Plan Review Detail
Review Status: Completed
Review Details: LOT SPLIT REVIEW
Plan Number - S15-021
Review Name: LOT SPLIT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/07/2015 | MSTPAUL1 | START | PLANS BEING WALKED THRU | Completed | |
| 07/07/2015 | MICHAEL ST. PAUL | ZONING | REVIEW | Reqs Change | P&DS TRANSMITTAL FROM: Michael St.Paul, Planning Technician PROJECT: S15-021 923 South 3rd Avenue Lot split TRANSMITTAL: July 7, 2015 COMMENTS: the following comments are relative to an application for a Design Development Option (DDO) (UDC 3.11.1). This site is located in the R-2 zone (UDC 4.7.9). A single-family residence (SFR) is a permitted use in this zone (Table 4.8-2). See Use-Specific Standards 4.9.7.B.5 - 9. 10. The minimum setback is the greater of six (6) feet, or two-thirds (2/3) the height of the structure's wall facing each interior property line (Table 6.3-2.A). The height of the existing wall for the SFR facing the proposed south property line is twelve (12) feet, six (6) inches. The required setback is eight (8) feet, four (4) inches. The proposed setback is seven (7) feet. |
| 09/10/2015 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 09/11/2015 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Completed | |
| 09/11/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Completed | |
| 09/15/2015 | EGALLET1 | ZONING-RECORDATION | REVIEW | Needs Review | |
| 09/15/2015 | MICHAEL ST. PAUL | H/C SITE | REVIEW | Passed |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 09/15/2015 | EGALLET1 | OUT TO CUSTOMER | Completed |