Plan Review Detail
Review Status: Completed
Review Details: LOT SPLIT REVIEW
Plan Number - S14-058
Review Name: LOT SPLIT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/22/2015 | FERNE RODRIGUEZ | START | PLANS BEING WALKED THRU | Completed | |
| 09/22/2015 | PATRICIA GEHLEN | ZONING | REVIEW | Reqs Change | 1) All easements, legal descriptions, and CC&R's must be recorded priro to final approval. 2) Add the lot area for each new lot created to the site plan 3) Per UDC 8.7.3.J.5 the open same must be accessible to those that are nonambulatory. Please demonstrate compliance. 4) Please provide documentation that both units were inspected and finaled by PDSD. Patricia Gehlen 837-4919 |
| 09/25/2015 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 10/19/2015 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Reqs Change | 1. Comment not resolved. Revise the lot split drawing to show the water service, gas service, and electrical service to each building along with the building sewers on the two lots. [Initial comment: Show all of the utility services for each dwelling and identify the dwelling served by each service.] 2. Explain how the two proposed utility easements identified on the drawing are to be accessible without causing possible structural damage to the existing structures built over the proposed easements (e.g. the existing residence in parcel A and the carport with the 1-hour fire wall). [Initial comment: Revise the site drawing to include utility easements needed to maintain the building sewer, water service, and gas service.] |
| 10/20/2015 | CLAYTON TREVILLYAN | BUILDING-RESIDENTIAL | REVIEW | Reqs Change | Previous comment #1 requesting the location of utilities and meters must still be addressed. The meters have been shown but the location of the respective service lines has not been identified. Please indicate the location of all utility service lines. |
| 10/21/2015 | PATRICIA GEHLEN | ZONING-RECORDATION | REVIEW | Needs Review |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 12/11/2015 | PGEHLEN1 | APPROVAL SHELF | Completed |
| 12/11/2015 | PGEHLEN1 | REJECT SHELF | Completed |
| 12/11/2015 | PGEHLEN1 | OUT TO CUSTOMER | Completed |