Plan Number: S09-026
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT PACKAGE

Plan Number - S09-026
Review Name: FINAL PLAT PACKAGE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
09/04/2009 JWILLIA4 START FINAL PLAT PACKAGE Completed
09/09/2009 PAUL MACHADO ENGINEERING REVIEW Approved Mylar package left with the zoning reviewer 9/4/09 and it was returned 9/4/09.
09/09/2009 PAUL MACHADO ENGINEERING REVIEW Approved Mylar package left with the engineering reviewer 9/4/09. It was returned 9/9/09.
09/09/2009 PAUL MACHADO ENGINEERING REVIEW Approved Mylar package left with the engineering administrator 9/9/09.
09/09/2009 PAUL MACHADO ENGINEERING REVIEW Approved Mylar package left with the deputy director 9/9/09. Returned to CDRC the same day.
09/10/2009 JWILLIA4 CDRC STAFF CITY AGENDA OFFICE Completed
09/10/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Mylar package left with the zoning reviewer 9/4/09 and it was returned 9/4/09.
09/10/2009 JWILLIA4 CDRC STAFF CITY CLERK'S OFFICE Completed
09/10/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Mylar package left with the engineering reviewer 9/4/09. It was returned 9/9/09.
09/10/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Mylar package left with the engineering administrator 9/9/09.
09/10/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Mylar package left with the deputy director 9/9/09. Returned to CDRC the same day.
09/10/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Mylar package left with the zoning reviewer 9/4/09 and it was returned 9/4/09.
09/10/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Mylar package left with the engineering reviewer 9/4/09. It was returned 9/9/09.
09/10/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Mylar package left with the engineering administrator 9/9/09.
09/10/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Mylar package left with the deputy director 9/9/09. Returned to CDRC the same day.