Plan Number: S14-015
Parcel: Unknown

Address:
6730 S TUCSON BL

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S14-015
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/07/2014 AROMERO4 START PLANS SUBMITTED Completed
05/08/2014 JIM EGAN COT NON-DSD FIRE Approved
05/09/2014 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved Regional Traffic Engineering has no comments on this submittal and supports its approval. Thank you.



--------------------------------------------------------------------------------

Confidentiality and Nondisclosure Notice: This email transmission and any attachments are intended for use by the person(s)/entity(ies) named above and may contain confidential/privileged information. Any unauthorized use, disclosure or distribution is strictly prohibited. If you are not the intended recipient, please contact the sender by email, and delete or destroy all copies plus attachments.
.
05/09/2014 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved See letter in PRO
05/12/2014 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Passed
05/16/2014 MICHAEL ST. PAUL ZONING REVIEW Reqs Change CDRC TRANSMITTAL


FROM: Michael St Paul Planning Technician

PROJECT:
S14-015
6730 South Tucson Boulevard
Minor Subdivision


TRANSMITTAL: May 16, 2014


COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Unified Development Code (Section 8.4.1) and the Administrative Manual (Section 2-07) were addressed.


The consultants attend a pre-submittal meeting and the final plat for a minor subdivision was approved for submittal on April 4, 2013 (UDC 8.4.1.C).

"A final plat shall be approved and recorded within three years of the tentative plat approval date. A final plat is subject only to the ordinances in effect at the time of the tentative plat application except where an ordinance specifically states that it applies to pending applications" (UDC Section 8.5.2.A Final Plat Approval Period).

"The S(Year)-____ subdivision case number assigned to the approved tentative plat must be placed in the lower right corner of the plat next to the title block" (AM 2-07.5.1.H).

1) Place the subdivision case number (S14-015) in the lower right corner next to the title block of each sheet.

Provide the following standard paragraphs:

2) Provide the full Certification of Survey statement as quoted below, followed by the printed names, seals and signatures (AM 2-07.5.3.A).

"I hereby certify that the boundary survey as shown on this plat was performed under my direction and that all existing or proposed survey monuments and markers shown are correctly described. I further certify that this plat was prepared under my direction."

3) Identify the Certification of Title as quoted in (AM 2-07.5.3.B.1) under its own title and paragraph, followed by the printed name and signature:

4) Provide the utility access dedication as quoted below (AM 2-07.5.3.B.2.b) on the cover sheet under dedications:

"(I/We) herby grant to the public and all utility companies all easements as shown hereon for the purposes of access for installation and maintenance of public sewers and utilities and other uses designated by this plat."

5) Provide the following wording in the middle of the Approval and Recording Data Blocks (AN 2-07.5.3.D):

"I hereby certify that the instrument was filed for record at the request"

6) Provide the Assurances Block, titled as Assurances (AM 2-07.5.3.E) as quoted:

"This is to certify that all improvements, such as streets, sidewalks, sewers, water and utility installation, drainage and flood control facilities, and monuments, required by the City of Tucson have been completed or the future completion of such improvements has been assured by a land trust financial assurance agreement, the posting of performance bonds, an escrow account, letter of credit, or other security as the City of Tucson deems necessary and proper. In the event that any such assurance expires, lapses or is otherwise inadequate to assure the completion of assurable infrastructure, the city may suspend the issuance of building permits or certificates of occupancy."

7) The frame on the cover page of the Covenants, Conditions and Restrictions continues throughout the document on all the pages. You should fix that.


RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Final Plat for the Minor Subdivision plat and any requested documents.

Submit the revised plans, CC&Rs, with a comment letter.

If there are any question, please contact me at Michael.StPaul@tucsonaz.gov or 520 837 4959.
05/20/2014 PGEHLEN1 UTILITIES SOUTHWEST GAS Approved See documents in SIRE
05/20/2014 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)



FROM: Susan King
GIS Cartographer
Pima County Assessor's Office


DATE: May 16, 2014


RE: Assessor's Review and Comments Regarding Final Plat
S14-015 6730 S. Tucson Boulevard

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor's Office requirements.
_______ Plat does not meet Assessor's Office requirements.

COMMENTS: Thank you for your submittal.

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
05/21/2014 PGEHLEN1 OTHER AGENCIES PIMA ASSN OF GOVTS Approved No objections/ adverse comments.




--------------------------------------------------------------------------------

Disclaimer: This report and/or data was funded in part through grant[s] from the Federal Highway Administration and/or Federal Transit Administration, U.S. Department of Transportation. The contents of this report and/or data reflect the views and opinions of the author(s) who is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily state or reflect the official views or policies of the U.S. Department of Transportation, the Arizona Department of Transportation, or any other State or Federal Agency. This report and/or data does not constitute a standard, specification or regulation. The information in this publication is provided on an “as is” basis, and there are no warranties, express or implied, including, but not limited to, any warranties of merchantability or fitness for a particular purpose. In no event shall PAG be liable for any damages resulting from the use of the information. PAG provides the information in good faith and has endeavored to create and maintain accurate data. The users of this report and/or data are advised to use the information with caution and to independently verify accuracy.

____________________________

Eric W. Kramer, Ph.D., AICP

Senior Land-Use Modeler







1 E. Broadway Blvd, Ste. 401

Tucson, AZ 85701

(520) 792-1093 x4455 (tel)

(520) 620-6981 (fax)

www.pagregion.com

ekramer@pagregion.com
05/22/2014 ROBERT SHERRY PLUMBING-RESIDENTIAL REVIEW Passed
05/29/2014 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: 6730 S. TUCSON BLVD – FINAL PLAT

S14-015



Tucson Electric Power Co. (TEP) has reviewed and approves the Final Plat for 6730 S. Tucson Blvd., Lots 1-4 submitted May 8, 2014.



Costs for removal or relocation of existing TEP facilities will be billable to the developer. TEP easements for electrical facilities to serve any new development will be obtained by separate instrument.



Should there be any questions, please contact me at 917-8744.



Thank you,



Mary Burke

Right of Way Agent

Tucson Electric Power Co.

Mail Stop HQW603

PO Box 711, Tucson, AZ 85702

Office - 520-917-8744

Cell - 520-401-9895

mburke@tep.com
05/30/2014 RONALD BROWN ZONING HC REVIEW Passed
06/02/2014 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 06/05/2014,

SUBJECT: 6730 S Tucson Boulevard, Lots 1-4 and Common Areas "A" and "B"
S14-015, T15S, R14E, SECTION 17

RECEIVED: Final Plat and CC & R's on May 07, 2014

The subject project has been reviewed. We offer the following comments. Prepare a detailed response that explains the revisions that were made and references the exact location on the Final Plat and CC & R's where the revisions were made:

Final Plat:

1. Provide the complete new S14- 015 number, in the lower right corner next to the title block on every sheet (A.M. 2-07.5.1.H).
2. The Surveyor Certification is incomplete. It is missing the last statement "I further certify that this plat was prepared under my direction." Complete the Certification as required by AM 2-07.5.3.A.
3. The "Dedication" does not follow the format provided in A.M.2-07.5.3.B. Revise as required.
4. Include the Utility Easements language in the "Dedication" (A.M.2-07.5.3.B).
5. The "Assurances" does not follow the format provided in A.M.2-07.5.3.B. Revise as required.
6. Label the basis of bearing on the plat and provide the tie between the basis of bearing and one of the subject parcel corner monuments as required by A.M. 2-07.5.5.A. and A.M. 2-07.5.5.C.
7. Indicate the width of all easements as required by A.M. 2-07.5.5.A.
8. It is not clear if the recordation page number (i.e. DKT 2484, Page 139) for the existing Natural Gas Easement, shown on Lot #3, is incorrect or it needs to be added to the Title Report. Verify and revise as needed.
9. Show, if applicable, the detention/retention areas (within the common areas) in a surveyable and readily retraceable manner (A.M. 2-07.5.4.I).
10. In order to expedite the plat review and approval, provide the boundary survey and closure calculations report in accordance with D.S. 2-03.6.5.C.3.

CC & R's

1. Remove the rectangle that shows in the middle of the page on every sheet.
2. The site area is slightly different from the area shown on the Final Plat. Revise as necessary.
3. It is not clear if there are onsite drainage facilities that need to be included in the document for maintenance responsibility purposes. Clarify.

If there are any questions, please contact me at Laith.Alshami@tucsonaz.gov or 837-4933.

RESUBMITTAL REQUIRED: Revised Final Plat and CC & R's
06/02/2014 ZELIN CANCHOLA COT NON-DSD TRAFFIC Approved
06/03/2014 KAY MARKS PIMA COUNTY ADDRESSING Reqs Change 201 N. STONE AV, 1ST FL

TUCSON, AZ 85701-1207





MICHELENE NOWAK
ADDRESSING REVIEW

PH #: 724-9512



TO:
CITY PLANNING
FROM:
MICHELENE NOWAK, ADDRESSING REVIEW

SUBJECT:
S14-015 6730 S TUCSON BOULEVARD LOTS 1-4 FINAL PLAT/1ST REVIEW

DATE:
MAY 21, 2014








The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:



1. Label project number #S14-015 on all Sheets



2. Label Lots 1-4 with a “star” for vehicular access for proper Addressing
06/04/2014 PGEHLEN1 COT NON-DSD TUCSON POLICE DEPARTMENT Approved I have no issues with this request.
06/05/2014 PGEHLEN1 ENV SVCS REVIEW Approved The plat has been reviewed on behalf of Environmental Services and is approved. If there are any questions, I can be reached at kperry@perryengineering.net
06/05/2014 JANE DUARTE COT NON-DSD PARKS & RECREATION Passed
06/05/2014 JOE LINVILLE LANDSCAPE REVIEW Approved
06/06/2014 PGEHLEN1 OTHER AGENCIES U. S. POST OFFICE Passed
06/06/2014 PGEHLEN1 UTILITIES EL PASO NATURAL GAS Passed
06/06/2014 ROBERT YOUNG PIMA COUNTY PIMA CTY - DEV REVIEW Passed
06/06/2014 PGEHLEN1 UTILITIES CENTURYLINK Passed
06/09/2014 PGEHLEN1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Passed Per Jorden Feld.
06/09/2014 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. The following items must be resubmitted:

1) Two sets of the rolled plans
2) A disk containing all items submitted
3) All items requested by review staff
4) All items needed to approve this plan.
06/09/2014 PGEHLEN1 PIMA COUNTY WASTEWATER Reqs Change Plat must be reviewed and approved by RWRD

Final Status

Task End Date Reviewer's Name Type of Review Description
06/11/2014 FERNE RODRIGUEZ OUT TO CUSTOMER Completed