Plan Number: S12-045
Parcel: Unknown

Review Status: Completed

Review Details: LOT SPLIT REVIEW

Plan Number - S12-045
Review Name: LOT SPLIT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/12/2012 CPIERCE1 START PLANS BEING WALKED THRU Completed
09/12/2012 PGEHLEN1 COT NON-DSD REAL ESTATE Passed Zoning will review for the 1 foot no access easement.
09/12/2012 PGEHLEN1 COT NON-DSD TUCSON POLICE DEPARTMENT Passed Subdivision not required.
09/17/2012 STEVE SHIELDS ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Spalding Lot Split
S12-045 (1st Review)
Lot Split

TRANSMITTAL DATE: September 17, 2012


COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. The Zoning Review Section conditionally approves the Lot Split, subject to the following changes on the executed lot split documents. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements

2. Provide the sequence number for the proposed 1.0' no access easement that runs along the west side of the 50' assess easement on the plan.

3. Provided copies of the recorded deeds and legal descriptions.

4. Once the above comments are addressed Zoning is willing to provide an over-the-counter review. Call or email to schedule and appointment for this review.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised lot split documents along with the recorded deeds and legal descriptions
09/19/2012 RONALD BROWN H/C SITE REVIEW Denied Add a note that all future new dwelling construction shall comply with the Inclusive Home Design Ordinance #10463.
09/19/2012 JASON GREEN ENGINEERING REVIEW Approv-Cond DATE: September, 19, 2012
SUBJECT: Lot Split
TO: Star Consulting
LOCATION: 9970 E Millmar Road, T14S R13E Sec22 Ward 4
REVIEWERS: Jason Green, CFM
ACTIVITY: S12-045 (formerly S08-026)


SUMMARY: Engineering Division of Development Services Department has received and reviewed the proposed Lot Split, Legal Exhibits, and Hydrology Statement (JE Fuller/Hydrology & Geomorphology, 26FEB07 revised 18SEP12). The Lot Split is conditionally approved at this time. Please address the following comments prior to final approval:

1) Provide the recordation information for the 1-foot no access easement as labeled in plan view along the west side of the 50-foot ingress/egress easement.

2) Provide a copy of the recorded legal descriptions for Parcel 1 and 2. The legals that were submitted have been reviewed and must be processed through the Recorders Office.

3) The lot split application is just that a lot split. The proposed SFR is still required to get a building permit, grading permit, floodplain use permit and right of way permit for construction. It is acknowledged that the lot split plan can be used for the building plan application; however additional information/details may be required to verify that all floodplain conditions have been met. An example is clearly delineating on the plan the disturbed area and provides temporary fencing for areas in the floodplain that must remain undisturbed and protected during construction. 2 elevation certificates will be required for the new single family residence for the P2S and P2F inspections.


GENERAL COMMENTS:

Provide the above information for final approval of the lot split application. Engineering Division will provide the final sign off and approval once the recorded documents are provided.

For any questions or to schedule a meeting, call me at (520) 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
Planning & Development Services
09/20/2012 ROBERT SHERRY PLUMBING-COMMERCIAL REVIEW Denied Verify the first floor elevation and compare it with the rim elevation of manhole #6592-03. Add a note requiring the installation of a backwater valve for the building sewer if the first floor elevation is less than 12" above the rim of the manhole.
09/26/2012 JOE LINVILLE LANDSCAPE REVIEW Denied The Native Plant Preservation application is not approved due to the presence of protected native plants per LUC 3.8.5. Development on either parcel as depicted on the site plan requires a Native Plant Preservation Plan/Landscape Mitigation Plan. LUC 3.8
09/27/2012 JOHN BEALL COT NON-DSD COMMUNITY PLANNING Approved
10/01/2012 PGEHLEN1 ZONING-DECISION LETTER WRITE DECISION LETTER Denied The review has been completed. Resubmittal is required.
10/01/2012 JOSE ORTIZ COT NON-DSD TRAFFIC Approved TDOT-Traffic has no objections to the proposed lot split.
10/02/2012 PATRICIA GEHLEN ZONING-RECORDATION REVIEW Passed

Final Status

Task End Date Reviewer's Name Type of Review Description
10/29/2012 CINDY AGUILAR REJECT SHELF Completed