Plan Number: S12-015
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - REVIEW

Plan Number - S12-015
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/09/2012 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/09/2012 FERNE RODRIGUEZ COT NON-DSD REAL ESTATE Passed
03/09/2012 MARTIN BROWN FIRE REVIEW Approved
03/09/2012 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approved
03/13/2012 STEVE SHIELDS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Steve Shields
Lead Planner

PROJECT: Plaza Centro
S12-015 (1st Review)
Final Plat

TRANSMITTAL DATE: March 13, 2012

DUE DATE: March 15, 2012

COMMENTS: Please resubmit revised drawings along a response letter, which states how all Zoning Review Section comments regarding the Land Use Code and Development Standards were addressed.

1. D.S. 2-03.6.1.K Place the S12-015 subdivision case number in the lower right hand corner of the plat adjacent to the title block.

2. D.S. 2-03.6.1.K Place the DP12-0029 reference case number in the lower right hand corner of the plat adjacent to the title block.

3. D.S. 2-03.6.2.B Under General Note 2 the total number of units is 13, under 'BUILDING CALCULATIONS" only 12 are listed, clarify.

4. D.S. 2-03.6.3.D Revise the "RECORDING" Block to read

SEQUENCE _______________
FEE ______________________
STATE OF ARIZONA
COUNTY OF PIMA
I HEREBY CERTIFY THAT THE INSTRUMENT WAS FILED FOR RECORD AT THE REQUEST OF __________________________ DATE ________________________ TIME _____________________________ WITNESS MY HAND AND OFFICIAL SEAL DAY AND YEAR ABOVE WRITTEN. F. ANN RODRIGUEZ, COUNTY RECORDER
BY ____________
DEPUTY

5. D.S. 2-03.6.6 Provide a copy of the revised Covenants, Conditions and Restrictions (CC&R's) with your next submittal.

6. There are numerous square footage differences shown on the final plat and development package, see DP12-0029 comments.

If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956

C\planning\cdrc\finaplat\s12-015fp.doc

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Revised final plat & CC&R's.
03/13/2012 ED ABRIGO PIMA COUNTY ASSESSOR Approved Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)


FROM: Sherry Hyde
Senior Property Technician
Pima County Assessor’s Office


DATE: 3/12/12


RE: Assessor’s Review and Comments Regarding
S12-015 PLAZA CENTRO AMENDED


* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

X Plat meets Assessor’s Office requirements.
_______ Plat does not meet Assessor’s Office requirements.

COMMENTS:

• THE TITLE BLOCK IN THE LOWER RIGHT HAND CORNER NEEDS TO STATE THAT THIS IS A RESUBDIVISION OF PLAZA CENTRO GARAGE M&P 65/38.
• ON THE 1ST PAGE UNIT 1B IS MISSING IN THE “BUILDING CALCULATIONS”.
• ON THE 1ST PAGE THE SQUARE FOOTAGE IS LISTED AS 5,035. ON SHEET 3 IT’S LISTED AS 5,053 SF.

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
03/13/2012 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Approved Tucson Electric Power Co. (TEP) approves the final plat submitted for review March 09, 2012.

Any additional easements required to serve this project must be secured by separate instrument.

Please forward any resubmittals of the final plat to this office. Feel free to contact me at (520)917-8744 if you have any questions.

Thank you,

Mary Burke
Right of Way Agent
Tucson Electric Power Company
Mail Stop HQW603
PO Box 711
Tucson, AZ 85702
520-917-8744 Office
520-401-9895 Cell
mburke@tep.com
03/13/2012 JASON GREEN ENGINEERING REVIEW Approv-Cond DATE: March 13, 2012
SUBJECT: Plaza Centro Final Plat Submittal- Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 400 N Toole Ave, T14S R13E Sec12 Ward 1
REVIEWER: Jason Green, CFM
ACTIVITY: S12-015

SUMMARY: Engineering Division of Planning and Development Services Department has received and reviewed Sheets 1-5 of the proposed Final Plat and Title Report. Engineering Division has reviewed the submitted Final Plat and Title Report and recommends conditional approval of the Final Plat at this time. The following items need to be addressed prior to Mylar submittal to CDRC:

FINAL PLAT COMMENTS:

1) DS Sec.2-03.6.1.K: Revise the Final Plat to indicate the subdivision cases number assigned (S12-015) in the lower right corner of the plans on all sheets.

2) DS Sec.2-03.6.3.D: Revise the Recording Data Section to read per the new Pima County Recorders Office format, refer to the following link; http://cms3.tucsonaz.gov/sites/default/files/dsd/CDRC/Sequence%20Number%20Format%20Memo.pdf

3) DS Sec.2-03.6.6: Provide a copy of the recorded CC&Rs for verification that all revisions and additions of Units and Common Element "1" are still accurate for maintenance and liability for the Amended Final Plat.

GENERAL COMMENTS:

Provide the Final Plat Mylar and a copy of the CC&Rs (revised if applicable) at re-submittal addressing the above comments. For questions or to schedule a meeting I can be reached at 837-4929.



Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Planning & Development Services
03/13/2012 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 2ND FL
TUCSON, AZ 85701-1207

AUDREY FARENGA
ADDRESSING REVIEW
PH #: 740-6800
FAX #: 623-5411


TO: CITY PLANNING
FROM: AUDREY FARENGA, ADDRESSING REVIEW
SUBJECT: S12-015 AMENDED PLAZA CENTRO – RAILYARD/FINAL PLAT
DATE: March 12, 2012



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

1. Correct the re-subdivision information on all title blocks. It should be the most current Plaza Centro Garage 65/38.
2. Renumber the units, no letters.
3. Is 1B missing from the Building Calculations list?
03/13/2012 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Denied AUDREY FARENGA
ADDRESSING REVIEW
PH #: 740-6800
FAX #: 623-5411


TO: CITY PLANNING
FROM: AUDREY FARENGA, ADDRESSING REVIEW
SUBJECT: S12-015 AMENDED PLAZA CENTRO – RAILYARD/FINAL PLAT REVISED
DATE: April 10, 2012



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.


***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through Pima
County Addressing. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***
03/14/2012 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved
03/15/2012 PGEHLEN1 PIMA COUNTY WASTEWATER Approved PIMA COUNTY
REGIONAL WASTEWATER RECLAMATION DEPARTMENT
201 NORTH STONE AVENUE
TUCSON, ARIZONA 85701-1207
JACKSON JENKINS PH: (520) 740-6500
DIRECTOR FAX: (520) 620-0135
March 14, 2012


To: Martin V. Magelli, PE., Project Manager
Baker & Associates Engineering, Inc.

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: Kristin L. Greene, P.E., CE Manager
RWRD, Development Review Manager

Subject: Amended Condominium Final Plat for
Plaza Centro - Railyard
Units 1A, 1B, 1C, 2, 3, 4,5A, 5B, 5C, 5D, 6A, 6B, and 7 and Common Element "1"
Final Plat - 1st Submittal, S12-015, Review Comments

The drawings of the Final Plat for the proposed project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department.
PCRWRD hereby approves the above referenced submittal of the Final Plat received by us on March 9, 2012.
Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) will need to be obtained from PDEQ.

If you have any questions regarding the above comments, please do not hesitate to contact me.




Kristin L. Greene, P.E.
Civil Engineering Manager, Development Liaison Unit



Cc: Chad Amateau, P.E., RWRD
Chandubhai Patel, P.E., RWRD
Project file
03/15/2012 JOHN WILLIAMS ZONING-DECISION LETTER REVIEW Approv-Cond COMMUNITY DESIGN REVIEW COMMITTEE
PLANNING & DEVELOPMENT SERVICES

March 15, 2012


Lisa Bowers
Metro Tucson Expediting & Development
2940 N. Swan Road # 212
Tucson, Arizona 85712

Subject: S12-015 PLAZA CENTRO Final Plat

Dear Lisa:

The above referenced project has been CONDITIONALLY APPROVED by the Community Design Review Committee. Please make any necessary corrections and submit the following documents:

1 Executed Final Plat Double Matte Océ or Photo Mylar.

2 Title reports current within the last thirty (30) days.

1 Check made payable to “Pima County Recorder” in the amount of $20.00 per plat page plus a $4.00 handling fee, along with CC&R fees if applicable. CC&R fees are $9.00 for the first 5 pages and $1.00 for each additional page and fees for consent(s) to dedicate, if applicable.

1 Original Set of Executed and notarized CC&R’s document (if applicable) and Assurance Package (if applicable).

1 Copied Set of Executed and notarized CC&R’s document (if applicable) and Assurance Package (if applicable).

1 CD with Digital Copy in PDF Format of Plat, CC&R’s (if applicable) and Assurances (if applicable).

*** NOTICE ***
The CDRC office will require that PIMA COUNTY ADDRESSING review and approve the mylar prior to submittal to the CDRC office. The CDRC office will require written confirmation of this approval prior to submittal, an email is okay.

Assurances (if applicable) must be reviewed by the City Attorney’s Office prior to being presented to the Mayor and Council. Plats, CC&R’s and assurances must be approved at the same Mayor and Council Meeting. Please expect 5-6 weeks from the date submitted to the date scheduled for Mayor and Council approval.

Should you have any questions, please call me at 837-4893.

Sincerely,


John Williams
Planning Technician


All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 318-1930