Plan Number: S13-042
Parcel: Unknown

Address:
6500 E GRANT RD

Review Status: Completed

Review Details: RESUBMITTAL - MINOR SUBD REVIEW

Plan Number - S13-042
Review Name: RESUBMITTAL - MINOR SUBD REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
05/12/2014 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
05/19/2014 MICHAEL ST. PAUL ZONING REVIEW Reqs Change CDRC TRANSMITTAL


FROM: Michael St Paul Planning Technician

PROJECT:
S13-042
6500 West Grant Road
Block Plat (shopping center)


TRANSMITTAL: May 19, 2014


COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Unified Development Code (Section 8.4.1) and the Administrative Manual (Section 2-07) were addressed.


The consultants attend a pre-submittal meeting and the final plat for a minor subdivision was approved for submittal on October 10th of 2013 (UDC 8.4.1.C).

2-07.3.0 SUBMITTAL TIMING
"Review of final plats in normally initiated after the tentative plat has been approved, unless concurrent tentative and final plat submittal has been approved by the PDSD prior to submittal. Final plats may also be submitted for review prior to the approval of a tentative if a minimum of one review of the tentative plat have occurred. In any case, submittal of the final plat prior to approval of the tentative plat is done at the applicant's risk since changes could be required of the tentative that may affect the final plat."

"A final plat shall be approved and recorded within three years of the tentative plat approval date. A final plat is subject only to the ordinances in effect at the time of the tentative plat application except where an ordinance specifically states that it applies to pending applications" (UDC Section 8.5.2.A Final Plat Approval Period).

COMMENT:
This subdivision plat was submitted October 30th 2013. The final dated for approval is October 31st 2016.


"Place the words 'SEQ#_______' in both the upper and lower right corners outside the margin line. The blanks will be completed by the Pima County Recorder's Office at the time of recordation" (AM 2-07.5.1.D).

COMMENT:
Add "#___________" to the SEQ references you have provided outside the margin line.

ADDITIONAL INFORMATION:
Place the sequence number reference outside the margin in the upper right corner so that it reads from the right side of the sheets and provide the underline for both locations. (See green-lines.)

"Dedication Language. Use one (1) of the following four (4) statements as may be appropriate for the plat. Section 2-07.5.3.B.2.c may be used in subdivision with private elements. Section 2-07.5.3.B.2.d may be used where electrical facilities are not specifically located on common areas" (AM 2-07.5.3.B.2).

COMMENT:
The dedication statement should have reference to the "Declaration of Restrictions and Cross-Easement Agreement" with recording information on the plan. The cross-access and cross parking agreement needs to be revised to reflect the new configuration and ownership of the parcels of the shopping center (AM 2-07.5.3.B.2.c). The Taco Bell declarations do not appear to address all of the concerns reflected in the Declaration of Restrictions and Cross-Easement Agreement.

ADDITIONAL INFORMATION:
The CC&Rs must reflect the new subdivision configuration with cross access and cross parking. Access easements must be provided, either on the plat or within the CC&Rs.. There is no access, nor is there cross parking, for the new lot.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised Final Plat for the Minor Subdivision plat and any requested documents.

Provide the revised access and parking agreement, and if there are any changes to the plat, copies of the plat. Also provide the CDs.

If there are any question, please contact me at Michael.StPaul@tucsonaz.gov or 520 837 4959.
05/20/2014 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)



FROM: Susan King
GIS Cartographer
Pima County Assessor's Office


DATE: May 16, 2014


RE: Assessor's Review and Comments Regarding Final Plat
S13-042 Target at Tanque Verde Road and Grant Road

* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor's Office requirements.
___ ___ Plat does not meet Assessor's Office requirements.

COMMENTS:

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
Thank you for your submittal.
05/20/2014 PGEHLEN1 UTILITIES SOUTHWEST GAS Approved See documents in SIRE
05/27/2014 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Approved 201 N. STONE AV, 1ST FL

TUCSON, AZ 85701-1207







MICHELENE NOWAK
ADDRESSING REVIEW

PH #: 721-9512





TO:
CITY PLANNING
FROM:
MICHELENE NOWAK, ADDRESSING REVIEW

SUBJECT:
S13-042 TARGET AT TANQUE VERDE ROAD AND GRANT ROAD, LOT 1, LOT 2/FINAL PLAT-2ND REVIEW

DATE:
MAY 23, 2014






The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.



1.) Submit a 24 x 36 Reverse Reading Double Matte Photo Mylar or bond paper of approved Final Plat to City Planning.



***PIMA COUNTY ADDRESSING MUST RECEIVE A COPY OF THE RECORDED FINAL PLAT PRIOR TO THE ASSIGNMENT OF ANY ADDRESSES. PLEASE COORDINATE THE DELIVERY AND RECORDATION OF THE MYLAR WITH THE CITY OF TUCSON***



2.) All addresses will need to be displayed per Pima County Address Standards at the time of final inspection.





***The Pima County Addressing Section can use digital CAD drawing files.

The CAD files can be e-mailed to: CADsubmittals@pima.gov

The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.***
05/27/2014 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved SUBJECT: TARGET AT TANQUE VERDE AND GRANT RD – FINAL PLAT

S13-042



Tucson Electric Power Co. (TEP) has reviewed and approves the Final Plat for Target at Tanque Verde and Grant Road date stamped 5/21/14.

Costs for removal or relocation of existing electrical facilities, if required, will be billable to the developer. Should additional easements be required for new development within the platted area, they will be obtained by separate instrument.



If you have any questions, please feel free to contact me at 917-8744.



Thank you,



Mary Burke

Right of Way Agent

Tucson Electric Power Co.

Mail Stop HQW603

PO Box 711, Tucson, AZ 85702

Office - 520-917-8744

Cell - 520-401-9895

mburke@tep.com
06/05/2014 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 06/05/2014,

SUBJECT: Target at Tanque Verde Road and Grant Road
S13-042, T14S, R15E, SECTIONS 06

RECEIVED: Final Plat and Drainage Report on May 12, 2014

The subject submittal has been reviewed. The submittal can not be approved at this time. Address the following comments before review can continue. Prepare a detailed response that explains the revisions that were made and references the exact location on the Final Plat where the revisions were made:

Final Plat

1. Provide a site plan that shows all existing culture and grades (existing contours are acceptable) (UDC 8.4.1.A).
2. The language in the "Dedication" should reference the "Public" instead of "Pima County" (A.M. 2-07.5.3.B).
3. The cross-access easement shall be addressed on this plat and it should be referenced in the CC & R's document. Additionally, revise the dedication language accordingly (A.M. 2-07.5.5.B).
4. Dimension all existing and proposed easements (A.M. 2-07.5.4.A) and (A.M. 2-07.5.5.B).
5. Show, if applicable, any proposed no-vehicular access easements (A.M. 2-07.5.4.H).
6. Show detention/retention basin in a surveyable and readily retractable manner (A.M. 2-07.5.4.I).

RESUBMITTAL REQUIRED: Revised Final Plat and Site Plan
06/05/2014 ANDREW CONNOR LANDSCAPE REVIEW Reqs Change Ensure that all Zoning & Engineering comments and concerns are addressed prior Landscape approval.
06/09/2014 PATRICIA GEHLEN ZONING-RECORDATION REVIEW Reqs Change
06/09/2014 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Reqs Change This review has been completed and resubmittal is required. Please resubmit the following items:

1) Two rolled sets of the plans
2) All items requested by review staff
3) All items needed to approve this plan

Final Status

Task End Date Reviewer's Name Type of Review Description
09/17/2014 CPIERCE1 REJECT SHELF Completed