Plan Number: S09-018
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT PACKAGE

Plan Number - S09-018
Review Name: FINAL PLAT PACKAGE
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
04/10/2009 CDRC1 START FINAL PLAT PACKAGE Approv-Cond Applicant has been advised that recording fees and corrected CCR'S will be required prior to scheduling for Mayor and Council meeting.
04/10/2009 LOREN MAKUS ENGINEERING REVIEW Approved Mylar package left with Loren 4/10 and returned the same day.
04/10/2009 LOREN MAKUS ENGINEERING REVIEW Approved Two errors found on final plat; there are two # 5 lots, and 'areas' in the title block should read 'area'. W. Baker has been contacted. Message returned 4/13 by Jean Armstrong; OK with registrants (M. Magelli and W. Baker) to make changes.
04/10/2009 LOREN MAKUS ENGINEERING REVIEW Approved Mylar package left with JPV for review and signature 4/13. Returned 4/15.
04/10/2009 LOREN MAKUS ENGINEERING REVIEW Approved Mylar package left with Craig Gross 4/15. Returned to CDRC 4/16.
04/13/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Mylar package left with Loren 4/10 and returned the same day.
04/13/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Two errors found on final plat; there are two # 5 lots, and 'areas' in the title block should read 'area'. W. Baker has been contacted. Message returned 4/13 by Jean Armstrong; OK with registrants (M. Magelli and W. Baker) to make changes.
04/13/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Mylar package left with JPV for review and signature 4/13. Returned 4/15.
04/13/2009 BEVERLEY HESTER ENGINEERING ASSIGN REVIEW Completed Mylar package left with Craig Gross 4/15. Returned to CDRC 4/16.
04/16/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Mylar package left with Loren 4/10 and returned the same day.
04/16/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Two errors found on final plat; there are two # 5 lots, and 'areas' in the title block should read 'area'. W. Baker has been contacted. Message returned 4/13 by Jean Armstrong; OK with registrants (M. Magelli and W. Baker) to make changes.
04/16/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Mylar package left with JPV for review and signature 4/13. Returned 4/15.
04/16/2009 CRAIG GROSS ENGINEERING PROCESSING Approved Mylar package left with Craig Gross 4/15. Returned to CDRC 4/16.
04/21/2009 CDRC1 CDRC STAFF CITY AGENDA OFFICE Completed
04/21/2009 CDRC1 CDRC STAFF CITY CLERK'S OFFICE Completed