Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S15-027
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
08/27/2015 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
08/28/2015 | STEVE SHIELDS | ZONING | REVIEW | Approved | |
08/28/2015 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Approved | SUBJECT: TUCSON MARKETPLACE – PHASE 4 – FINAL PLAT S15-027 Tucson Electric Power Co. (TEP) has reviewed and approves the final plat for Tucson Marketplace Phase 4. Please call the New Construction Department at 520-918-8300 to apply for service. Submit a final set of approved plans including electrical load and offsite improvement plans to determine how TEP will serve this development. If easements are required, they will be obtained by separate instrument. Please contact me at 520-917-8744 should you have any questions. Thank you, Mary Burke Right of Way Agent Tucson Electric Power Co. Mail Stop HQE613 PO Box 711, Tucson, AZ 85702 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
09/11/2015 | ELIZABETH LEIBOLD | ENGINEERING | REVIEW | Approv-Cond | S15-027, TUCSON MARKETPLACE - PHASE 4 FINAL PLAT Reviewer: E Leibold P.E., CPM, CFM Date: 11SEP15 Engineering recommends conditional approval of this plat; there are no assurances for this project. It is recommended that the following comment be addressed at mylar submittal stage. (Ref: UDC Article 11, UDC 8.4.5, Admin Man Sec.2-07.5, Tech Man Sec.14.2.3.a-d): 1) Add the following maintenance note per Tech Man Sec.4-04.14.3.2(a)-(d): Owner or owners shall be solely responsible for operation, maintenance, and liability for drainage structures. Owner or owners shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for drainage facilities at least once each year, and that these regular inspection reports will be on file with owner for review by City staff, upon written request. City staff may periodically inspect drainage facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately. Owner or owners agree to reimburse City for any and all costs associated with maintaining drainage facilities, should City find owner or owners deficient in their obligation to adequately operate and maintain their facilities. Elizabeth Leibold, P.E., CPM, CFM Civil Engineer Engineering Division Development Services Department |
09/14/2015 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Approv-Cond | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES September 14, 2015 Jeff Behrana Optimus Civil Design Group LLC Subject: S15-027 Tucson Market Place - Phase 4 Final Plat Dear Jeff: The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make any necessary corrections and submit the following documents: 1 Executed Final Plat Double Matte Océ or Photo Mylar. 2 Title reports current within the last thirty (30) days. 1 Check made payable to "Pima County Recorder" in the amount of $20.00 per plat page plus a $4.00 handling fee, along with Consent to Dedicate and CC&R fees if applicable. Consent to Dedicate and CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page, if applicable. If the Consent to Dedicate is also a fixture filing, there is an additional $9 fee. If you are unsure of the fees, please call the County Recorders Office. 1 Original Set of Executed and notarized CC&R's document (if applicable) and Assurance Package (if applicable). 1 Copied Set of Executed and notarized CC&R's document (if applicable) and Assurance Package (if applicable). 1 CD with Digital Copy in PDF Format of Plat, CC&R's (if applicable) and Assurances (if applicable). Assurances (if applicable) must be reviewed by the City Attorney's Office prior to being presented to the Mayor and Council. Plats, CC&R's and assurances must be approved at the same Mayor and Council Meeting. Please expect 5-6 weeks from the date submitted to the date scheduled for Mayor and Council approval. Should you have any questions, please call me at (520) 837-4919. Sincerely, Patricia Gehlen Project Manager All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via Permits Plus and E-mail |
09/14/2015 | PGEHLEN1 | PIMA COUNTY | WASTEWATER | Passed | approved on first submittal |
09/14/2015 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approv-Cond | 201 N. STONE AV, 1ST FL TUCSON, AZ 85701-1207 MICHELENE NOWAKADDRESSING REVIEW PH #: 721-9512 TO: CITY PLANNING FROM: MICHELENE NOWAK, ADDRESSING REVIEW SUBJECT: S15-027 TUCSON MARKETPLACE-PHASE 4 LOTS 1-9/FINAL PLAT-2ND REVIEW DATE: SEPTEMBER 1, 2015 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. NOTE: ON SHEET 12 CORRECT SHEET REFERENCE: MATCH LINE ON THE NORTH TO SHEET 9 AND SHEET 10 1.) Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar of approved Final Plat to City Planning ***PIMA COUNTY ADDRESSING MUST RECEIVE A COPY OF THE RECORDED FINAL PLAT PRIOR TO THE ASSIGNMENT OF ANY ADDRESSES. PLEASE COORDINATE THE DELIVERY AND RECORDATION OF THE MYLAR WITH THE CITY OF TUCSON PLANNING*** 2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection. ***The Pima County Addressing Section can use digital CAD drawing files. These CAD files can be e-mailed to: CADsubmittals@pima.gov The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** |
Final Status
Task End Date | Reviewer's Name | Type of Review | Description |
---|---|---|---|
09/25/2015 | AROMERO4 | OUT TO CUSTOMER | Completed |