Plan Review Detail
Review Status: Completed
Review Details: LOT SPLIT REVIEW
Plan Number - S09-079
Review Name: LOT SPLIT REVIEW
Review Status: Completed
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/17/2010 | LOREN MAKUS | ENGINEERING | REVIEW | Approved | |
| 02/17/2010 | KEN VAN KARSEN | BUILDING-RESIDENTIAL | REVIEW | Approved | |
| 02/17/2010 | ROBERT SHERRY | PLUMBING-COMMERCIAL | REVIEW | Approved | |
| 02/17/2010 | SSHIELD1 | ZONING HC | REVIEW | Passed | |
| 07/27/2010 | STEVE SHIELDS | ZONING-RECORDATION | REVIEW | Completed | |
| 12/23/2009 | CPIERCE1 | START | PLANS BEING WALKED THRU | Completed | |
| 12/23/2009 | STEVE SHIELDS | ZONING | REVIEW | Approved | DSD Zoning Review Transmittal TO: Planning and Development Services Department Plans Coordination Office FROM: Steve Shields Lead Planner PROJECT: S09-079 31 E CAMINO VILLAS TRANSMITTAL DATE: December 23, 2009 COMMENTS: Site Plan OK D.D.O. required for: 1. Per LUC Section 3.2.6.4 R-2 Zone, Development Designator "I", Perimeter Yard Indicator "AA" the required perimeter yard setback is 6'-0" or 2/3 the height of the exterior wall. Required perimeter yard setback from the proposed property line to the residence located on Parcel 1 is based on the height of the proposed exterior wall. South exterior wall height of 12'-6" requires 8'-4" setback, 6'-0" proposed. 2. Per LUC Section 3.2.6.4 R-2 Zone, Development Designator "I", Perimeter Yard Indicator "AA" the required perimeter yard setback is 6'-0" or 2/3 the height of the exterior wall. Required perimeter yard setback from the proposed property line to the residence located on Parcel 2 is based on the height of the proposed exterior wall. North exterior wall height of 12'-6" requires 8'-4" setback, 7'-8" proposed. If you have any questions about this transmittal, please contact me at Steve.Shields@tucsonaz.gov or (520) 837-4956 |