electronic distribution for a CDRC Final Plat (Minor Subdivisoin) review. If you normally receive paper copies of the review documents, you will receive them soon. The applicable case numbers are: CDRC Development Plan: S15-038
Existing and Proposed Zoning:
Proposed Use: Commercial subdivisionDue Date: August 31, 2015
08/19/2015 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: 2699 E. VALENCIA ROAD LOTS A AND B - FINAL PLAT
S15-038


Tucson Electric Power Co. (TEP) has reviewed and approved the Final Plat for 2699 E. Valencia Road Lots A and B submitted on August 5, 2015.


Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve the new development. If easements are required, they will be secured by separate instrument. Your plans should be sent to:

Tucson Electric Power Company
Attn: Richard Harrison
New Business Project Manager
PO Box 711– OH-204
Tucson, AZ 85702
520-917-8726


Should you have any questions, please contact me at 520-917-8744.


Thank you,


Mary Burke
Right of Way Agent
Tucson Electric Power Co.
Mail Stop HQE613
PO Box 711, Tucson, AZ 85702
Office - 520-917-8744
Cell - 520-401-9895
mburke@tep.com
08/21/2015 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
08/26/2015 BVIESTE1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved See additional document in PRO.
08/27/2015 JIM EGAN COT NON-DSD FIRE Approved
08/31/2015 BVIESTE1 UTILITIES EL PASO NATURAL GAS Passed
08/31/2015 BVIESTE1 OTHER AGENCIES U. S. POST OFFICE Passed
08/31/2015 BVIESTE1 UTILITIES CENTURYLINK Passed
08/31/2015 DAVID RIVERA ZONING HC REVIEW Passed
08/31/2015 ROBERT YOUNG PIMA COUNTY PIMA CTY - DEV REVIEW Passed
09/01/2015 LOREN MAKUS ENGINEERING REVIEW Approved
09/01/2015 JANE DUARTE COT NON-DSD PARKS & RECREATION Approved No existing or proposed Tucson Parks and Recreation facilities are impacted by this Plat.

Howard B. Dutt, RLA
Landscape Architect
Tucson Parks & Recreation
(520) 837-8040
Howard.Dutt@tucsonaz.gov
09/01/2015 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change Ensure that all Zoning and Engineering comments and concerns are addressed
09/01/2015 BVIESTE1 OTHER AGENCIES PIMA ASSN OF GOVTS Approved See additional documents in PRO.

No objections/adverse comments. See attached.
09/01/2015 BVIESTE1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Reqs Change See additional document in PRO:

Here is our response. Let me know if you have any questions.


Thanks
Mike




Mike Smejkal, PE, CM
Senior Director of Development Services
Tucson Airport Authority
7005 South Plumer Avenue
Tucson, AZ 85756
Office (520) 573-4856
Cell (520) 419-3621
Fax (520) 573-8006
msmejkal@flytucson.com
09/01/2015 ROBERT SHERRY PLUMBING-RESIDENTIAL REVIEW Completed
09/02/2015 PGEHLEN1 ENV SVCS REVIEW Approved The Plat has been reviewed on behalf of the Environmental Services Dept. and is approved. If there are any questions, I can be reached at kperry@perryengineering.net
09/02/2015 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items"

1) Two rolled sets of the plans
2) A disk containing all items submitted
3) All items requested by review staff
4) All items needed to approve this plan

Final Status

Task End Date Reviewer's Name Type of Review Description
10/30/2015 KROBLES1 OUT TO CUSTOMER Completed