Plan Review Detail
Review Status: Completed
Review Details: FINAL PLAT - REVIEW
Plan Number - S11-014
Review Name: FINAL PLAT - REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/26/2011 | FERNE RODRIGUEZ | START | PLANS SUBMITTED | Completed | |
| 04/26/2011 | FERNE RODRIGUEZ | COT NON-DSD | REAL ESTATE | Passed | |
| 04/29/2011 | JENNIFER STEPHENS | PIMA COUNTY | ADDRESSING | Approved | AUDREY FARENGA ADDRESSING REVIEW PH #: 740-6800 FAX #: 623-5411 TO: CITY PLANNING FROM: AUDREY FARENGA, ADDRESSING REVIEW SUBJECT: S11-014 BUSINESS PARK OF THE DESERT/FINAL PLAT DATE: April 29, 2011 The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and we hereby approve this project. ***The Pima County Addressing Section can use digital CAD drawing files when submitted with your final plat Mylar. These CAD files can be submitted through Pima County Addressing. The digital CAD drawing files expedite the addressing and permitting processes when we are able to insert this digital data into the County’s Geographic Information System. Your support is greatly appreciated.*** |
| 05/05/2011 | ED ABRIGO | PIMA COUNTY | ASSESSOR | Approved | Office of the Pima County Assessor 115 N. Church Ave. Tucson, Arizona 85701 BILL STAPLES ASSESSOR TO: CDRC Office Subdivision Review City of Tucson (FAX# 791-5559) FROM: Sherry Hyde Senior Property Technician Pima County Assessor’s Office DATE: May 5, 2011 RE: Assessor’s Review and Comments Regarding S11-014 BUSINESS PARK OF THE DESERT- FINAL PLAT * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * X Plat meets Assessor’s Office requirements. _______ Plat does not meet Assessor’s Office requirements. COMMENTS: THANK YOU FOR YOUR SUBMITTAL. NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED. |
| 05/13/2011 | LIZA CASTILLO | UTILITIES | TUCSON ELECTRIC POWER | Denied | 4350 E. Irvington Road, Tucson, AZ 85714 Post Office Box 711, Tucson, AZ 85702 WR#236716 May 13, 2011 Dear Mr. Castro: SUBJECT: BUSINESS PARK OF THE DESERT S11-014 Tucson Electric Power Company has reviewed and disapproved the development plan submitted May 11, 2011. It appears that there are conflicts with the existing facilities within the boundaries of this proposed development. Please show facilities on the plan. A facilities map is attached for reference. Existing equipment is located within proposed Pedestrian Access Easement. No structures or buildings may be placed on top of existing stubs or equipment. Conflicts can not be determined until facilities are properly indicated on the plan. Customer will be responsible for relocation costs and a new route for existing stubs. New easements may be required for relocation. Enclosed is a copy of a TEP facilities map showing the approximate location of the existing facilities. In order to apply for electric service, call the New Construction Department at (520) 918-8300. Submit a final set of plans including approved site, offsite and electrical load plans. Include a CD with the AutoCAD version of the plans. If easements are required, they will be secured by separate instrument. Your final plans should be sent to: Tucson Electric Power Company Attn: Ms. Rich Harrington New Business Project Manager P. O. Box 711 (DB-101) Tucson, AZ 85702 520-917-8726 Please call the area Designer Jessica Marchbanks at (520) 917-8737, should you have any questions. Sincerely, Henrietta Noriega Office Specialist Design/Build hn Enclosures Cc J.Marchbanks, Tucson Electric Power DSD, City of Tucson (E-Mail) |
| 05/24/2011 | JWILLIA4 | PIMA COUNTY | WASTEWATER | Denied | May 24, 2011 To: Dan Castro Rick Engineering Thru: Patricia Gehlen, CDRC Manager City of Tucson Development Services Department From: Chandubhai C Patel, P.E., Civil Eng. Manager Development Review Division (Wastewater) Subject: Business Park of The Desert, Lots 1, 2 & 3 and Common Areas "A" A Resubdivision of the Phase I Condominiums, S11-014 The drawings of the Final Plat for the proposed project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD).This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use. The 1.General: A Site Plan is required showing the existing and proposed sewers, point and method of connection, access, etc. for Lots 1 & 2. The Final Plat cannot be approved without first reviewing and approving the site plan. 2. Sheet 2: The extent and location of the 20-foot R/W is not clear. Please clarify by showing the R/W boundaries and properly pointing the arrow. 3. Please do not resubmit this Final Plat until the Site Plan gets approved. 4. All sheets: Show this project number S11-014 in the Title Block. 5. All sheets: Show the approved Site Plan number as a reference number near the Title Block. 6. The next submittal will need a review fee of $ 50.00. If you have any questions regarding the above comments, please do not hesitate to contact me. |
| 05/24/2011 | TERRY STEVENS | ZONING | REVIEW | Denied | CDRC TRANSMITTAL TO: Development Services Department Plans Coordination Office FROM: Terry Stevens Lead Planner PROJECT: S11-014 Business Park of the Desert Final Plat TRANSMITTAL: 05/24/2011 DUE DATE: 05/24/11 COMMENTS: 1. An applicant has one (1) year from the date of submittal to obtain approval of a final plat that complies with zoning and other development requirements in effect at the time of application. This final plat must be approved and recorded on or before 04/27/12. 2. DS 2-03.6.1.K this project has been assigned case number S11-014. Place this number near the lower right corner of all sheets. 3. Provide a copy of the approved site plan clearly indicating the proposed new lot line in order to verify location of the new lot line in relation to the proposed buildings. 4. Provide a revised copy of the CC&Rs with the number of lots (revise cover sheet to match cover sheet of plan) and revise the body of the document, in the CC&Rs cross access and if required cross parking will be required to be provided between Lot 1 and Lot 2. 5. DS 2-03.6.2.H Add the following note: "There will be no further division of lots without the expressed approval of the City of Tucson." If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961 TLS C:\planning\cdrc\finalplat\S11-014fp.doc |
| 05/25/2011 | JASON GREEN | ENGINEERING | REVIEW | Denied | DATE: May 24, 2011 SUBJECT: Business Park of the Desert Final Plat Submittal- Engineering Review TO: Patricia Gehlen, CDRC Manager LOCATION: 7000 S Palo Verde Road, T15S R14E Sec16 Ward 5 REVIEWER: Jason Green, CFM ACTIVITY: S11-014 SUMMARY: Engineering Division of Planning and Development Services Department has received, Sheets 1 and 2 of the proposed Final Plat, Draft Master Declaration of Covenant for Maintenance of Common Area Improvements, and a copy of the Title Report. Engineering Division has reviewed the submitted Final Plat and Title Report and does not recommend approval of the Final Plat at this time. The following items need to be addressed: FINAL PLAT COMMENTS: 1) DS Sec.2-03.6.1.K: Revise the Final Plat to indicate the subdivision cases number assigned (S11-014) in the lower right hand corner of the plans on all sheets. 2) DS Sec.2-03.6.2.H: Revise the Final Plat to include the following General Note: "There will be no further division of lots without the expressed approval of the City of Tucson." 3) DS Sec.2-03.6.3.B: Revise the Dedication paragraph to include the recordation # for the proposed CC&Rs. 4) DS Sec.2-03.6.3.D: Revise the Approval Paragraph to include all of the statement from the referenced section. The statement on the proposed plat should include all of the following language; "Witness my hand and official seal, the day and year above as written." 5) DS Sec.2-03.6.3.E: Revise the signature lines within the Assurance Section on Sheet 1 to include the entire name for the Planning & Development Services Department 6) DS Sec.2-03.6.4.A: Clarify on the proposed plat the existing drainage easement for the drainage infrastructure and detention/retention basin. Per the proposed the easement is to be granted by this Final Plat approval however the easement has already been dedicated by the last Final Plat for Business Park of the Desert recorded under Book 64 Page 57. Verify if there are changes in the easement that requires new recordation or revise to show the recordation number that currently exist for all easements. 7) DS Sec.2-03.6.6.A: Revise the Master Declaration of Covenant for Maintenance of Common Area Improvements to accurately reflect all of the proper common area labels and responsibility for maintenance and liability for any proposed commonly-owned areas. Revise the following information within the Master Declaration of Covenant for Maintenance of Common Area Improvements: a) Revise to accurately describe the property (Name, number of lots and blocks, common areas, with descriptions) per the Title Block. Either the Master Declaration of Covenant for Maintenance of Common Area Improvements or the Title Block must be revised and must match with exact wording for the name and all common areas. b) Provide all Exhibits A, B and C within the Master Declaration of Covenant for Maintenance of Common Area Improvements. All exhibits must be provided in order for the Master Declaration of Covenant for Maintenance of Common Area Improvements to be a complete package. c) Revise all portion of the Master Declaration of Covenant for Maintenance of Common Area Improvements that references Book and Page, instead these areas should reference the Sequence #. d) Verify that all blanks within the Master Declaration of Covenant for Maintenance of Common Area Improvements are filled in. 8) DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until Financial Assurances are submitted and approved. GENERAL COMMENTS: Provide a revised Final Plat at re-submittal. The revised Final Plat must address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments. Further comments may be generated upon resubmittal of the Final Plat. For questions or to schedule a meeting I can be reached at 837-4929. Jason Green, CFM Senior Engineer Associate Engineering Division COT Planning & Development Services |
| 05/25/2011 | JWILLIA4 | TUCSON WATER NEW AREA DEVELOPMENT | REVIEW | Approved | |
| 05/26/2011 | JOHN WILLIAMS | ZONING-DECISION LETTER | REVIEW | Denied | COMMUNITY DESIGN REVIEW COMMITTEE PLANNING & DEVELOPMENT SERVICES May 26, 2011 Dan Castro Rick Engineering Co, Inc. 3945 E. Fort Lowell Rd. # 111 Tucson, Arizona 85712 Subject: S11-014 Business Park of the Desert Final Plat Dear Dan: Your submittal of April 26, 2011 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and a set of 5 DETAILED cover letters explaining how each outstanding requirement has been addressed: ALL BLACKLINES MUST BE FOLDED 5 Copies Revised Final Plat (TEP, Wastewater, Zoning, Engineering, PDSD) 2 Copies Approved Site Plan (Zoning, PDSD) 3 Copies CC&R's (Zoning, Engineering, PDSD) Should you have any questions, please call me at 837-4893. Sincerely, John Williams Planning Technician All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/ Via fax: 520-322-6956 |