Plan Review Detail
Review Status: Completed
Review Details: MINOR SUBDIVISION REVIEW
Plan Number - S12-056
Review Name: MINOR SUBDIVISION REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/08/2013 | JOSE ORTIZ | COT NON-DSD | TRAFFIC | Approved | |
| 01/08/2013 | STEVE SHIELDS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: Granite House S12-056 (1st Review) Final Plat TRANSMITTAL DATE: January 9, 2013 COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed. 1. An applicant has one (1) year from the date of approval of tentative plat to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. This final plat must be approved and recorded on or before December 20, 2013 2. D.S. 2-03.6.1.H.3 As this is a resubdivision of a previously recorded plat, indicated the title and the book and page of the existing subdivision within the title block.. 3. D.S. 2-03.6.1.K Provide the S12-056 subdivision case number in the lower right corner of the plat next to the title block on all sheets. Remove the reference to S12-040 from all sheets. 4. D.S. 2-03.6.1K Remove the lot split reference "S12-040" from all sheets. This lot split number will need to be canceled. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 C\planning\cdrc\finaplat\s12-056fp.doc RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat. |
| 01/08/2013 | TOM MARTINEZ | OTHER AGENCIES | AZ DEPT TRANSPORTATION | Approved | Regional Traffic Engineering has no comments on this submittal and suggests is approval. The development will have no effect on ADOT facilities due to the location within the City. Thank you. |
| 01/14/2013 | PGEHLEN1 | OTHER AGENCIES | PIMA ASSN OF GOVTS | Approved | No objections/ adverse comments. See attached See additional paperwork in SIRE ____________________________ Eric W. Kramer, Ph.D., AICP Senior Land-Use Modeler PAG_logotype 177 N. Church Ave, Suite 405 Tucson, AZ 85701 (520) 792-1093 x506 (tel) (520) 620-6981 (fax) www.pagnet.org <mailto:ekramer@pagnet.org> ekramer@pagnet.org |
| 01/15/2013 | PGEHLEN1 | COT NON-DSD | TUCSON POLICE DEPARTMENT | Approved | I have no issues with this request. CSO Becky Noel #37968 Tucson Police Dept 837-7428 |
| 01/15/2013 | RONALD BROWN | ZONING HC | REVIEW | Approved | |
| 01/17/2013 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Passed | |
| 01/17/2013 | JIM EGAN | COT NON-DSD | FIRE | Approved | |
| 01/17/2013 | JOE LINVILLE | LANDSCAPE | REVIEW | Approved | |
| 01/17/2013 | JANE DUARTE | COT NON-DSD | PARKS & RECREATION | Passed | |
| 01/18/2013 | PAUL MACHADO | ENGINEERING | REVIEW | Denied | To: Patricia Gehlen DATE: January 22, 2013 CDRC/Zoning Manager SUBJECT: Granite House 2604 E. Lee St. Final Plat S12-056 (First Review) T14S, R14E, Section 05 RESUBMITTAL REQUIRED: Final Plat. The Final Plat (FP) cannot be approved as submitted. Please address the following review comments prior to the next submittal. Final Plat: 1. Please include a response letter to the comments along with the corrected copies of the FP. 3. A title block with the following information is to be provided in the lower right corner of each sheet. 1. Subdivision name; number of blocks, lots, and/or units; and common area. 2. Legal description by section, township, and range. 3. If the final plat is a re-subdivision of a previously recorded plat, indicate the title and the book and page reference of the existing subdivision. 4. Indicate primary control points, or descriptions and ties to such control points, to which all dimensions, angles, bearings, and similar data on the plat will be referred. Where a coordinate system has been established by the City Engineer or County Engineer, primary control points may be referenced thereto. At least one (1) corner of the subdivision will be tied by course and distance to a section corner, a quarter section corner, or an established City or County survey monument. The plat must include a description of that corner marker and an indication of how the bearings were determined. Corner tie recordation information is to be provided on the plat. 5. Indicate tract boundary lines; right-of-way and centerlines of streets, easements, and other rights-of-way; and property lines of residential lots and other sites, with accurate dimensions, bearings, or deflection angles and radii, arcs, and central angles of all curves. 6. Additional details to be shown are as follows. 1. Basis of bearings - The purpose of the basis of bearings on a survey is to enable another surveyor to retrace the original survey. As such, the statement must be referenced to found, readily locatable monuments. 7. Submit a CD of the corrected Final Plat. 8. It is suggested that while my comments are being addressed or have been addressed, that you make an appointment/call/email me to discuss any of my comments that you may have questions on. If I missed any information or made a mistake, we can go over those items at the meeting, over the phone or through email. Do not hesitate to call if there are any questions or disagreements on my comments as you address them. Drainage Statement: 1. A Drainage Statement is a brief description of drainage conditions applicable for a site which are not affected by 100 year flows of 100 cfs, of more……per S.M.D.D.F.M., chap. II, 2.1.2. The DS must be submitted along with the site plan and accepted with the approval of the grading plan. 2. The content and format of the Drainage Statement should follow S.M.D.D.F.M., chap. II, 2.2. 3. Show the project address or administration address on the cover sheet of the DS. If you have any questions, I can be reached at 837-4932 or Paul.Machado@tucsonaz.gov Paul P. Machado Senior Engineering Associate City of Tucson - Planning and Development Services Department 201 N. Stone Avenue P.O. Box 27210 Tucson, Arizona 85726-7210 (520) 837-4932 office (520) 879-8010 fax C:/2604 E. Lee St. FP |
| 01/23/2013 | ROBERT YOUNG | PIMA COUNTY | PIMA CTY - DEV REVIEW | Passed | |
| 01/23/2013 | PGEHLEN1 | UTILITIES | CENTURYLINK | Passed | |
| 01/23/2013 | PGEHLEN1 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | |
| 01/23/2013 | PGEHLEN1 | UTILITIES | SOUTHWEST GAS | Approved | See comments in SIRE |
| 01/23/2013 | PGEHLEN1 | OTHER AGENCIES | TUCSON AIRPORT AUTHORITY | Passed | |
| 01/23/2013 | PGEHLEN1 | UTILITIES | EL PASO NATURAL GAS | Passed | |
| 01/23/2013 | PGEHLEN1 | OTHER AGENCIES | U. S. POST OFFICE | Passed | |
| 01/23/2013 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Denied | Review has been completed. Revisions are required. 4 rolled copies of the plans along with all other items requested by reviewers must be included in the resubmittal. |
| 12/20/2012 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 12/21/2012 | PGEHLEN1 | PIMA COUNTY | WASTEWATER | Passed | Per WWM form |
| 12/21/2012 | KAY MARKS | PIMA COUNTY | ADDRESSING | Passed | Per Addressing form |
| 12/24/2012 | JOHN BEALL | COT NON-DSD | COMMUNITY PLANNING | Passed | Defer to Zoning |
| 12/26/2012 | PGEHLEN1 | ENV SVCS | REVIEW | Approved | Solid Waste Requirements are listed and ck'd off in the pre submittal for Minor Subdivision document. No comments are required at this time. Based on the plat it looks as though residential apc curbside service at Lee St will be requested. The plat is approved. Jeff Drumm, P.E. Environmental Manager City of Tucson Environmental Services 520-837-3713 |
| 12/27/2012 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Sherry Hyde Senior Property Technician Pima County Assessor's Office DATE: 12/26/12 RE: Assessor's Review and Comments Regarding S12-056 GRANITE HOUSE FINAL PLAT * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor's Office requirements. _______ Plat does not meet Assessor's Office requirements. COMMENTS: THANK YOU FOR YOUR SUBMITTAL. NOTE: THE ASSESSOR'S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
| 12/31/2012 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Reqs Change | SUBJECT: A Granite House S12-056 Tucson Electric Power Company (TEP) has received the Final Plat submitted for review December 21, 2012. TEP is unable to approve the plat at this time. The completion of an electrical design is necessary to determine our easement requirements and conduct a review of the final plat. Additional plans are necessary for preparation of the design. Submit the AutoCAD version of the plat on a CD or email to me at mburke@tep.com<mailto:mburke@tep.com>. If you have any questions, please feel free to contact me at 917-8744 Thank you, Mary Burke Right of Way Agent Tucson Electric Power Co. Mail Stop HQW603 PO Box 711, Tucson, AZ 85702 Office - 520-917-8744 Cell - 520-401-9895 mburke@tep.com |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 02/28/2013 | FERNE RODRIGUEZ | OUT TO CUSTOMER | Completed |