Plan Number: S11-014
Parcel: Unknown

Review Status: Completed

Review Details: RESUBMITTAL - CDRC - FINAL PLAT REVIEW

Plan Number - S11-014
Review Name: RESUBMITTAL - CDRC - FINAL PLAT REVIEW
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
06/22/2011 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
07/06/2011 FERNE RODRIGUEZ UTILITIES TUCSON ELECTRIC POWER Approved 4350 E. Irvington Road, Tucson, AZ 85714
Post Office Box 711, Tucson, AZ 85702


WR#236716 July 6, 2011


Real Estates Service
Attn: Mike Stib
4750 N. Oracle Rd. #210
Tucson, AZ 85705

To Mike Stib :

SUBJECT: Business Park of the Desert- Resubmittal
S11-014

Tucson Electric Power Company has reviewed and approved the development plan submitted June 21, 2011. It appears that there are a few conflicts with the existing facilities within the boundaries of this proposed development. Existing transformer is located at southeast corner of Bldg. II will need to be relocated north to the future incinerator to the approx. location of the trash enclosure on the West side of the building. 1) Drivable access to equipment must be maintained at all times. 2) the transformer on the Northwest corner of Building I must have clearance maintained with 3 ft on the sides and back and 10 ft in front, 6 foot screen wall would not maintain those clearances 3) Stubs, junction cabinet and easements would be required along the North side of Building II in order to relocate transformer at Building II. 4) Feeder extension may be required based on load calculations with additional easement requirements. 5) Service stubs will need to be installed in transformer at the NW corner of building I for future service at building III, easement may be required.

Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. The customer is responsible for the new trenching to relocate them as well as the relocation cost.

In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to:

Tucson Electric Power Company
Attn: Rich Harrington
New Business Project Manager
P. O. Box 711 (DB-101)
Tucson, AZ 85702
520-918-8726

Please call the area Designer Jessica Marchbanks at (520) 917-8737, should you have any questions.

Sincerely,


Henrietta Noriega
Office Specialist
Design/Build
hn
Enclosures
cc: City of Tucson , (Email only)
J. Marchbanks Tucson Electric Power
07/11/2011 JGREEN2 CC&R CC&R's Denied DATE:July 11, 2011
SUBJECT:Business Park of the Desert Final Plat Submittal- 2nd Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 7000 S Palo Verde Road, T15S R14E Sec16 Ward 5
REVIEWER: Jason Green, CFM
ACTIVITY: S11-014

SUMMARY: Engineering Division of Planning and Development Services Department has received, Sheets 1 and 2 of the proposed Final Plat and a draft copy of the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert. Engineering Division has reviewed the submitted Final Plat and CC&Rs and does not recommend approval of the Final Plat at this time. The following items need to be addressed:

FINAL PLAT COMMENTS:

1) Completed.

2) Completed.

3) Acknowledged. The recordation information for the CC&Rs must be included in the Dedication Paragraph on the Mylar prior to Mayor and Council submittal.

4) Acknowledged.

5) Completed.

6) Completed.

7) Restated: DS Sec.2-03.6.6.A: Revise the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert to accurately reflect all of the proper common area labels. Revise the following information within the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert:

a) Revise Section D of the Recitals to provide the description for Common Area "A." The property description must be included and must match the exact wording of the Title Block for the name, Lot #, Block # and the common area description.

b) Revise all Exhibits A, B and C within the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert. The Exhibits should have all blank areas filled in with the corresponding information for Sequence or Lot #. Also provide the description for Common Area "A."

c) Revise all portion of the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert that references "Instrument Number," instead these areas should reference "Sequence #."

d) Verify that all blanks within the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert are filled in. This is to include all references to the recordation information and blanks within the Exhibits.

8) Restated: DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until Financial Assurances are submitted and approved. No Assurances have been submitted at this time.

GENERAL COMMENTS:

Provide a revised Final Plat, CC&Rs and Original Assurances at re-submittal. The revised Final Plat package must address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Further comments may be generated upon resubmittal of the Final Plat package.

For questions or to schedule a meeting I can be reached at 837-4929.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Planning & Development Services
07/11/2011 JASON GREEN ENGINEERING REVIEW Denied DATE: July 11, 2011
SUBJECT: Business Park of the Desert Final Plat Submittal- 2nd Engineering Review
TO: Patricia Gehlen, CDRC Manager
LOCATION: 7000 S Palo Verde Road, T15S R14E Sec16 Ward 5
REVIEWER: Jason Green, CFM
ACTIVITY: S11-014

SUMMARY: Engineering Division of Planning and Development Services Department has received, Sheets 1 and 2 of the proposed Final Plat and a draft copy of the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert. Engineering Division has reviewed the submitted Final Plat and CC&Rs and does not recommend approval of the Final Plat at this time. The following items need to be addressed:

FINAL PLAT COMMENTS:

1) Completed.

2) Completed.

3) Acknowledged. The recordation information for the CC&Rs must be included in the Dedication Paragraph on the Mylar prior to Mayor and Council submittal.

4) Acknowledged.

5) Completed.

6) Completed.

7) Restated: DS Sec.2-03.6.6.A: Revise the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert to accurately reflect all of the proper common area labels. Revise the following information within the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert:

a) Revise Section D of the Recitals to provide the description for Common Area "A." The property description must be included and must match the exact wording of the Title Block for the name, Lot #, Block # and the common area description.

b) Revise all Exhibits A, B and C within the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert. The Exhibits should have all blank areas filled in with the corresponding information for Sequence or Lot #. Also provide the description for Common Area "A."

c) Revise all portion of the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert that references "Instrument Number," instead these areas should reference "Sequence #."

d) Verify that all blanks within the Declaration of Covenant, Conditions and Restrictions for Business Park of the Desert are filled in. This is to include all references to the recordation information and blanks within the Exhibits.

8) Restated: DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until Financial Assurances are submitted and approved. No Assurances have been submitted at this time.

GENERAL COMMENTS:

Provide a revised Final Plat, CC&Rs and Original Assurances at re-submittal. The revised Final Plat package must address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Further comments may be generated upon resubmittal of the Final Plat package.

For questions or to schedule a meeting I can be reached at 837-4929.


Jason Green, CFM
Senior Engineer Associate
Engineering Division
COT Planning & Development Services
07/18/2011 TERRY STEVENS ZONING REVIEW Denied See engineering comments regarding CC&Rs.
07/20/2011 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Denied July 21, 2011

To: Dan Castro
Rick Engineering

Thru: Patricia Gehlen, CDRC Manager
City of Tucson Development Services Department

From: Chandubhai C Patel, P.E., Civil Eng. Manager
Development Review Division (Wastewater)

Subject: Business Park of The Desert, Lots 1, 2 & 3 and Common Areas "A"
A Resubdivision of the Phase I Condominiums, S11-014
Submittal No. 2





Please see Comment nos. 1 & 3 of the Review Letter dated May 24, 2011 for the 1st Submittal of this project.


If you have any questions regarding the above comments, please do not hesitate to contact me.
07/20/2011 JOHN WILLIAMS ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
PLANNING & DEVELOPMENT SERVICES

July 20, 2011

Dan Castro
Rick Engineering Company Inc.
3945 E. Fort Lowell Rd. #111
Tucson, Arizona 85712

Subject: S11-014 BUSINESS PARK OF THE DESERT Final Plat

Dear Dan:

Your submittal of April 26, 2011 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 4 DETAILED cover letters explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

4 Copies Revised Final Plat (Engineering, Zoning, Wastewater, PDSD)

3 Copies CC&R’s (Engineering, Zoning, PDSD)

2 Copies Assurances (Engineering, PDSD)

1 Check Made out to “Pima County Treasurer” for $150.00 (Wastewater)

Should you have any questions, please call me at 837-4893.

Sincerely,



John Williams
Planning Technician

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: (520) 322-6956
07/20/2011 JOHN WILLIAMS ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
PLANNING & DEVELOPMENT SERVICES
*** REVISED ***
July 22, 2011

Dan Castro
Rick Engineering Company Inc.
3945 E. Fort Lowell Rd. #111
Tucson, Arizona 85712

Subject: S11-014 BUSINESS PARK OF THE DESERT Final Plat

Dear Dan:

Your submittal of April 26, 2011 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 4 DETAILED cover letters explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

4 Copies Revised Final Plat (Engineering, Zoning, Wastewater, PDSD)

3 Copies CC&R’s (Engineering, Zoning, PDSD)

2 Copies Assurances (Engineering, PDSD)

Should you have any questions, please call me at 837-4893.

Sincerely,



John Williams
Planning Technician

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: (520) 322-6956