Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S15-038
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/05/2015 | AROMERO4 | START | PLANS SUBMITTED | Completed | |
| 08/10/2015 | PGEHLEN1 | PIMA COUNTY | WASTEWATER | Approved | REGIONAL WASTEWATER RECLAMATION DEPARTMENT 201 NORTH STONE AVENUE TUCSON, ARIZONA 85701-1207 JACKSON JENKINS PH: (520) 724-6500 DIRECTOR FAX: (520) 724-9365 August 6, 2015 To: Chuck Martin Rick Engineering Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department From: Francisco Galindo, P.E., Civil Engineer RWRD, Development Liaison Unit Subject: 2699 E. Valencia Road, Lots A & B Final Plat - 1st Submittal, P15WS00006 (S15-038), Approval Letter Pima County Regional Wastewater Reclamation Department (PCRWRD) hereby "Approves" the above referenced submittal of the Final Plat received on August 5, 2015. Do not hesitate to contact me if you have any questions at (520) 724-6733. Francisco Galindo, P.E. Civil Engineer Development Liaison Unit Cc: Lorenzo Hernandez, P.E., C.E. Manager., RWRD Debbie Ketchem, RWRD Project file |
| 08/10/2015 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Approved | Regional Traffic Engineering has no comment on the final plat submittal and supports its acceptance. Thank you. -------------------------------------------------------------------------------- |
| 08/12/2015 | PGEHLEN1 | UTILITIES | SOUTHWEST GAS | Approved | See additional documents in PRO August 12, 2015 City of Tucson CDRC Attn: Patricia Gehlen, Manager 201 N. Stone Avenue Tucson, AZ 85701 RE: SWG Plan Review for 2699 E. Valencia Rd - Final Plat CDRC No. S15-038 Dear Ms. Gehlen: Southwest Gas Corporation (SWG) has no objection to the development of the above-mentioned project. Existing natural gas facilities are located within the area of development and may be affected by construction of this project; specifically, existing 1" gas services are located within Lot "B" of the proposed development. In addition, an existing 2" gas main is located in the right-of-way of Valencia Road for future extension into the proposed development. Blue Stake and potholing are suggested for best accuracy when locating SWG facilities. Please be aware that SWG requires a minimum one-foot separation from distribution facilities and any proposed structures and two-foot separation from high pressure gas facilities. SWG requests the contractor use caution when working in the vicinity of gas facilities and protect and support gas facilities per Blue Stake requirements. SWG also requests that no trees be planted within close proximity to gas facilities due to root intrusion; therefore, SWG requires all tree placements have a minimum eight-foot clearance from the tree center line to existing or proposed gas facilities. Shrubs and bushes may be planted within the eight-foot clearance zone. All information is provided for reference use only. Please note that it is the responsibility of excavators or those developers planning excavation to verify actual field conditions in advance of construction so that requests for gas service or any potential issues can be addressed in a timely manner. Please include SWG in all future plat and development plan submittals of this project. If you have any questions or require any additional information, please contact me at (520) 794-6218 or TUCSWGDevReview@swgas.com. Sincerely, Arthur Lason Engineering Technician Southern Arizona Division Enc: SWG Contact Information (pdf) |
| 08/12/2015 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Reqs Change | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Ada Griffin GIS Cartographer Pima County Assessor's Office DATE: August 10, 2015 RE: Assessor's Review and Comments Regarding: S15-038 2699 E VALENCIA RD FINAL PLAT _ * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Plat meets Assessor's Office requirements. ___X___ Plat does not meet Assessor's Office requirements. COMMENTS: " THE PERIMETER LINE MUST BE SOLID AND HEAVIEST LINE WEIGHT ON THE PLAT. THE LOT LINES AND COMMON AREA LINES MUST BE SOLID AND THE NEXT HEAVIEST. " ALL ADJACENT SUBDIVISIONS SHOULD BE NAMED, WITH MAP AND PLAT IN THE APPROPRIATE AREAS AROUND THE SUBDIVISION. NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
| 08/12/2015 | KAY MARKS | PIMA COUNTY | ADDRESSING | Reqs Change | MICHELENE NOWAKADDRESSING REVIEW PH #: 724-9512 TO: CITY PLANNING FROM: MICHELENE NOWAK, ADDRESSING REVIEW SUBJECT: S15-038 2699 E VALENCIA ROAD/TENTATIVE PLAT-1ST REVIEW DATE: August 12, 2015 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval: 1.Label Project# S15-038 on all Sheets2.On all Sheets (Title Block and Plat Plan) correct the Lots to numbers—Lot A correct to Lot 1; Lot B correct to Lot 23.On Sheet 2, correct references on notes for 5’ easement to Lot 1 and 20’ easement to Lot 2 |
| 08/14/2015 | DAVID RIVERA | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: David Rivera Principal Planner PROJECT: S15-038 2699 E Valencia Road Final Plat - Lots A and B TRANSMITTAL DATE: August 17, 2015 DUE DATE: September 1, 2015 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Unified Development Code and Development Standards were addressed. This plan has been reviewed for compliance with the Administrative Manual Standards listed in section 2-07 of the City of Tucson Administrative Manual. Also compliance with applicable development criteria for the proposed use as listed in the City of Tucson Uniform Development Code (UDC). The review comments include the actual standard first with the applicable Administrative Manual section number and the following paragraph is the actual comment related to the specific item that must be addressed. Section 3.3.3.G.5.c UDC, An applicant has one year from the date of application to obtain approval of a site Final Plat that complies with zoning and other development requirements in effect at the time of application, unless an ordinance adopted by Mayor and Council during this period states otherwise. A Final Plat application that has been in review for a period of one year and has not yet been approved is considered denied. To continue the review of a site plan for the property, a new site plan must be submitted that complies with regulations in effect at the time of re-submittal. The new submittal initiates a new one-year review period. One year Expiration date is August 3, 2016 2-07.5.1.A - A project-location map must be drawn in the upper right corner of the first sheet of the plat at a scale of three inches equals one mile and include the following information: 2-07.5.1.A.4 - The city's jurisdictional limits, if within the mapped area. 01. COMMENT: Draw and label the jurisdictional limits. 2-07.5.1.E - Provide a title block in the lower right corner of each sheet with the following information: 2-07.5.1.E.1 - Subdivision name; number of blocks, lots, and/or units; and common area; 02. COMMENT: Add the name of the subdivision in the title Block of final plat sheets. 2-07.5.1.H - The S(Year)-___ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also. 03. COMMENT: This project has been assigned the PDSD Final plat case number S15-038. List the case number in the lower right corner of both plan sheets. If you have any questions about this transmittal, please call David Rivera, (520) 791-5608. |
| 08/17/2015 | PGEHLEN1 | COT NON-DSD | TUCSON POLICE DEPARTMENT | Approved | I have no issues with this proposal. CSO Becky Noel #37968 Tucson Police Dept. 1100 S. Alvernon Tucson, AZ 85711 520-837-7428 >>> DSD_CDRC 8/5/2015 11:35 AM >>> Dear Reviewers: This is an electronic distribution for a CDRC Final Plat (Minor Subdivisoin) review. If you normally receive paper copies of the review documents, you will receive them soon. The applicable case numbers are: CDRC Development Plan: S15-038 Existing and Proposed Zoning: Proposed Use: Commercial subdivisionDue Date: August 31, 2015 |
| 08/19/2015 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: 2699 E. VALENCIA ROAD LOTS A AND B - FINAL PLAT S15-038 Tucson Electric Power Co. (TEP) has reviewed and approved the Final Plat for 2699 E. Valencia Road Lots A and B submitted on August 5, 2015. Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve the new development. If easements are required, they will be secured by separate instrument. Your plans should be sent to: Tucson Electric Power Company Attn: Richard Harrison New Business Project Manager PO Box 711– OH-204 Tucson, AZ 85702 520-917-8726 Should you have any questions, please contact me at 520-917-8744. Thank you, Mary Burke Right of Way Agent Tucson Electric Power Co. Mail Stop HQE613 PO Box 711, Tucson, AZ 85702 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
| 08/21/2015 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
| 08/26/2015 | BVIESTE1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | See additional document in PRO. |
| 08/27/2015 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
| 08/31/2015 | BVIESTE1 | UTILITIES | EL PASO NATURAL GAS | Passed | |
| 08/31/2015 | BVIESTE1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | |
| 08/31/2015 | BVIESTE1 | UTILITIES | CENTURYLINK | Passed | |
| 08/31/2015 | DAVID RIVERA | ZONING HC | REVIEW | Passed | |
| 08/31/2015 | ROBERT YOUNG | PIMA COUNTY | PIMA CTY - DEV REVIEW | Passed | |
| 09/01/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 09/01/2015 | JANE DUARTE | COT NON-DSD | PARKS & RECREATION | Approved | No existing or proposed Tucson Parks and Recreation facilities are impacted by this Plat. Howard B. Dutt, RLA Landscape Architect Tucson Parks & Recreation (520) 837-8040 Howard.Dutt@tucsonaz.gov |
| 09/01/2015 | ANDREW CONNOR | LANDSCAPE | REVIEW | Reqs Change | Ensure that all Zoning and Engineering comments and concerns are addressed |
| 09/01/2015 | BVIESTE1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Approved | See additional documents in PRO. No objections/adverse comments. See attached. |
| 09/01/2015 | BVIESTE1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Reqs Change | See additional document in PRO: Here is our response. Let me know if you have any questions. Thanks Mike Mike Smejkal, PE, CM Senior Director of Development Services Tucson Airport Authority 7005 South Plumer Avenue Tucson, AZ 85756 Office (520) 573-4856 Cell (520) 419-3621 Fax (520) 573-8006 msmejkal@flytucson.com |
| 09/01/2015 | ROBERT SHERRY | PLUMBING-RESIDENTIAL | REVIEW | Completed | |
| 09/02/2015 | PGEHLEN1 | ENV SVCS | REVIEW | Approved | The Plat has been reviewed on behalf of the Environmental Services Dept. and is approved. If there are any questions, I can be reached at kperry@perryengineering.net |
| 09/02/2015 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items" 1) Two rolled sets of the plans 2) A disk containing all items submitted 3) All items requested by review staff 4) All items needed to approve this plan |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 10/30/2015 | KROBLES1 | OUT TO CUSTOMER | Completed |