Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S12-056
Parcel: Unknown

Address:
2604 E LEE ST

Review Status: Completed

Review Details: MINOR SUBDIVISION REVIEW

Plan Number - S12-056
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/08/2013 JOSE ORTIZ COT NON-DSD TRAFFIC Approved
01/08/2013 STEVE SHIELDS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Granite House
S12-056 (1st Review)
Final Plat

TRANSMITTAL DATE: January 9, 2013


COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. An applicant has one (1) year from the date of approval of tentative plat to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. This final plat must be approved and recorded on or before December 20, 2013

2. D.S. 2-03.6.1.H.3 As this is a resubdivision of a previously recorded plat, indicated the title and the book and page of the existing subdivision within the title block..

3. D.S. 2-03.6.1.K Provide the S12-056 subdivision case number in the lower right corner of the plat next to the title block on all sheets. Remove the reference to S12-040 from all sheets.

4. D.S. 2-03.6.1K Remove the lot split reference "S12-040" from all sheets. This lot split number will need to be canceled.


If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C\planning\cdrc\finaplat\s12-056fp.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat.
01/08/2013 TOM MARTINEZ OTHER AGENCIES AZ DEPT TRANSPORTATION Approved Regional Traffic Engineering has no comments on this submittal and suggests is approval. The development will have no effect on ADOT facilities due to the location within the City. Thank you.
01/14/2013 PGEHLEN1 OTHER AGENCIES PIMA ASSN OF GOVTS Approved No objections/ adverse comments. See attached

See additional paperwork in SIRE



____________________________

Eric W. Kramer, Ph.D., AICP

Senior Land-Use Modeler

PAG_logotype

177 N. Church Ave, Suite 405

Tucson, AZ 85701

(520) 792-1093 x506 (tel)

(520) 620-6981 (fax)

www.pagnet.org

<mailto:ekramer@pagnet.org> ekramer@pagnet.org
01/15/2013 PGEHLEN1 COT NON-DSD TUCSON POLICE DEPARTMENT Approved I have no issues with this request.

CSO Becky Noel #37968
Tucson Police Dept
837-7428
01/15/2013 RONALD BROWN ZONING HC REVIEW Approved
01/17/2013 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Passed
01/17/2013 JIM EGAN COT NON-DSD FIRE Approved
01/17/2013 JOE LINVILLE LANDSCAPE REVIEW Approved
01/17/2013 JANE DUARTE COT NON-DSD PARKS & RECREATION Passed
01/18/2013 PAUL MACHADO ENGINEERING REVIEW Denied To: Patricia Gehlen DATE: January 22, 2013
CDRC/Zoning Manager

SUBJECT: Granite House 2604 E. Lee St.
Final Plat S12-056 (First Review)
T14S, R14E, Section 05

RESUBMITTAL REQUIRED: Final Plat.

The Final Plat (FP) cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Final Plat:

1. Please include a response letter to the comments along with the corrected copies of the FP.
3. A title block with the following information is to be provided in the lower right corner of each sheet.
1. Subdivision name; number of blocks, lots, and/or units; and common area.
2. Legal description by section, township, and range.
3. If the final plat is a re-subdivision of a previously recorded plat, indicate the title and the book and page reference of the existing subdivision.
4. Indicate primary control points, or descriptions and ties to such control points, to which all dimensions, angles, bearings, and similar data on the plat will be referred. Where a coordinate system has been established by the City Engineer or County Engineer, primary control points may be referenced thereto. At least one (1) corner of the subdivision will be tied by course and distance to a section corner, a quarter section corner, or an established City or County survey monument. The plat must include a description of that corner marker and an indication of how the bearings were determined. Corner tie recordation information is to be provided on the plat.
5. Indicate tract boundary lines; right-of-way and centerlines of streets, easements, and other rights-of-way; and property lines of residential lots and other sites, with accurate dimensions, bearings, or deflection angles and radii, arcs, and central angles of all curves.
6. Additional details to be shown are as follows.
1. Basis of bearings - The purpose of the basis of bearings on a survey is to enable another surveyor to retrace the original survey. As such, the statement must be referenced to found, readily locatable monuments.
7. Submit a CD of the corrected Final Plat.
8. It is suggested that while my comments are being addressed or have been addressed, that you make an appointment/call/email me to discuss any of my comments that you may have questions on. If I missed any information or made a mistake, we can go over those items at the meeting, over the phone or through email. Do not hesitate to call if there are any questions or disagreements on my comments as you address them.

Drainage Statement:
1. A Drainage Statement is a brief description of drainage conditions applicable for a site which are not affected by 100 year flows of 100 cfs, of more……per S.M.D.D.F.M., chap. II, 2.1.2. The DS must be submitted along with the site plan and accepted with the approval of the grading plan.
2. The content and format of the Drainage Statement should follow S.M.D.D.F.M., chap. II, 2.2.
3. Show the project address or administration address on the cover sheet of the DS.


If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov
Paul P. Machado
Senior Engineering Associate
City of Tucson - Planning and Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4932 office
(520) 879-8010 fax
C:/2604 E. Lee St. FP
01/23/2013 ROBERT YOUNG PIMA COUNTY PIMA CTY - DEV REVIEW Passed
01/23/2013 PGEHLEN1 UTILITIES CENTURYLINK Passed
01/23/2013 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved
01/23/2013 PGEHLEN1 UTILITIES SOUTHWEST GAS Approved See comments in SIRE
01/23/2013 PGEHLEN1 OTHER AGENCIES TUCSON AIRPORT AUTHORITY Passed
01/23/2013 PGEHLEN1 UTILITIES EL PASO NATURAL GAS Passed
01/23/2013 PGEHLEN1 OTHER AGENCIES U. S. POST OFFICE Passed
01/23/2013 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied Review has been completed. Revisions are required. 4 rolled copies of the plans along with all other items requested by reviewers must be included in the resubmittal.
12/20/2012 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
12/21/2012 PGEHLEN1 PIMA COUNTY WASTEWATER Passed Per WWM form
12/21/2012 KAY MARKS PIMA COUNTY ADDRESSING Passed Per Addressing form
12/24/2012 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Passed Defer to Zoning
12/26/2012 PGEHLEN1 ENV SVCS REVIEW Approved Solid Waste Requirements are listed and ck'd off in the pre submittal for Minor Subdivision document. No comments are required at this time. Based on the plat it looks as though residential apc curbside service at Lee St will be requested. The plat is approved.







Jeff Drumm, P.E.
Environmental Manager
City of Tucson Environmental Services
520-837-3713
12/27/2012 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Sherry Hyde
Senior Property Technician
Pima County Assessor's Office


DATE: 12/26/12


RE: Assessor's Review and Comments Regarding
S12-056 GRANITE HOUSE FINAL PLAT


* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor's Office requirements.
_______ Plat does not meet Assessor's Office requirements.

COMMENTS: THANK YOU FOR YOUR SUBMITTAL.

NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
12/31/2012 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Reqs Change SUBJECT: A Granite House
S12-056

Tucson Electric Power Company (TEP) has received the Final Plat submitted for review December 21, 2012. TEP is unable to approve the plat at this time.

The completion of an electrical design is necessary to determine our easement requirements and conduct a review of the final plat. Additional plans are necessary for preparation of the design. Submit the AutoCAD version of the plat on a CD or email to me at mburke@tep.com<mailto:mburke@tep.com>.

If you have any questions, please feel free to contact me at 917-8744

Thank you,


Mary Burke
Right of Way Agent
Tucson Electric Power Co.
Mail Stop HQW603
PO Box 711, Tucson, AZ 85702
Office - 520-917-8744
Cell - 520-401-9895
mburke@tep.com

Final Status

Task End Date Reviewer's Name Type of Review Description
02/28/2013 FERNE RODRIGUEZ OUT TO CUSTOMER Completed