Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Plan Number: S09-016
Parcel: Unknown

Review Status: Completed

Review Details: FINAL PLAT - CONDO CONVERSION

Plan Number - S09-016
Review Name: FINAL PLAT - CONDO CONVERSION
Review Status: Completed
Review Date Reviewer's Name Type of Review Description Status Comments
03/23/2009 FERNE RODRIGUEZ START PLANS SUBMITTED Completed
03/27/2009 PGEHLEN1 TUCSON WATER NEW AREA DEVELOPMENT REVIEW Approved
03/31/2009 ED ABRIGO PIMA COUNTY ASSESSOR Denied Office of the Pima County Assessor
115 N. Church Ave.
Tucson, Arizona 85701

BILL STAPLES
ASSESSOR




TO: CDRC Office
Subdivision Review
City of Tucson (FAX# 791-5559)

FROM: Joyce Hays, Section Supervisor
Pima County Assessor’s Office
Mapping Department

DATE:


RE: Assessor’s Review and Comments Regarding Final Plat S09-016, Hedrick Condominiums, T13S-R14E-31.


* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *

Plat meets Assessor’s Office requirements.
____x__ Plat does not meet Assessor’s Office requirements.

COMMENTS: Our office tried contacting Oracle Engineering Group Inc., on 03/31/09 but there was no answer at the phone number (520)292-6711. The following changes need to be made before we can approve this plat:
There must be a section tie, with a bearing and dimension from a section corner to a point on the subdivision perimeter.
The Common Areas must be clearly defined with dims and bearings for each line.
The name of, and Map and Plat of any adjacent subdivisions, unsubdivided property should be labeled “unsubdivided”.
Brian Sloan
Pima County Assessor’s Office
Deeds/Splits/Mapping
740-4395

NOTE: THE ASSESSOR’S CURRENT INVOLVEMENT IN PROCESSING ITS MANUAL MAPS TO DIGITAL FORMAT IS EXPEDITED GREATLY BY EXCHANGE OF DIGITAL DATA. IN THE COURSE OF RECORDING THIS SUBDIVISION YOUR ASSISTANCE IN PROVIDING THIS OFFICE WITH AN AUTOCAD COPY WOULD BE GREATLY APPRECIATED. THANK YOU FOR ANY DIGITAL DATA PREVIOUSLY SUBMITTED.
03/31/2009 LEERAY HANLY BUILDING-COMMERCIAL REVIEW Approv-Cond OK BUT NEEDS FIRE REVIEW
03/31/2009 FERNE RODRIGUEZ COT NON-DSD TUCSON AIRPORT AUTHORITY Approved To Whom It May Concern:

Thank you for the opportunity to comment on S09-016 Hendricks
Apartments, a final plat review application for approximately 1 acre
located west of the northwest corner Campbell and Hendricks. This site
is not within the Tucson International Airport or Ryan Airfield public
disclosure areas or traffic pattern airspace.

The Tucson Airport Authority does not oppose this application.

Please contact me if you have any questions or concerns.

Respectfully,


Jordan D. Feld, AICP

Director of Planning

Tucson Airport Authority

7005 S. Plumer Ave.

Tucson, AZ 85756

jfeld@tucsonairport.org

www.tucsonairport.org

(520) 573-5115 office

(520) 573-8006 fax
03/31/2009 LEERAY HANLY ZONING HC SITE REVIEW Approved
04/07/2009 DAVID MANN COT NON-DSD FIRE Approved
04/15/2009 TERRY STEVENS ZONING REVIEW Denied CDRC TRANSMITTAL

TO: Development Services Department
Plans Coordination Office

FROM: Terry Stevens
Lead Planner

PROJECT: S09-016
Hedrick Condominiums
Final Plat - Condo Conversion

TRANSMITTAL: 04/15/2009

DUE DATE: 04/20/09

COMMENTS:

1. An applicant has one (1) year from the date of application to obtain approval and recordation of a final condominium plat that complies with zoning and other development requirements in effect at the time of application. This final condominium plat must be approved and recorded on or before 03/22/10.

2. DS 2-03.6.1.K Case number S09-016 has been assigned to this final plat. Please place this number in the right corner of all sheets of the final plat.

3. DS 2-03.6.3.D In the Approval section on sheet 1 of 2 revise the name of the clerk of the City of Tucson to read "Roger W. Randolph".

4. DS2-03.6.4.C Clearly identify the boundaries of all Common Elements "C" (parking).

There appears to be a 1' space along the east and west property lines at the Limited Common Elements which is not dimensioned. Clearly indicate which common element this area is included with.

If you have any questions about this transmittal, please call Terry Stevens, (520) 837-4961


TLS C:\planning\cdrc\finalplat\S09-016fp.doc
04/15/2009 BIANCA RAMIREZ ENGINEERING REVIEW Denied To: Patricia Gehlen DATE: April 13, 2009
CDRC/Zoning Manager FROM: Bianca Ramirez
Engineering Division
SUBJECT: 01_FINAL_PLAT_BASE
Final Plat S09-016 (First Review)
T13S, R14E, Section 31

RESUBMITTAL REQUIRED: Final Plat.

The Final Plat cannot be approved as submitted. Please address the following review comments prior to the next submittal.

Final Plat:

1. Please include a response letter to the comments along with the corrected copies of the Final Plat.
2. Assure that all common elements are used for sole use.
3. Project-location map drawn in the upper right corner of the first sheet shall provide the following information:
4. Identify major watercourse within the square mile area.
5. DS Sec.2-03.6.1.H.1: Verify that the title block on the proposed Final Plat and/or all applicable wording in the CC&R's to match each other. All names, common elements, limited common elements, and descriptions must have the same wording in the CC&R's as in the Title Block.
6. The S09-016 subdivision case number assigned to the approved tentative plat will be placed in the lower right corner of the plat next to the title block. If the property is subject to a rezoning case, the C9-__-__ rezoning case number is to be noted also.
7. If the property is subject to conditions of rezoning, add the following note: "This plat is subject to the conditions of rezoning case number C9-__-__, unless superseded by a subsequent rezoning ordinance."
8. This property is subject to floodplain requirements, add the following note: "Prior to issuance of any future building permits will require a Floodplain Use Permit for Lots 1-10."
9. Enclose each common element with a solid line each common area, private street, etc., that will have separate restrictions or a separate homeowners' association.
10. Ensure that each common element include, labeled square footage.
11. Add general note that states, "Property is located 100% within FEMA Zone AE". Provide FIRM Panel number in a general note on plan.
12. Show any detention/retention areas in a surveyable and readily retraceable manner in a separate common element.
13. Indicate primary control points, or descriptions and ties to such control points, to which all dimensions, angles, bearings, and similar data on the plat will be referred. Where a coordinate system has been established by the City Engineer or County Engineer, primary control points may be referenced thereto. At least one (1) corner of the subdivision will be tied by course and distance to a section corner, a quarter section corner, or an established City or County survey monument. The plat must include a description of that corner marker and an indication of how the bearings were determined. Corner tie recordation information is to be provided on the plat. Specifically call out section corner to tie (ie ¼ or 1/16).
14. Indicate tract boundary lines; right-of-way and centerlines of streets, easements, and other rights-of-way; and property lines of residential lots and other sites, with accurate dimensions, bearings, or deflection angles and radii, arcs, and central angles of all curves.
15. All boundary monumentation must be labeled as "found" or "set."
a. Fully describe and show all markings on found monuments.
b. A one-half (½) inch iron rod tagged by a registered land surveyor will be set at all corners upon completion of construction.
16. Please submit a copy of the subdivision boundary closure calculations.
17. DS Sec.2-03.6.4.A: Revise the Final Plat to include the recordation information for all proposed public easements that are depicted on the plat. Final Plat can not be approved prior to the recording and posting of these easements.
18. DS Sec.14.3.2: Provide a note on the Final Plat and within the CC&R's stating that, (a) the owner or home owners association shall be solely responsible for operation, maintenance, and liability for drainage structures; (b) that the owner or home owners association shall have an Arizona Registered Professional Civil Engineer prepare a certified inspection report for the drainage facilities at lease once each year, and that these regular inspection reports will be on file with the owner for review by City staff, upon written request; (c) that City staff may periodically inspect the drainage facilities to verify that scheduled and unscheduled maintenance activities are being performed adequately; and (d) that the owner or home owners association agree to reimburse the City for any and all costs associated with the maintaining of the drainage facilities, should the City find the owner or owners deficient in their obligation to adequately operate and maintain their facilities."
19. DS Sec.2-03.6.6: A final signed original copy of the CC&Rs is required for approval of the Final Plat. The Final Plat can not be approved prior to original CC&Rs being submitted and approved.

20. DS Sec.2-03.6.6.A: Verify the CC&R's to accurately reflect all of the proper common elements labels and responsibility for maintenance and liability for any proposed commonly-owned elements. Revise the following information within the CC&R's:

a) Revise to accurately describe the property (Name, number of units, common elements, limited common elements, with descriptions) per the Title Block. Both the CC&Rs and the Title Block must be revised to match with exact wording for the name and all Elements.
b) Provide all Exhibit's within the CC&Rs. All exhibits must be provided in order for the CC&Rs to be a complete package.
21. DS Sec.2-03.7.1.G: The final plat cannot be scheduled for Mayor and Council consideration until one of the following has been provided:
a) if there is any remaining construction, the financial assurances are submitted and approvable; or,
b) provide a copy of Certificate of Occupancy paperwork accepted by the City of Tucson for the final construction.


22. DS Sec.2-03.7.1.B: Provide signature and seal of both the Surveyor and Civil Engineers for the project. When engineering information (current floodplain conditions) is provided on the final plat, the seal and signature of the responsible engineer is also required. This will be required for approval of the Final Plat for this condo conversion.

23. Clarify the distance between limited common elements and east and west property boundaries. There are more than 2' of discrepancy for width of project. Label area with regard to which common element it belongs.


GENERAL COMMENTS:


24. The revised Final Plat and CC&R's to address the comments provided above. Include a comprehensive response letter addressing in detail responses to all of the above comments.

25. Further comments may be generated upon resubmittal of the Final Plat and CC&R's.

If you have any questions, I can be reached at 837-4928 or Bianca.Ramirez@tucsonaz.gov

Bianca Ramirez
Engineering Associate
City of Tucson/Development Services Department
201 N. Stone Avenue
P.O. Box 27210
Tucson, Arizona 85726-7210
(520) 837-4928 office
(520) 879-8010 fax
04/16/2009 FERNE RODRIGUEZ PIMA COUNTY WASTEWATER Approv-Cond April 15, 2009

TO: Peter Solonga
Oracle Engineering Group

THRU: Patricia Gehlen, CDRC Manager
City of Tucson, Development Services Department

FROM: Chandubhai C. Patel, P.E., Civil Eng. Manager
Development Review Division (Wastewater)

SUBJECT: Hedrick Condominiums Units 1-10, Common Elements “A”-“F”and Limited Common Elements “1-10”
A CONDOMINIUM CONVERSION PROJECT
Final Plat – 1st Submittal, S09-016


The drawings for the proposed Final Plat for the above-referenced project have been reviewed on behalf of the Pima County Department of Environmental Quality (PDEQ) and the Pima County Regional Wastewater Reclamation Department (PCRWRD). This review letter may contain comments pertaining to the concerns of either Department. The following comments are offered for your use.

All Sheets: Add a Project number SO9-016 to the Title Block. This number should be shown bolder and larger.

2. All Sheets: Add as across-reference number the project number under which these units were built.

SUBJECT TO THE ABOVE, the PDEQ and the RWRD hereby approve the above referenced submittal of the Final Plat received by us on March 19, 2009.

Please note the following: Approval of the above referenced submittal does not authorize the construction of public or private sewer collection lines, or water distribution lines. Prior to the construction of such features, a Construction Authorization (Approval To Construct) may need to be obtained from the Pima County Environmental Quality.

Also, air quality activity permits must be secured by the developer or prime contractor from the Pima County Department of Environmental Quality before constructing, operating or engaging in an activity which may cause or contribute to air pollution.

If you have any questions regarding the above comments, please do not hesitate to contact me.
04/20/2009 LIZA CASTILLO UTILITIES TUCSON ELECTRIC POWER Denied SUBJECT: Hedrick Condominiums
S09-016

Tucson Electric Power Company (TEP) has reviewed the final plat
submitted March 23, 2009. TEP is unable to approve the plat at this
time.

In order for TEP to approve the final plat, show the Public Utility
Easement granted in Docket 12695 at Page 5020 on the plat.

Show the requested easement on the resubmittal of the final plat.
Submit a copy to the City of Tucson for TEP's final approval.

Please contact me at (520) 917-8745 if you have any questions.


Liza Castillo, Right of Way Agent II
Tucson Electric Power Co.
Unisource Energy Services
offc-(520) 917-8745
fax-(520) 545-1416
lcastillo@tep.com
04/20/2009 ANDY STEUART COT NON-DSD REAL ESTATE Denied Review and comments are provided by Andy Steuart, Property Agent, City Manager's Office/Real Estate Program. (520) 837-6715

An easement recorded 12/7/05, Dkt. 12695 Pg. 5020, appears to cloud Title Report No. FNT0901937, Fidelity National Title Insurance Company. No record has been found to show the City and utility providers accepting this easement. Also, this easement was executed and recorded by the previous owner after the parcel was conveyed to Rodos Apartments, LLC.

If the Easement is not removed from the title report, the following items are requested:
1. Annotate the easement on Sht. 2 of 2.
2. Remove item 8 under General Notes, Sht 1 of 2.
3. Obtain acceptance from City and utility providers for the easement.
04/23/2009 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Denied Comments to post shortly
04/23/2009 JENNIFER STEPHENS PIMA COUNTY ADDRESSING Denied 201 N. STONE AV., 1ST FL
TUCSON, AZ 85701-1207

JENNIFER STEPHENS
ADDRESSING OFFICIAL
PH: 740-6480
FAX #: 740-6370


TO: CITY PLANNING
FROM: JENNIFER STEPHENS, ADDRESSING OFFICIAL
SUBJECT: S09-016 HEDRICK CONDOMINIUMS/FINAL PLAT
DATE: 4/27/09



The above referenced project has been reviewed by this Division for all matters pertaining to street naming/addressing, and the following matters must be resolved prior to our approval:

Correct Location Map scale.
Delete adjacent address, docket, page and tax code.
04/23/2009 PGEHLEN1 CC&R CC&R's Denied see engineering comments
04/24/2009 PATRICIA GEHLEN ZONING-DECISION LETTER REVIEW Denied COMMUNITY DESIGN REVIEW COMMITTEE
DEVELOPMENT SERVICES

April 24, 2009

Peter Salonga
Oracle Engineering Group Inc.
199 East Fort Lowell Road
Tucson, Arizona 85705

Subject: S09-016 Hedrick Condominiums Final Plat

Dear Peter:

Your submittal of March 23, 2009 for the above project has been reviewed by the Community Design Review Committee and the comments reflect the outstanding requirements which need to be addressed before approval is granted. Please review the comments carefully. Once you have addressed all of the comments, please submit the following revised documents and 7 set of the DETAILED cover letter explaining how each outstanding requirement has been addressed:

ALL BLACKLINES MUST BE FOLDED

7 Copies Revised Final Plat (Assessor, Engineering, Zoning, TEP, Real Estate Addressing, DSD)

2 Copies CC&R's (Engineering, DSD)

PLEASE NOTE THAT ADDRESSING HAS NOT YET POSTED COMMENTS. PLEASE DO NOT RESUBMIT THE PLANS UNTIL ADDRESSING COMMENTS ARE POSTED. IF IT IS AN APPROVAL, ONE LESS COPY OF THE REVISED DEVELOPMENT PLAN WILL BE REQUIRED UPON RESUBMITTAL

Should you have any questions, please call me at 837-4919.


Sincerely,


Patricia Gehlen
CDRC Manager

All comments for this case are available on our website at http://www.ci.tucson.az.us/dsd/

Via fax: 292-6144
fpresubmittal