Plan Number: S09-042
Parcel: Unknown

Review Status: Active

Review Details: LOT SPLIT REVIEW

Plan Number - S09-042
Review Name: LOT SPLIT REVIEW
Review Status: Active
Review Date Reviewer's Name Type of Review Description Status Comments
07/10/2009 CPIERCE1 START PLANS BEING WALKED THRU Completed
07/10/2009 ANY BUILDING-RESIDENTIAL REVIEW Active
07/10/2009 ANY PLUMBING-COMMERCIAL REVIEW Active
07/10/2009 ANY ZONING-RECORDATION REVIEW Active
07/10/2009 BIANCA RAMIREZ ENGINEERING REVIEW Approved Approved per Matt Flick 7/10/09
07/10/2009 Any ZONING HC SITE REVIEW Active
07/16/2009 MICHAEL ST. PAUL ZONING REVIEW Denied CDRC TRANSMITTAL


FROM: Michael St.Paul, Planning Technician

PROJECT:
S09-042
1989 West San Juan Trail
Lot Split and correction for existing unit.


TRANSMITTAL: July 15, 2009


COMMENTS: the following comments are relative to an application for a Design Development Option (DDO).


1) Provide plot plans for each of the proposed lots that meet all the plot plan requirements (see plot plan instruction and model provided with comments). Also provide a floor plan for each unit and elevations.

2) I have provided a copy of the DDO application and instruction. An application shall be required for each of the proposed lots.

3) Provide three copies of each proposed plot plan and elevation drawings for the DDO process along with one copy or each floor plan. (See the DDO application and instruction.)

4) Each of the proposed lots is within the R-1 Zone (LUC Section 2.3.4.2.A.1). The Development Designator for each lot is "G" (LUC Section 3.2.3.1.B). The Perimeter Yard Indicator is AA (LUC Section 3.2.6.4).

5) The minimum setback to any interior lot line in the R-1 Zone is the greater of six (6) feet or two-thirds (2/3) the structure's height facing each lot line (LUC Section 3.2.6.4).

A) The DDO process and approvals shall be required for the setback along the south property line for the proposed parcel A and the north property line for proposed parcel B. Please be certain to provide elevation with dimensions for each of the proposed lots.

B) The DDO process and approval shall also be required for the placement of unit 2 along the south property line as the unit was not built at the setback for which it was approved.

Please be aware that additional comments may be required relative to information provided with the subsequent submittals.