Plan Number: S11-050
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S11-050
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
01/27/2012 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
02/07/2012 JWILLIA4 PIMA COUNTY WASTEWATER Approved PIMA COUNTY
REGIONAL WASTEWATER RECLAMATION DEPARTMENT
201 NORTH STONE AVENUE
TUCSON, ARIZONA 85701-1207
JACKSON JENKINS PH: (520) 740-6500
DIRECTOR FAX: (520) 620-0135
February 3, 2012


To: Kevin Hall, Project Manager
Cypress Civil Development

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: Kristin L. Greene, P.E., CE Manager
RWRD, Development Review Manager

Subject: Sorrento Square Retail Center
Lots 1 through 10 & Common Areas A, B & C
Final Plat – 2nd Submittal, S11-050, review comments

The drawings of the Final Plat for the proposed project have been reviewed on behalf of Pima County Department of Environmental Quality (PDEQ) and Pima County Regional Wastewater Reclamation Department (PCRWRD).This review letter may contain comments pertaining to either Department. The following comments are offered.
The PCRWRD hereby approves the above referenced submittal of the Final Plat received by us on January 27, 2012.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) will need to be obtained from PDEQ.

Also, air quality activity permits must be secured by the developer or prime contractor from PDEQ before constructing, operating or engaging in an activity which may cause or contribute to air pollution.

If you have any questions regarding the above comments, please do not hesitate to contact me.


Kristin L. Greene, P.E.
Civil Engineering Manager, Development Liaison Unit


Cc: Chad Amateau, P.E., RWRD
Chandubhai Patel, P.E., RWRD
Project file
02/17/2012 JWILLIA4 UTILITIES TUCSON ELECTRIC POWER Approved Re: Sorrento Square Retail Center - Final Plat Resubmittal
S11-050


Tucson Electric Power Co. (TEP) approves the final plat submitted for review January 27, 2012. Electric service will be provided in accordance with the rules and regulations approved by the Arizona Corporation Commission. Please forward any resubmittals of the final plat to this office.

Should you have any questions, please contact me at 917-8744.

Thank you,

Mary Burke
Right of Way Agent
Tucson Electric Power Company
PO Box 711
Mail Stop HQW603
Tucson, AZ 85702
520-917-8744 Office
520-401-9895 Cell
mburke@tep.com
02/22/2012 JWILLIA4 PIMA COUNTY ADDRESSING Approv-Cond 201 N. STONE AV., 2ND FL
TUCSON, AZ 85701-1207


AUDREY FARENGA
ADDRESSING REVIEW
PH #: 740-6800
FAX #: 623-5411


TO: CITY PLANNING
FROM: AUDREY FARENGA, ADDRESSING REVIEW
SUBJECT: S11-050 SORRENTO SQUARE/REVIED FINAL PLAT
DATE: February 22, 2012



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project.

On the Final Plat include the common area uses in parenthesis after each letter on all the title blocks.


***The Pima County Addressing Section can use digital CAD drawing files when
submitted with your final plat Mylar. These CAD files can be submitted through Pima
County Addressing. The digital CAD drawing files expedite the addressing
and permitting processes when we are able to insert this digital data into the County’s
Geographic Information System. Your support is greatly appreciated.***
02/22/2012 LAITH ALSHAMI ENGINEERING REVIEW Denied Laith Alshami, Engineering and Floodplain Review, 02/22/2012,

TO: Patricia Gehlen FROM: Laith Alshami, P.E.
CDRC Engineering

SUBJECT: Sorrento Square Retail Center
S11-050, T14S, R15E, SECTION 26

RECEIVED: Final Plat and Title Report on January 27, 2012

The subject project has been reviewed. The project can not be approved at this time. Address the following comments before review can continue. Prepare a detailed response that explains the revisions that where made and references the exact location in the Final plat and in the Title Report where the revisions were made:

Final Plat:

1. Explain why assurances are not required for this project. If the typical assurable items have not been installed, assurances are required to assure the construction of the proposed infrastructure within the common areas. If assurances are submitted in the form of a "Third Party Land Trust", The "Beneficiary" Block must be added (D.S. 2-03.6.3.C.) and (D.S. 2-03.6.3.E.).
2. Whether the assurable items have been completed or not, the "Assurances" Block is required on the Final Plat. Revise the plat accordingly (D.S. 2-03.6.3.E.).
3. Provide an "Easements Details" table on the plat to include all "not plottable" easements (such as the electrical easement recorded as Book 69 of Misc. Records, Page 72) (D.S. 2-03.6.4.A.).
4. The description of the water easement, recorded as 2011-2240927, on the plat does not match the Title Report description. Revise as necessary (D.S. 2-03.6.4.A.).
5. The public access easement recorded as 2011-0880945 does not appear to have been included in the Title Report. Revise as necessary (D.S. 2-03.6.4.A.).
6. The 10'public electric easement recorded as 2011-1190890 does not appear to have been included in the Title Report. Revise as necessary (D.S. 2-03.6.4.A.).
7. Show the required setbacks from the proposed detention/retention basins (D.S. 2-03.6.4.E.).
8. Provide the closure calculations report (D.S. 2-03.6.5.C.3).


RESUBMITTAL REQUIRED: Revised Final Plat and Assurances
02/23/2012 PGEHLEN1 CC&R CC&R's Approved
02/24/2012 TERRY STEVENS ZONING REVIEW Approv-Cond CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: S11-050
Sorrento Square Retail Center
Final Plat

TRANSMITTAL: 02/24/2012

DUE DATE: 2/28/2012

COMMENTS:


1. The Zoning Review Section approves the final plat for this subdivision, subject to the following changes on the executed final plat. However, should there be any changes requested by other CDRC members, the Zoning Review Section approval is void, and we request copies of the revised final plat to verify that those changes do not affect any zoning requirements.

2. DS 2-03.6.3 The following ASSURANCE block must be placed on the plat's first sheet.
ASSURANCES
"This is to certify that all improvements, such as streets, sidewalks, sewers, water
and utility installation, drainage and flood control facilities, and monuments,
required by the City of Tucson have been completed or the future completion of
such improvements has been assured by the posting of performance bonds,
assurances, or other security as the City of Tucson deems necessary and proper."

_______________________________________________
City of Tucson Development Services Department Director


_______________________________________________
City of Tucson Engineer


If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961

TLS C:\planning\cdrc\finalplat\S11-050fpca.doc
02/27/2012 JOHN WILLIAMS ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
PLANNING & DEVELOPMENT SERVICES

February 27, 2012

Kevin M. Hall
Cypress Civil Development
2102 N. Country Club # 9
Tucson, Arizona 85716

Subject: S11-050 SORRENTO SQUARE RETAIL CENTER Final Plat

Dear Kevin:

Your submittal of November 4, 2011 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 4 DETAILED cover letters explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

4 Copies Revised Final Plat (Addressing, Engineering, Zoning, PDSD

2 Copies Assurances Documents (Engineering, PDSD)

Should you have any questions, please call me at 837-4893.


Sincerely,




John Williams
Planning Technician