Plan Review Detail
Review Status: Completed
Review Details: REVISION - TENT PLAT & CORE RESUB
Plan Number - S11-038
Review Name: REVISION - TENT PLAT & CORE RESUB
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/05/2015 | JOE LINVILLE | LANDSCAPE | REVIEW | Reqs Change | Changes designated buffers or perimeter landscaping, as delineated in the PAD, which was established to adapt the PAD to specific site characteristics or mitigate development impacts on the site and surrounding area may be considered a major change. An amendment may be required. UDC 3.5.5.J.2.c 2) Clarify the intent of the dark gray areas superimposed over the approved landscape plans. |
| 01/05/2015 | ZELIN CANCHOLA | COT NON-DSD | TRAFFIC | Approved | |
| 01/06/2015 | RONALD BROWN | H/C SITE | REVIEW | Reqs Change | SHEETS 5 AND 8 1. Note 10 refers to an arbour walk and references detail 13 sheet 3. a. This note has been ":X"ed out at all the newly added arbour walks and of course there is no sheet 3 attachedto this submittal. b. Add anoter note calling out the new arbour walks and that all slopes are to comply with the 2009 ICC A117.1, Section 403.3; 5% maximunm running slope and 2% maximum cross slope. 2. Provide a width dimension for all newly added walks. If less than 5', provide a 5' square passing lane at every 200'. END OF REVIEW |
| 01/06/2015 | JANE DUARTE | COT NON-DSD | PARKS & RECREATION | Approved | Trails improvements which have been constructed at Sierra Morado Unit 4 meet the intent of the trails requirement of the Civano Master Plan PAD. Tucson Parks and Recreation recommends approval. Howard B. Dutt, ASLA Landscape Architect Tucson Parks & Recreation (520) 837-8040 Fax: (520) 791-4008 Howard.Dutt@tucsonaz.gov |
| 01/06/2015 | MARTIN BROWN | COT NON-DSD | FIRE | Approved | |
| 01/07/2015 | PATRICIA GEHLEN | ZONING-DECISION LETTER | REVIEW | Reqs Change | This review has been completed and resubmittal is required. Please resubmit the following items: 1) Three rolled sets of the plans 2) All items requested by staff 3) All items required to approve the plan |
| 12/18/2014 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 12/24/2014 | JASON GREEN | ENGINEERING | REVIEW | Approved | |
| 12/30/2014 | MICHAEL ST. PAUL | ZONING | REVIEW | Reqs Change | CDRC TRANSMITTAL FROM: Michael St Paul Planning Technician PROJECT: S11-038 5685 South Sunrise Peak Road Revision to Sierra Morado Unit 4 (Civano PAD 12) TRANSMITTAL: December 29, 2014 COMMENTS: Please attach a response letter with the next submittal, which states how all Zoning Review Section comments regarding the Unified Development Code (Section 8.4.1) and the Administrative Manual (Section 2-07) were addressed. "A final plat shall be approved and recorded within three years of the tentative plat approval date. A final plat is subject only to the ordinances in effect at the time of the tentative plat application except where an ordinance specifically states that it applies to pending applications" (UDC Section 8.5.2.A Final Plat Approval Period). After meeting with John Beall, we have come to the conclusion that the proposed revisions to the plat for Sierra Morado Unit 4 are inconsistent with the Planned Area Development (PAD 12) for Civano and Sierra Marado. Please contact John Beall concerning revision to the PAD (837-6966 or John.Beall@tucsonaz.gov). |
Final Status
| Task End Date | Reviewer's Name | Type of Review | Description |
|---|---|---|---|
| 01/12/2015 | CPIERCE1 | REJECT SHELF | Completed |